Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/502661 NATURALHY is an.

Slides:



Advertisements
Similar presentations
(overview of the NATURALHY-project)
Advertisements

ME 240: Introduction to Engineering Materials Chapter 8. Failure 8.1 CHAPTER 8.
Fracture Mechanics Overview & Basics
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
REMOTE MEASUREMENT OF STRESS IN FERROMAGNETIC PIPELINES Motivation Ageing global pipeline infrastructure Non-invasive, remote, pipeline integrity assessment.
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
Presented by Robert Hurlston UNTF Conference 2011 Characterisation of the Effect of Residual Stress on Brittle Fracture in Pressure Vessel Steel.
Fatigue life assessment of structural component with a non-uniform stress distribution based on a probabilistic approach Aleksander KAROLCZUK. Thierry.
Training Manual Aug Probabilistic Design: Bringing FEA closer to REALITY! 2.5 Probabilistic Design Exploring randomness and scatter.
University of Texas at San Antonio Probabilistic Sensitivity Measures Wes Osborn Harry Millwater Department of Mechanical Engineering University of Texas.
Engineering Probability and Statistics - SE-205 -Chap 4 By S. O. Duffuaa.
NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and.
Using Rational Approximations for Evaluating the Reliability of Highly Reliable Systems Z. Koren, J. Rajagopal, C. M. Krishna, and I. Koren Dept. of Elect.
Lecture #19 Failure & Fracture
Unit 3: Solid mechanics An Introduction to Mechanical Engineering: Part Two Solid mechanics Learning summary By the end of this chapter you should have.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
The Lognormal Distribution MGT 4850 Spring 2008 University of Lethbridge.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated.
1 Fundamentals of Reliability Engineering and Applications Dr. E. A. Elsayed Department of Industrial and Systems Engineering Rutgers University
A new assessment method for masonry arch bridges (SMART) Clive Melbourne, Adrienn Tomor School of Computing, Science and Engineering, University of.
Copyright © 2014 reliability solutions all rights reserved Reliability Solutions Seminar Managing and Improving Reliability 2014 Agenda Martin Shaw – Reliability.
Fracture of Divertor Structures Jake Blanchard ARIES Meeting April 2011.
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
Sustainment Management Systems
Distribution of Defects in Wind Turbine Blades & Reliability Assessment of Blades Containing Defects Authors: Henrik Stensgaard Toft, Aalborg University.
Product Design and Qualification (Validation) Testing for HPHT Systems
ASPECTS OF MATERIALS FAILURE
46th SIAA Structures, Dynamics and Materials Conference Austin, TX, April 18-21, 2005 Application of the Generalized Conditional Expectation Method for.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
Orynyak I.V., Borodii M.V., Batura A.S. IPS NASU Pisarenko’ Institute for Problems of Strength, Kyiv, Ukraine National Academy of Sciences of Ukraine Pisarenko’
Probabilistic Mechanism Analysis. Outline Uncertainty in mechanisms Why consider uncertainty Basics of uncertainty Probabilistic mechanism analysis Examples.
Application of the Direct Optimized Probabilistic Calculation Martin Krejsa Department of Structural Mechanics Faculty of Civil Engineering VSB - Technical.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
1 6. Reliability computations Objectives Learn how to compute reliability of a component given the probability distributions on the stress,S, and the strength,
Application of SRA for Pipeline Design Operation & Maintenance Andrew Francis Advantica Technologies ASRANeT, 2 nd Annual Colloquium, 9 th July 2001.
Copyright © 2014 reliability solutions all rights reserved Reliability Solutions Seminar Managing and Improving Reliability 2015 Agenda Martin Shaw – Reliability.
Reliability analysis of statically indeterminate steel frame (pilot study) David Pustka VŠB – Technical University of Ostrava Faculty of Civil Engineering.
More Continuous Distributions
Bay Zoltán Foundation for Applied Reseach Institute for Logistics and Production Systems BAY-LOGI Integrity Assessment of Dissimilar Metal Welds BAY-LOGI.
FRACTURE MECHANICS AND FATIGUE DESIGN HANS MF PANJAITAN Marinteknisk Senter Otto Nielsens Veg Trondheim Norway Mobile:
Cyclic plasticity and low-cycle fatigue (1) Established within the GROWTH project GRD "Improvement of Service Life and Reliability of Cold.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95,
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Machine Design Under Uncertainty. Outline Uncertainty in mechanical components Why consider uncertainty Basics of uncertainty Uncertainty analysis for.
Structural and Failure Analysis Compiled by Shahram Sharafat for the TBM Conference Call Oct 27, 2005.
I. M. DMYTRAKH and V. V. PANASYUK Karpenko Physico-Mechanical Institute, National Academy of Sciences of Ukraine 5 Naukova Street, Lviv, 79601, UKRAINE.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
Examples of Current Research in “State Awareness” for Digital Models: ICME and NDE Links to Structural Analysis Michael Enright Craig McClung Southwest.
Probabilistic Design Systems (PDS) Chapter Seven.
Robust Design: The Future of Engineering Analysis in Design
NDE in Industry. Why do NDE? Integrity Management Safety – input into safety cases Life prediction – input to corrosion and fracture mechanics calculations.
Reducing Uncertainty in Fatigue Life Estimates Design, Analysis, and Simulation 1-77-Nastran A Probabilistic Approach To Modeling Fatigue.
University of Texas at San Antonio Harry Millwater and Brian Shook Dept. of Mechanical Engineering University of Texas at San Antonio Steve Hudak, Mike.
Probability of ship fracture John Kent Contents 1What is brittle fracture 2Material fracture toughness 3Calculation overview 4Results.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
William Prosser April 15, Introduction to Probability of Detection (POD) for Nondestructive Evaluation (NDE) This briefing is for status only and.
Quantification of the reliability of flaw detection (NDT) using probability of detection (POD) based on synthetic data - Validation of the ultrasonic.
CEA/DEN/DM2S/SEMT/LISN
Engineering Probability and Statistics - SE-205 -Chap 4
Turbo Power Life Prediction- Overview
Orynyak I.V., Borodii M.V., Batura A.S.
TIME TO FAILURE AND ITS PROBABILITY DISTRIBUTIONS
Updating the failure probability of miter
Determination of Fracture Toughness
Test criterion and sampling distribution of x with m= 0.38 second.
Definitions Cumulative time to failure (T): Mean life:
Presentation transcript:

