A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

MMT Primary Mirror Actuator Test Stand Upgrade
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago November 11, 2014 Board Review.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
A. Castañeda 07 th September 2009 Generators and Detectors Permit Loop / CIBG / CIBO 0v0.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Test and Monitor with the CIBT.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
VME interface Fuse Transient suppressor Front panel leds PCB INIT_ integration Led driving VME common functions Software conventions Same chip SVT-PISA.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
MSS2 HARDWARE ASSEMBLY  FROM LAURENT DERONT. FORMAT STANDARD 6U CRATE  1 ST BACKPLANE INTERFACE CONNECTOR DB37 (Front side) TO DIN (Back Side) 1.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
Chiller control system Lukasz Zwalinski – PH/DT.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Signal Integrity Electro-Magnetic Compatibility Dependability.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
Single Board Controller Comments Roger Smith Caltech
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
 Introduction to Wide Area Networks 2 nd semester
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Development of T3Maps adapter boards
Realising the SMP 1. Safe Machine Parameters Overview
Update of MVD services and requests
Overview of CERN BIS and Communication Hardware
Injectors BLM system: PS Ring installation at EYETS
T1 Electronic status Conclusions Electronics Cards:
New xTCA Developments at SLAC
HCAL Data Concentrator Production Status
1v0.
MicroTCA Common Platform For CMS Working Group
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Programmable Logic Controllers (PLCs) An Overview.
Status of muon monitor R&D and construction
Presentation transcript:

A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation

BIS - Hardware Implementation 2 Introduction ● the different modules and their function have been explained ● those modules need mechanical support, power, cabling, etc..... ● objective is to cater for all Beam Interlock applications ● modular setup as from first hardware developments ● work not harder but smarter ● reduced number of types of modules ● fewer spare parts and easier to maintain ● not a revolution but evolution to current design ● in order to improve the EMC the “packaging” has to be part of the development

BIS - Hardware Implementation 3 First designs - 1/3 ● integrated Back-Panel with Burndy connectors ● Beam Interface card for current loops ● linked with cable to “Matrix” in VME crate ● Beam-1 and Beam-2 on individual PCBs ● redundant power supplies ● power supply card ● modular set-up (add as necessary 3U Interface Crate

BIS - Hardware Implementation 4 First designs - 2/3 ● compact design ● no lose wiring ● signals to Interface Crate via current loops ● powered from 3U Interface Crate 1U User Interface

BIS - Hardware Implementation 5 First designs - 3/3 ● CERN standard Front end Configuration ● “Core” board got signals via 25pin cables ● separate Optical board VME crate

BIS - Hardware Implementation 6 Towards an “All in One” crate ● supports the Burndy connectors for User Interfaces ● Developed 2 types: CIBPL and CIBPS ● different gender and size connectors to avoid patching errors ● sandwich construction ● 8 layer PCB, electrically tested ● avoids cabling errors ● no functional test, visual inspection only ● excellent EMC properties ● Permit-A & Permit-B on individual layers of the PCB ● many ground planes Backpanels

BIS - Hardware Implementation 7 The “BIS” VME crate - 1/3 ● AB/CO standard Front end Configuration ● introduced 11U model with redundant PSUs ● added card-cage at the back with Extenders ● supports the Backpanel 8U and 11U models of VME crate

BIS - Hardware Implementation 8 The “BIS” VME crate - 2/3 ● signal paths between VME-P2 and Backpanels ● 3U, 8 layer PCB, electrically tested ● avoids cabling errors ● no functional test, visual inspection only ● excellent EMC properties ● Beam-1 & Beam-2 on individual Extenders ● many ground planes Extenders in the card-cage CIBEA - 3x32pin connector CIBEB - 3x10pin connector

BIS - Hardware Implementation 9 The “BIS” VME crate - 3/3 ● AB/CO-standard Front-End CPU with Timing RX ● 1 or 2 sets of CIBM with CIBT ● signal paths via VME-P2 ● some modules are “slot-dependant” ● non traditional front panel arrangement ● CIBM has Optical Interface (CIBO) ● some crates have CIBG ● possible to “host” boards (e.g. SLP) ● Modular set-up (add as necessary) ● manufacturer does functional test ● manufacturer loads FPGA program ● manufacturer does power soak test ● same PCB for CIBM and CIBG Modules in the VME crate CIBT, CIBM, CIBG and CIBO

BIS - Hardware Implementation 10 The BIS User Interface ● same PCB for CIBUS and CIBUD ● sandwich construction ● avoids cabling errors ● manufacturer does functional test ● manufacturer loads FPGA program ● manufacturer does power soak test ● excellent EMC properties ● equipped with redundant PSUs 2U Single and Double Beam model

BIS - Hardware Implementation 11 The User Interface PSUs ● 2U models not OEM ● for redundancy 2 CIBD / User Interface ● manufacturer does functional test ● manufacturer does power soak test ● excellent EMC properties Power Supply Units

BIS - Hardware Implementation 12 Summary ● inter-group collaboration proved very profitable ● speedy prototyping enabled quick development cycle ● logical evolution from first trials to current design ● set-up manufacturing contract with industry ● positive feedback from manufacturer ● excellent results from pre-series manufacturing to date (*) ● many modules ready for series manufacturing (*) ● installed equipment performs well (*) CIBUS, CIBUD, CIBD, CIBPL, CIBPS, CIBEA, CIBEB

BIS - Hardware Implementation 13 FIN