Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)

Slides:



Advertisements
Similar presentations
Computer Room Provision in Atlas and R89 Graham Robinson.
Advertisements

Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Columbia University’s Advanced Concepts Data Center Pilot June 17, 2011.
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
The CDCE BNL HEPIX – LBL October 28, 2009 Tony Chan - BNL.
Cooling Product Positioning
AFCOM Facility Presentation Directlink Technologies Corp. April 8, 2011.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
1 PDC Site Update at HP-CAST NTIG 1st April 2008 by Peter Graham PDC Site Update at HP-CAST NTIG April 1st 2008 Linköping by Peter Graham
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
An Academic Data Center Build Out at the University of Michigan Paul Killey Tempe, AZ Feb
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
October 23rd, 2009 Visit of CMS Computing Management at CC-IN2P3.
Data Centre Power Trends UKNOF 4 – 19 th May 2006 Marcus Hopwood Internet Facilitators Ltd.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
University of Michigan, CSG, May 2006 UM/MITC Data Center.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
CC - IN2P3 Site Report Hepix Fall meeting 2009 – Berkeley
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
MISSION CRITICAL COLOCATION 360 Technology Center Solutions.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
Physical Infrastructure Issues In A Large Centre July 8 th 2003 CERN.ch.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Progress Energy Corporate Data Center Rob Robertson February 17, 2010 of North Carolina.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
HEPiX Fall 2014 Tony Wong (BNL) UPS Monitoring with Sensaphone: A cost-effective solution.
CEA DSM Irfu IRFU site report. CEA DSM Irfu HEPiX Fall 0927/10/ Computing centers used by IRFU people IRFU local computing IRFU GRIF sub site Windows.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Nikhef/(SARA) tier-1 data center infrastructure
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Asset Based Finance Case Studies 1. Scenario Company has decided to deploy a new software application (CRM, ERP, FINANCE, etc…) required to improve productivity,
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Power and Cooling at Texas Advanced Computing Center Tommy Minyard, Ph.D. Director of Advanced Computing Systems 42 nd HPC User Forum September 8, 2011.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
November 28, 2007 Dominique Boutigny – CC-IN2P3 CC-IN2P3 Update Status.
West Cambridge Data Centre Ian Tasker Information Services.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
CC-IN2P3: A High Performance Data Center for Research Dominique Boutigny February 2011 Toward a future cooperation with Israel.
The Genome Sequencing Center's Data Center Plans Gary Stiehr
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
Expansion Plans for the Brookhaven Computer Center HEPIX – St. Louis November 7, 2007 Tony Chan - BNL.
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
CERN Data Centre ‘Building 513 on the Meyrin Site’
SPS cryogenic proximity equipment and SM18 validation
Grunenwald Science and Technology Building
Windows 7 deployment at CERN
RIT Campus Wireless Project
News and computing activities at CC-IN2P3
Maintenance at ALBA facility: Strategy for the conventional services
Presentation transcript:

Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)

Preamble Really involved people could not come to Hepix so, this is a general report Thanks for explanation and slides to Dominique Boutigny (CC-Director) Pascal Trouvé (Facility Management Team) Summary : Improvements of the current computing room Status of the new computing room Second phase of the first project 2 Hepix Fall Meeting - Ithaca - November 4th 2010

Last improvements of the computing room Second electrical low voltage master distribution panel (Tgbt) (one for Operation[racks and water cooling], one for infrastructure) New transformers have been installed: 3 * 1 MVA (No power distribution problem this last summer) diesel generator (1.1 MVA) Cooling : –A third cooling unit (600 kW) has been installed, so 1800 kW now –But we have no redundancy (need 1600 kW) –Fan system Improvements (aero on the roof) –Maximum cooling capacity allowed by the environmental regulation 3 Hepix Fall Meeting - Ithaca - November 4th 2010

Confinement and Water cooled racks 4  confinement Autonomous racks All the new hardware is installed in this kind of confined racks, including disks Hepix Fall Meeting - Ithaca - November 4th 2010

A careful hardware selection Hepix Fall Meeting - Ithaca - November 4th 2010 IBM iDataplex Intel 5430 LV – 2.66 GHz – 50 W 16 GB IBM iDataplex Intel 5430 LV – 2.66 GHz – 50 W 16 GB DELL 1U 1950b 3 GHz 16 GB DELL 1U 1950b 3 GHz 16 GB Blades DELL E5540 (2.53 Ghz) 48 GB Blades DELL E5540 (2.53 Ghz) 48 GB Dell C6100 X5650 – 2.66 GHz 72 GB Dell C6100 X5650 – 2.66 GHz 72 GB

New computing room  2 levels of 850 Sq. Meters levels [ machine room and technical rooms below]  First years, room dedicated to worker nodes only  We adopted a simplified “Design and build procedure” (single company contracted) allowing to deliver the building in 18 months after the first design  Due to budget constraints the new computer room will have to start with a limited power, but it has a modular design, so it is easily scalable  Chilled water and electricity distribution is designed for the 2019 target value but equipment (transformers, chillers, UPS etc…) will be added when required, to meet our future needs 6 As simple as possible : A computing room. Not an office space ! Hepix Fall Meeting - Ithaca - November 4th 2010

Evolution plan As an extend of the existing computer room (3 MW) indicated power is for computing only: power for cooling has to be added End up with: racks 600 kW racks 600 kW racks 1.5 MW racks 1.5 MW racks 3.2 MW racks 3.2 MW Hepix Fall Meeting - Ithaca - November 4th 2010

Design consideration 8 After several visits to existing computer room we decided to give up with the raised floor All the pipes and services are routed from the ceiling Hepix Fall Meeting - Ithaca - November 4th 2010

Electrical redundancy 9 In the first phase the electrical redundancy will be minimal We explore the possibility to introduce redundancy at the level of the electricity provider Would allow us to get rid of the diesel generator It requires a higher investment in order to get a double dedicated connection to the power supplier source (EDF) No more full outage Final decision to be taken soon Hepix Fall Meeting - Ithaca - November 4th 2010 S-G MW ,7 / 6 MW

The selected project Hepix Fall Meeting - Ithaca - November 4th 2010

11 Chillers on the roof Pumps Inverted beams Connection between old and new computer room + elevator Hepix Fall Meeting - Ithaca - November 4th 2010

Ceiling, without any visible beam Hepix Fall Meeting - Ithaca - November 4th 2010

Status Building work started on end of April 2010 Now : construction of the building is done starting equipment installation Delivery date planned February 1st 2011 First use in production ~ March 15th Hepix Fall Meeting - Ithaca - November 4th 2010

Second phase of the project Hepix Fall Meeting - Ithaca - November 4th Amphitheatre accessible to the public Multimedia center Outreach center Training center Meeting point between fundamental research, University and public An office space was part of the original extension project but dropped due to budget limitation Re-launch this project with new functionalities added Very well perceived by the Region and the city community (Grand Lyon)