NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005 Savannah River Site Spent Fuel Program Status.

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Advertisements

Damaged Fuel Storage and Recovery A Case Study Natraj C. Iyer Savannah River National Laboratory June 2, 2010 May 31,- June 4, 2010, IAEA, Vienna, Austria.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Progress on Cleanup of the INL Site for the INL Retired Employees Association Bob Iotti, President and CEO September 2008.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel November 25, 2013 Patrick Daly.
Hanford Spent Nuclear Fuel Status Presented by Sen Moy National SNF Strategy Meeting April 14,
5/19/2015 Segmentation of the Legacy C Area Disassembly Spent Fuel Pool Prepared by: Jon Guy, N&CSE Spent Fuel Project Lead UNCLASSIFIED DOES NOT CONTAIN.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
DIABLO CANYON SPENT FUEL STORAGE: SELECTED ISSUES
Overview of State Decommissioning Activities April & May 2015 (Mostly from a VT Public Service Department Perspective) Presented by Tony Leshinskie, VT.
IAEA Perspective and Lessons Learned in Shipping HEU Spent Fuel to Russia Institute of Nuclear Materials Management 48 th Annual Meeting July , 2007.
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
GTRI’s Nuclear Removal Programs Kelly Cummins Director of Former Soviet Union and Asian Threat Reduction National Nuclear Security Administration Presented.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
Presentation for Semi-Annual National Spent Nuclear Fuel Meeting April 14, 2005 Sen Moy, DOE-RL Hanford Spent Nuclear Fuel.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
Estimation of storage capacity needed or limits. Comparison with existing storage facilities. Lise-Lotte Spontón TW5-TSW-001, D4 Final meeting, TW5-TSW-001.
National Spent Nuclear Fuel Strategy Meeting April 15, 2009 Dawn Gillas Federal Program Manager Nuclear Material Programs Division DOE-SR SRS Spent Nuclear.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
SNF/HLW Repository Acceptance Presented by Steve Gomberg Office of Systems Analysis and Strategy Development Office of Civilian Radioactive Waste Management.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
September TRTR Conference U.S. Domestic Reactor Conversion Programs Eric Woolstenhulme Dana Meyer.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
INL SNF PROGRAM presented to National Spent Nuclear Fuel Program Technical Exchange Meeting November 8 - 9, 2005 Washington, DC presented by R. O. Ramsey.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
Overview of DOE’s Plans for Radioisotope Power Systems for Future NASA Space Exploration Missions Overview of DOE’s Plans for Radioisotope Power Systems.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Recovery of.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
1 X Oak Ridge Office of Environmental Management 2015 Site Status Report Presented by Vanna Gaffney.
DOE EM RAI and Contention Support NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Solving Cleanup Challenges Through Risk Reduction EM/RW Quality Assurance Activities Office of Standards and Quality Assurance (EM-64) April 15, 2009.
Andrew Griffith Office of Nuclear Energy, Science and Technology April 14, 2005 Andrew Griffith Office of Nuclear Energy, Science and Technology April.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Update to National Governors’ Association Patty Bubar Associate Deputy Assistant Secretary Office of Integration and Disposition May 16, 2002.
November 8, 2005 Mark Arenaz Headquarters SNF/HLW Integration Meeting.
Gerald G. Boyd Assistant Manager for Environmental Management
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
Savannah River Site Watch Columbia, South Carolina
Oyster Creek [Exelon Nuclear] Oyster Creek: Operated at power Scheduled Maintenance Outage April 24 – May 13 NRC Assessment (ROP Action Matrix): Licensee.
Low-Level Radioactive Waste (LLW) Disposition at the
On-site Storage of Spent Nuclear Fuel in the United States
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Air Transport of Commercial Spent Nuclear Fuel (SNF) Assemblies
Shipping to WIPP Travis R. Myers 5/24/17 GV ppt.
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
Possible Transition from Operating to Decommissioning
No Nukes No Where No How [the future of nuclear power]
Radioactive Waste and Spent Fuel Management in Hungary
Lesson from Savannah River
NRC Type B Package Certification Process, Issues and Updates
Multiphysics Simulation Story: Researching a New Fuel for the HFIR: Advancements at ORNL Require Multiphysics Simulation to Support Safety and Reliability.
Researching a New Fuel for the HFIR: Advancements at ORNL Require Multiphysics Simulation to Support Safety and Reliability Redesign High Flux Isotope.
Presentation transcript:

NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005 Savannah River Site Spent Fuel Program Status

L-Basin

Receipts Since Last Meeting Foreign: 5 casks from Japan Domestic: 7 casks HFIR/MURR/MIT

Work in Process L-Area Storage Racks (temp. hold) RBOF Cask Pad Cleanup Treatment and Storage Facility

Fiscal Year Equivalent MTREs Capacity with LASR ~ MTRE L-Basin Inventory – Without TSF LASR = L-Area Storage Rack project (FY00-06) MTRE = Material Test Reactor Equivalent

L-Basin HFIR Projection – Without TSF Fiscal Year HFIR Cores Capacity After LASR 208 cores 350 LASR = L-Area Storage Rack project (FY00-06) HFIR = High Flux Isotope Reactor (Oak Ridge)

Work in Process L-Area Storage Racks (temp. hold) RBOF Cask Pad Cleanup Treatment and Storage Facility

RBOF Cask Pad

Work in Process L-Area Storage Racks (temp. hold) RBOF Cask Pad Cleanup Treatment and Storage Capability

Status: SNF Treatment and Storage Facility CD-O package in approval process

Spent Nuclear Fuel Program Schedule Final closure/Disposition Basin Operations TSF Project Foreign SNF Receipt Program Domestic SNF Receipt Program TSC Operations Shipments to Repository Deactivate (By FY)

Issues Lack of formal, written program direction No TSF funding Identified Global Threat Reduction Initiative impacts Potential receipt of INEEL FRR shipments H-Canyon processing – near term decision