Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke.

Slides:



Advertisements
Similar presentations
Loads and Load Paths "Architecture is inhabited sculpture."
Advertisements

Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Express Team University of New Mexico February 24, 2006.
Mountain Ridge Project - final presentation - AEC The making of Ridge University Engineering Building E ngineerMartha DelCampo, Stanford A rchitectKatrin.
Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
TeamMembers Architect: Angela Ribas UC Berkeley Engineer: Matthias Niebling Bauhaus-University Weimar, Germany Construction Manager: Kevin Coyne Stanford.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Floor Systems & Framing of Floors
University Health Building Thesis Final Presentation
CENTRAL UNIVERISTY ARCHITECTUREJoy Liu, Cal-Berkeley ENGINEERINGNorm Faris, Stanford CONSTRUCTIONTim Kolaya, Georgia Tech OWNERAlex Barron, Stanford Engineering.
2001 Winter Presentation. Site Location Site View.
Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC.
Reading Structural Drawings
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
R I V E R A rchitect Elena Paparizou Berkeley E ngineer Paul Kulseth Kansas C onst. Manager Wendy Wang Stanford O wner Jonathan Wong W i n t e.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Kitty Chan UC Berkeley architect Chad S. Green Stanford University Yuning Wang Stanford University engineer contractor owner Robert Alvarado Mission:
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
CESL Hotel Unique – Toronto Chris O’Brien Eric Fraser Scotia Mabury
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Final Presentation of Bay Engineer Yang, Yao-Hung ConstructionManager David Walthall Architect Cindy Chan.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
TeamMembers Team members of the Team members of the Angela Ribas
CONDOMINIUM TOWER & PARKING
Advisor: Professor M. Kevin Parfitt
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
PACIFIC TEAM SPRING QUARTER PRESENTATION
The Mountain Ridge Team
Mountain Ridge Project
Mississippi Riverbank Project (Final Presentation) May 14, 1999
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke BarrettOwner - DPR W a v e

Architect’s Vision Flexible building and workplaces Central areas for interaction Ocean view Context

ArchitectEngineerCM New Design 1 Undeveloped circulation High Tech Clear structural grid Possible difficulty casting slope slab Excavation required for Auditorium High cost of the exterior (glass) Possible savings by exposing slab New Design 2 Good organization, elegant, interesting for good detail Structure integrated with architecture No visual intrusion to architectural components High learning curve due to the symmetry of the structure No excavation required for auditorium W a v e Matrix

W a v e D Model

auditorium classroomslab seminar computerofficeslounge storageMEP elevator W a v e Floor 1

auditorium classroomslab seminar computerofficeslounge storageMEP elevator W a v e Floor 2

auditorium classroomslab seminar computerofficeslounge storageMEP elevator W a v e Floor 3

A” A B”B B A”A W a v e Section

Large classrooms: Sloped, 2 exits, 65 seats Auditorium: sloped, 5 exits, 197 seats All classrooms, LAB, Computer: ocean view All offices: daylight W a v e Building Performance

Design wind speed: V 33 = 80mph NBCC (National Building Code of Canada) Most severe case: North wind Wind parallel to corridor Design snow load: Uniformly distributed load 25psf W a v e Structural Requirements

Steel Moment resisting frame 3” 20GA full composite slab 12m girder, column/column span W a v e Final Structural Solution Beam : W18X35 Girder: W24X76 Column: W14X48

Foundation Design W a v e Spread footings :1.5m X 1.5m X 60cm Grade beams: 30 cm X 60cm

Architectural/Structural Integration Column!! No structure element intrusion in architectural space in 1 st and 2 nd floor One column intruded flexible offices are, but acceptable to architect W a v e

Architectural/Structural Integration ArchitectEngineer ElevatorCheck for beam & girder location and frame around slab opening Sloped slabDesign supporting structure for gravity load

