JOSEPH HOWARD a, GARY MOSIER a, KEITH PARRISH a, SHAUN THOMSON a, MARK MCGINNIS b, JEREMY REDDEN b, KONG Ha c, CARL BLAUROCK d a NASA-GODDARD SPACE FLIGHT.

Slides:



Advertisements
Similar presentations
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
Observational techniques meeting #7. Detectors CMOS (active pixel arrays) Arrays of pixels, each composed on a photodetector (photodiode), amplifier,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
KU Leuven MIRI team meeting
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS Instrument & VIRS Calibration.
A Preliminary Cycle 1 Calibration Plan for the JWST Science Instruments James Muzerolle.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
Mark Clampin Observatory Project Scientist Goddard Space Flight Center 217 th American Astronomical Society Meeting JWST Telescope Optics: Progress Report.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
JWST calibration requirements Harald Kuntschner. JWST - an overview NIRCam –0.6-5 microns –FoV: 2.16x4.4 arcmin (0.0317” for short band and ” for.
2009 IEEE Aerospace Conference “Spacecraft Jitter Prediction using 6-DOF Disturbance Measurements” Bryce Carpenter Oliver Martin Jason Hinkle Sierra Nevada.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
1 JWST Multi-Mega FE Model Studies Terry Fan/Swales Aerospace Mark McGinnis/Swales Aerospace Glenn Grassi/MSC.Software John Johnston, PH. D./GSFC May 4.
National Aeronautics and Space Administration Mark Swain THESIS – the Terrestrial and Habitable-zone Exoplanet Spectroscopy Infrared Spacecraft characterizing.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
AAAC Presentation JWST Status Eric P. Smith JWST Program Scientist.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
Hubble Science Briefing
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
Why Design Tool? 93 年 10 月 21 日. EPS Course - 2 Simple Problems Close form solution Complex Problems Computer.
JWST Calibration Error Budget Jerry Kriss. 15 March 20072/14 JWST Flux & Wavelength Calibration Requirements SR-20: JWST shall be capable of achieving.
The Active Optics System S. Thomas and the AO team.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
Henry Heetderks Space Sciences Laboratory, UCB
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
MIRI Dither Patterns Christine H Chen. Dithering Goals 1.Mitigate the effect of bad pixels 2.Obtain sub-pixel sampling 3.Self-calibrate data if changing.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
High resolution magnetoresistive position sensor for the JWST Tobias Junginger.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Hubble Science Briefing
Mega Telescopes of the 21 st Century Evolution in the Ground-Space Synergy Dr. Marc Postman (STScI) & Richard Ellis (Caltech) James Webb Space Telescope.
WFIRST DRM2 candidate design – payload summary At SDT7 3/1-2/2012 consensus for concepts w/out overlap w/ other mission, aka “DRM2” was: 1.1m aperture,
Contamination Analysis of Optical Telescope Assembly (OTA) April Electronic, Mechanical Components and Materials Engineering Group, Institute of.
APT Overview for Transiting Exoplanet Proposals Chris Moriarty – APT Developer.
Extended Detector Cutoff Considerations WFIRST Project Office May
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Optimization Strategies for the NIRSpec MSA Planning Tool James Muzerolle.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
FIRST LIGHT A selection of future facilities relevant to the formation and evolution of galaxies Wavelength Sensitivity Spatial resolution.
1 Integrated Modeling Stephen Merkowitz. 2 May 13, 2003 Integrated Modeling LISA has intricate interactions between subsystems that require an integrated.
Increased Thermal Background for the post-NCS NICMOS TIPS – June 19, 2003 Megan Sosey NICMOS.
JWST ISIM Primary Structure and Kinematic Mount Configuration Jonathan Kuhn, Tim Carnahan NASA/GSFC Code 542 Andrew Bartoszyk, Steve Hendricks, Charles.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Sample expanded template for one theme: Physics of Galaxy Evolution Mark Dickinson.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
NIRSpec - the JWST Multi-Object Spectrograph P. Jakobsen (ESA), S. Arribas (CSIS), T. Beck (STScI), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford),
Single Object Spectroscopy and Time Series Observations with NIRSpec
NIRSpec Time Series Observations
Single Object & Time Series Spectroscopy with JWST NIRCam
Capitalization style for Presentation Title is “Title Case”
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
James Webb Space Telescope
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
Jesper Schou Instrument Scientist
Henry Heetderks Space Sciences Laboratory, UCB
Launch and On-orbit Checkout
Presentation transcript:

