1 60 Hertz Over Voltages For Arrester Applications For Arrester Applications.

Slides:



Advertisements
Similar presentations
Chapter 20 Electric Circuits.
Advertisements

 E4 Electrical Installation #1 Power Distribution.
ENERGY CONVERSION ONE (Course 25741)
Arrester Application bringing it all together!
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Today’s Topics 1- The per unit system 2-Transformer Voltage Regulation
EET Survey of Electronics
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Blondel Compliance. Update to IMO Wholesale Revenue Metering Standard V2.0 Section Considerations for non-Blondel Meter Installations a. 3 CT’s.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
UMKC Senior SUBSTATION DESIGN TEAM
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Coal Mine Connections Lessons from Experience. Why are we talking about Coal mine connections Because we had a situation where the customer wanted a service.
Concept Summary Batesville High School Physics. Circuit Schematics  A schematic diagram is a symbolic representation of a circuit.  A symbol represents.
Interconnect Protection of Dispersed Generators
Engineering Practice Electric Fitting Resistance Electrical resistance is the ratio of voltage drop across a resistor to current flow through the resistor.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
We ground the neutral of our Distribution capacitor banks- Why?
1 Automatic Load Transfer – The Perfect Phantom Voltage SWEDE Conference Corpus Christi, TX May 3, 2006 Kenton M. Brannan, P.E. CenterPoint Energy - Distribution.
Objectives Review electric circuits and electricity pricing - Introduce HW5 Select conductor and conduit List electrical devices.
Transient Overvoltages
Chapter 17.3 – Circuits electric circuit – a set of electrical components connected such that they provide one or more complete paths for the movement.
Grounds on Cap Banks. Why do we ground some cap banks and not others? We ground 12kV Cap We ground 12kV Cap We do not ground 23 and 25kV banks We do not.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Grounding, bonding, and ground fault currents
Parallel Circuits. Types of Circuits: Parallel A parallel circuit can be constructed by connecting light bulbs in such a manner that there are SEVERAL.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Chapter 17 Section 3 (pages )
What can a Non Load Break Switch do?. Interesting question A switch is used to isolate the circuit Can a switch close into an energized circuit, a circuit.
CLEMSON UNIVERSITY DG CONFERENCE UPDATE ON THE CURRENT STATUS OF DG INTERCONNECTION PROTECTION WHAT IEEE 1547 DOESN’T TELL YOU ABOUT INTERCONNECTION PROTECTION.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Resistance.
Medium Voltage Outdoor Apparatus Portfolio
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Grounding.
Submitted To:- Submitted By:- Mr.
Inductance The property of inductance might be described as "when any piece of wire is wound into a coil form it forms an inductance which is the property.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Protection of Power Systems
Circuits Chapter 17.3 Notes. What are circuits? An electric circuit is a set of electrical components connected such that they provide one or more complete.
Grounded Wye-Delta Transformer Bank Backfeed Short-Circuit Currents W. H. Kersting & Wayne Carr Milsoft Utility Solutions.
EE 2353 HIGH VOLTAGE ENGINEERING Faculty Name :A.JAIBUNISHA Faculty Code : EE 58 Designation : LECTURER Department : EEE.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
BASIC ELECTRICITY AND MAGNETISM
E4 Electrical Installation
Transient Response of an RC Circuit
Grounding.
Interconnect Protection of Dispersed Generators
Limiting Maximum Current of the Power Supply
Neutral current is zero
E4 Electrical Installation
The D.C. Scout Battery Distribution System Ground Locator
THREE-PHASE GROUND-FAULT BASICS
Design of Electric Power Systems and Utilities
Exercise 8 Power systems.
EET 323 – Electrical System Design Lecture 9: Grounding
Do Now Heading: Right Hand Rule
Objectives Learn about 3 Phase vs. 1 phase F&N vs. 1 phase F&F
Cutting in Bells Three Phase
Relocating a Three Phase Transformer Bank
Jeremy P. Carlo Department of Physics
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Isolation Link Operation
Presented by: HJ Arnett Industries, LLC
Relocating a Three Phase Transformer Bank
Presentation transcript:

1 60 Hertz Over Voltages For Arrester Applications For Arrester Applications

2 Applying Arresters When Applying Arresters you have to be concerned about 3 items When Applying Arresters you have to be concerned about 3 items 1. Maximum Continuous operating Voltage 2. Maximum 60 Hertz Overvoltage 3. Energy Absorption rating

3 What causes 60 Hertz overvoltages Faults Faults Load Rejection Load Rejection Ferro Resonance Ferro Resonance Charging current in a line Charging current in a line

4 Faults and Grounding A well grounded system will have very little Voltage Rise on the unfaulted phases during a fault A well grounded system will have very little Voltage Rise on the unfaulted phases during a fault As the system becomes less well grounded then the unfaulted phase voltage will rise until it hits the phase to phase value. As the system becomes less well grounded then the unfaulted phase voltage will rise until it hits the phase to phase value.