Conventional Truss: Double angles Truss Spacing: 20’ oc Purlin Spacing: 5’oc EW, 7oc NS Simple connections to main structure W a v e Final Roof Design: Structure N

Sloping N-S direction Suction effect due to North wind at wing trusses—uplifting Compression on end trusses L 2X2 ½ X 5/16 L 2X2 ½ X 3/16 N WIND W a v e Roof Design: Truss Configuration WIND L 2X2 ½ X 3/16

N WIND W a v e Roof Design: Truss Configuration con’t L 2X2 ½ X 3/16 Sloping E-W direction Wind parallel to ridge suction effect Uplifting at connections

Purlin size: C 9X20 1 ½” steel deck Expanded perlite and fibers impregnated with integral asphalt waterproofing 2hr fire rating with 1” slab W a v e Roof Design: Truss Configuration con’t

Truss / Truss connectionDeck/channel/truss connection Truss member connectionTruss end connection W a v e Roof Connections

Girder to column connectionMoment connection Beam to column connectionColumn to footing connection Structure Connections W a v e

P-d effect included Story drift : 1.2 in Large horizontal shear force at truss/structure connection Structural Analysis: W a v e Truss element forces are verified by MASTAN Average element force ranging from 10 kips to 50 kips

Pro’sCons Minimum space intrusion Flexible future upgrades Simple structure Deep beams and girders limiting floor to ceiling height Conservative structural member sizes Pro’s and Cons W a v e

Budget: $5.5 Million in 2015 (4.6 Million PV) Time Constraints: 1 year (construction duration ) Computer Lab Occupied by May 30, 2016 Preserve Architecture Construction Objectives W a v e

Site Plan W a v e

Crane Dump Truck Excavator Material HandlerConcrete Pump Truck Construction Equipment W a v e

4D Simulation W a v e

Milestone 1 Foundation (week 5) Schedule - Milestones W a v e

Milestone 2 Set HVAC Equipment (week 18) Schedule - Milestones W a v e

Milestone 3 Exterior Closure (week 24) Schedule - Milestones W a v e

Milestone 4 Project Completion (week 31) Schedule - Milestones W a v e

Total Pre-construction Time: 8 months Total Construction Duration: 7 months Milestones: –Foundation (by June 30, 2015) –Exterior Closure (by November 30, 2015) –Project Completion (by January 15, 2016) Time savings achieved by: –Simple Foundation –Steel Structure –On time Enclosure Schedule Analysis W a v e

$611,176 $3,756,820 Construction Estimate W a v e

Cost Distribution W a v e

Where are the main costs? –Superstructure (Roof-Truss) –Larger Surface Area (2,736 sf) How did we save? –Simple Foundation –Avoided Mass Excavation (Bedrock) –Local Wood Facade Cost Analysis W a v e $3,756,820$3,590,600

Chiller 60 Tons Nominal Capacity Dimensions: Length = 9.5ft Width = 7.3ft Height = 6.5ft Weight = 2465/3010 lbs Equipment Specifications (1) W a v e

Air Handling Unit 120 Tons with 20,000 CFM airflow Dimensions: –Length = 12.4 ft –Width = 6 ft –Height = 8 ft( –Weight = 8,000 lbs Equipment Specifications (2) W a v e

MEP Layout W a v e Floor 1 Floor 2 Floor 3

A E C W a v e Team Process: Roof Design

Lessons Learned Explanation of concepts in other disciplines Good design requires interaction and collaboration Technology is only as good as the user W a v e

Thank You W a v e ACarel Weeber (TUDelft), Rutger Smook (TUDelft), Sevil Sariliydize (TUDelft), Dennis Scott (MBT), David Bendett (MBT), Bart Luiten (HBG), Bart van der Pot (HBG), Cor Notenboom (HBG) EGreg Luth (KLAA), Shilin Jiang (KLAA), Eduardo Miranda (Stanford) CEric Horn (Webcor Builders), Bob Tatum (Stanford) and Eduardo Miranda (Stanford)