JOSEPH HOWARD a, GARY MOSIER a, KEITH PARRISH a, SHAUN THOMSON a, MARK MCGINNIS b, JEREMY REDDEN b, KONG Ha c, CARL BLAUROCK d a NASA-GODDARD SPACE FLIGHT CENTER, GREENBELT, MD b SWALES AEROSPACE, BELTSVILLE, MD c SGT, GREENBELT, MD d NIGHTSKY SYSTEMS, RALEIGH, NC THE JAMES WEB SPACE TELESCOPE (JWST) IS A LARGE, INFRARED-OPTIMIZED, SPACE TELESCOPE SCHEDULED FOR LAUNCH TO L2 IN  IT MUST MEET RIGOROUS THERMAL STABILITY REQUIREMENTS, ALMOST ALL OF WHICH WILL BE VERIFIED THROUGH ANALYSIS. TERRESTRIAL TESTING WILL BE PERFORMED BUT EVEN THAT WILL REQUIRE SIGNIFICANT ANALYTICAL INTERPRETATION OF RESULTS.  PRELIMINARY ANALYSIS INDICATES THAT TRADITIONAL THIRD-ORDER EFFECTS COULD CAUSE THE TELESCOPE TO EXCEED ESTABLISHED PERFORMANCE REQUIREMENTS. THIS LEADS TO VERY LARGE DETAILED MODELS. PRIMARILY SINCE COMPOSITE TUBES ARE BEING MODELED USING SOLID ELEMENTS.  TO MINIMIZE DIFFERENCES BETWEEN THE CURRENT BASELINE AND THE MODEL THE PROJECT IS USING A NUMBER OF RAPID ANALYSIS CYCLES THE LARGE SIZE OF THE TELESCOPE MODELS AND THE SHORT CYCLE TIME CREATES A DEMANDING MULTI-DISCIPLINARY ANALYSIS ENVIRONMENT. Optical Performance Modeling of the James Webb Space Telescope - An Update - Science Requirements Measure the luminosities, morphologies, and environments of galaxies within the spectral band 0.6 – 10 µ m Measure the spectra of 2500 galaxies over the redshift range 1 < z < 5 5-year lifetime. Constraints Launch by 2014 Cost capped Significant International Contributions Spacecraft from Prime Contractor Key Mission Trades  Launch Vehicle  Filled vs. Partially-Filled Apertures  Thermal Management  Sky Coverage  Communications Strategy Science Instruments NIR Imaging Camera [NIRCam] – 8 square arc minutes field of view – Spectral resolution R (λ/Δλ) ≤ 100 – Wavelength range µm Multi-object spectrograph [ NIRSpec ] – Observing > 100 objects at once – 9 square arc minutes field of view – R ~1000 over λ from 1-5 µm – R ~100 over λ from µm MIR instrument [MIRI] – Imaging and spectroscopy – 2 square arcminutes field of view – R ~1500 spectroscopy over λ from 5-28 µm.  Major analyses of current baseline design are repeated during each cycle  On-orbit Thermal Distortion  Perform two cooldown analyses and take the difference of displacements  Compare results to budgeted wavefront error allotments  On-orbit Jitter  Calculate normal modes and modal damping based on strain energy  Apply reaction wheel and cryocooler disturbances in DOCS for optical performance calculation  Design cycles are approximately 3 months from model receipt to completion MATLAB & FEMAP NASTRAN & MATLAB JWST Telescope Architecture Sec. Mir. Support Structure PM Backplane ISIM Enclosure Aft Optics Subsystem (AOS) Fixed tertiary mirror Fine steering mirror PM baffle/radiator Secondary Mirror Assembly Primary Mirror Segments Light-weighted, 7DOF segments 18 modular units make up PM Supports 18 PMSAs, ISIM, IEC, Radiators, IOS, SMSS Torque Box BSF Deployment Tower ISIM Backplane SDR3 Hot-to-cold Slew Wavefront Error Current Thermal Distortion Model Size 3.8 million GRIDS 2.0 million solid elements 260 thousand plate elements Overview Gradients used heavily in STOP modeling Uncertainty modeling, identifying critical parameters and levying requirements Analytical gradients would improve process less susceptible to numerical conditioning if faster, enable larger parameter space Methodology Use discipline modeling tools to compute gradients to design parameters p chain rule applied to discipline models validate using finite differences FEMAPTSS SINDA MATLAB NASTRAN MATLAB geometry R C TsTs TnTn u optical performance z bulk data optical sensitivities Closeup of Backplane & Mirror Segment Models assembled by NGST from subassemblies created by various subcontractors GSFC Backplane  T Comparison Worst-Case Hot-to-Cold T2 T1 Structural Model Thermal Model Large Model requires careful memory management during mapping in Matlab Stick model thermal nodes run down the middle of the solid-element tube models T2 T1 Previously documented use of optical sensitivities to predict wavefront error in MATLAB from NASTRAN punch file inputs Added decomposition of wavefront error by source and budget category Will soon add Zernicke coefficient calculation Addition of field distortion upcoming Previously considered the errors in transmitting a point source through the system Now adding the changes in the shape of an extended body  A slight distortion in one axis is inherent in the design but will be removed in post-processing  The change in this calibrated distortion becomes very important for NirSpec as it observes the spectrum of many objects simultaneously through an array of micro-shutters: Too much distortion prevents observation of the correct science targets  We are tracking this distortion stability by keeping track of multiple field points and evaluating their relative separations after thermal/structural events, such as repointing the observatory so that the sun strikes at a different angle