5 Neutral shifts during clearing of a phase to ground fault Arrester voltage 140kv 197kv 242kv

6 Calculation

7

8

9

10

11

12

13 Graphical Method

14 Two examples of 60 Hz overvoltages Coal mine grounding 84 Coal mine grounding 84 Coal Mine grounding Majorsville Coal Mine grounding Majorsville

15 Coal mine grounding 84 Here was the plan 1.47 mi LIVINGSTON PODISH 0.13 mi 0.90 mi 0.50 mi SUMMIT JCT mi ELLSWORTH CALVIN JCT mi 0.69 mi WEIR N.O. LITTLE A 25 kV ANDREWS SHAFT RICHARDSON 0.19 mi 4.71 mi kV 0.01 mi 3/0 AAAC /0 ACSR 4/0,1/0 4/0 CU,1/0 CU LONG FARM SHAFT 0.17 mi 3/0 ACSR 0.60 mi 3/0 ACSR 100 ft. 1/0 AL U LONG FARM BLEEDER SUBSTATION U 100 ft. 3/0 ACSR CONSTRUCT 100 FEET OF 1/0 AL, UNDERGROUND 25 kV LINE INSTALL A 25 kV AIR SWITCH AT TAP INSTALL A 1.5 MVA, kV PAD-MOUNTED TRANSFORMER PACKAGE WITH 4 kV METERING 1.5 MVA, kV PAD-MOUNT LFB LONG FARM BLEEDER TAP LFBT LSMJ-EPJ (400)

16 What Happened The transformer was energized with no load and the low side arrester failed. The high side fuse failed and launched upwards and stuck into the roof of the transformer. The transformer was energized with no load and the low side arrester failed. The high side fuse failed and launched upwards and stuck into the roof of the transformer.

17 Blown Arrester Neutral ungrounded 3 CT’s 2 VT’s High Side VT’s Grounded

18

19 The situation developed because 1.Planning not aware that coal mine wanted ungrounded service at They were told that this customer want 4160 service nothing was said about ungrounded service 2.Planning issued a plan for 4 wire service 3.Pad mount transformer was shipped with arresters installed, this is not what the T&D manual wants 4.3 element metering specified, but only 2 VT’s showed up 5.It was a rush job so a decision was made to use 2.5 element metering 6.When the transformer was ready to be energized, the Coal company inspector told our people to remove the ground 7.Our crew was confused and called their boss and he checked 8.The metering people said they would have to change the metering 9.Our crew was told to disconnect the metering, they did by opening the low side metering switches 10.They were instructed to remove the ground 11.They were told to go ahead and energize 12.Arrester failed causing a phase to phase fault and failed the high side transformer fuse

20 Metering opened

21 Why did it happen Here is the Schematic of how everything was hooked up when energized. Here is the Schematic of how everything was hooked up when energized. No Ground on Transformer High side on metering VT’s Grounded for 2.5 element metering

22 No Ground on Transformer High side on metering VT’s Grounded for 2.5 element metering This arrester saw a voltage of 1.5p.u. and failed, when it failed it blew stuff all over the place. This stuff caused a phase to phase fault in the transformer, also when the arrester failed, it would fail in the shorted mode, causing line to line voltage across the VT’s putting them into saturation, which would cause a high current to flow through them This transformer used Cooper fuses which was an old design as it did not provide positive latching, using the right hand rule the fuse could have been forced out of the holder and the expelled gas would have launch it upwards into the lid. As it would see maximum fault current at this point.

23 Coal Mine grounding Majorsville Arresters failed when bank was energized. Arresters failed when bank was energized. Resistive grounded Grounded Wye - Grounded Wye Transformer Bank to provide 120/208 service High Pressure Sodium Street Light

24 In Both Cases Grounding was not solid Arresters should have been rated for Phase to Phase Voltage instead of Phase to Ground Arresters should have been rated for Phase to Phase Voltage instead of Phase to Ground

25 Line Charging Current Long open line at 500kV or a piece of underground line Can be modeled as

26 It is a line with a lot of Capacitance Vs Vr jIX I Cap Vr Vs I jX

27 Ferro Resonance Pharaoh Residence- Is where the king of Egypt Sleeps Pharaoh Residence- Is where the king of Egypt Sleeps Actually it is to much to talk about today will do it latter if we have time Actually it is to much to talk about today will do it latter if we have time