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Predicting the Probability Of Failure of Gas Pipelines Including Inspection and Repair Procedures L.Zhang, R.Adey Computational Mechanics International San Sebastian

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Contents 1.Why Probability of Failure (POF) analysis 2.An introduction to the POF calculation method 3.Overview of POF calculation tool- PipeSafety developed for NATURALHY project 4.A sample problem 5.Summary

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Probability Of Failure  What is Probability of Failure?  A number which indicates the probability that a pipeline could fail within a given timeframe  Failure criterion: leakage including breakage (zero tolerance to gas/hydrogen leakage)  The Probability of Failure can be used to assess the impact on the safety of a pipeline of changes in the design and management and the type of gas carried by the pipeline  The POF also provides a link to economics type models

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD)  The POF can include the impact on the pipeline safety of:  The type of gas being carried and its impact on the materials or defects present in the pipeline  The operational loads on the pipeline  The inspection strategy and the performance of the inspection tools  The repair strategy  The quality of the pipeline e.g. The number and type of defects present Probability Of Failure

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Hydrogen  Hydrogen has been shown to change the behaviour of materials subject to low cycle fatigue loads  These changes are associated with plastic deformation of the material  Hydrogen is therefore expected to change the behaviour of sharp crack like defects  The POF calculation is therefore focused on crack-like defects

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Probability Of Failure  A probabilistic fracture mechanics approach has been used to determine the behaviour of crack like defects  There are three main ways of obtaining the POF  Analytical solution  First/Second Order Reliability Method (FORM)  Monte-Carlo simulation with/without variance reduction technique

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Calculation Method  The current failure criteria used in the model is based on BS7910 level 2 FAD  Other failure models could be added to the POF tool

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Calculation Method  Monte-Carlo simulation

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Calculation Method

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Calculation Method  All the inputs into the model can be expressed probabilistically  Defect distribution, material behaviour etc.  Common probability density functions  Lognormal distribution  Weibull distribution  Exponential distribution, normal distribution…etc.

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Calculation Method  The POF of a whole pipeline can be calculated as follows:

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Calculation Tool PipeSafety 1)Main page

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 2)Pipe geometry POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 3)Defect definitions POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 4)Loads definitions POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 5)Residual stresses POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 6)Material properties POF Calculation Tool PipeSafety Data is being obtained by experimental testing as part of the NATURALHY project

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 7)Inspection tool characteristics POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 8)Repair procedure POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) 9)Analysis and other options POF Calculation Tool PipeSafety

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Sample Application Basic input data

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Basic unit (mm,MPa) Cracks in Natural Gas Cracks in 100% hydrogen c 5.2e-132.4e-14 m 33.8 Fatigue crack growth data from TNO, Netherlands for natural gas and 100% hydrogen Sample Application

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) X52 Base Material In 100% Natural Gas  Repair criteria  Pre-inspected and then inspected at every 10 years  If a detected crack will lead to failure in 12 years it is repaired  A pipeline with 10 cracks/km  Fracture and fatigue properties  c=5.2e-13  m=3  K IC = MPa*mm 1/2  Result  Cumulative POF of a single defect (60 years): 3.0e-5  Total POF: 3.0e-4 per km

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Of A Defect Base Metal

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Of A Defect in welds

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Improve Inspection What happens if we improve the sensitivity of the inspection tool? New inspection tool Probability of Detection Curve

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) POF Of A Defect Base Metal Higher sensitivity of inspection tool reduces the POF

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Summary  Probability of Failure analysis enables the impact of hydrogen on the safety of pipelines to be assessed  The analysis does not only consider the impact of hydrogen on the micro mechanical behaviour of the materials but also the way the pipeline is managed  Inspection strategy  Repair strategy  Operational loads

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) Summary  It can be used as a sensitivity tool to assess management options and can link to more economic models  The initial crack size distribution is an important input parameter and further work is required to validate this and other data  Material properties such as crack growth threshold value, fatigue properties and toughness are key parameters

Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an Integrated Project funded by the European Commission’s Sixth Framework Programme ( ) for research, technological development and demonstration (RTD) The End Question time