Assignment 2 General arrangement 3.10.2014 Ran Xiao, 467643 Tomas Their, 224051 Kul-24.4110, Ship Project A.

Slides:



Advertisements
Similar presentations
Cal/OSHA Consultation Service On-Site Visits
Advertisements

Lesson 2.3 Food Safety Begins on the Farm Definitions and template for: Assignment 2.3.
Safety and Health Management Program
CLIFF HOUSE Muskoka Lakes, Ontario By Altius Architecture, Inc. Set on a rock formation overlooking a spectacular lake, the Cliff House seeks to enhance.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech Office of.
Individual Assignment A 1.Create a simple Kitchen floor layout (indicate equipment by use of power point or draw by hand) 2. Make a legend and summary.
Big Green eMachine concept pictures on
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Control + Comfort Josh Bors Ben Luke Daniel Grabowski Solar Powered Automobile Air- Conditioning Unit.
BY: ASHLEY WILLIAMS Jeep Compass. Overview 2010 Jeep Compass  starts at $15, 365 Four wheel drive Seats five comfortably Built in GPS Plenty of storage.
7 Set of Floor Plans Primary Considerations
Job Application Job Advertisements All Rights by James Worden (Merchant Marine Training Centre 2014)
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Fire prevention. All fires need fuel, air, and heat to spread 1a.
…A look into my visual thinking changed by technology…
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
How do you simplify? Simple Complicated.
General Arrangement Plan
Case Study: The Chapman Graduate School of Business Nicole Figueroa/ Kamilah Bermudez Acoustics Assignment #3.
Environment & Sustainability
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
Solar Car Design “Any intelligent fool can make things bigger and more complex... It takes a touch of genius - and a lot of courage to move in the opposite.
Our concept was that we could effectively make a solar powered light that attaches to a hard hat and will provide a worker with adequate light when working.
The design process This is a series of stages that you follow throughout your D&T projects. You need to know the stages and understand what they are, it.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
How our homes Conserve Resources Carson Group Q.
“High Five” Martha Dosidi Greece Gerda Berneckaite Lithuania
8 th Grade STEM Agenda Week 8 10/14 – 10/18. 8 th Grade Agenda 10/14 Learning Target: ▫I can accurately create and build a wall. ▫I can find facts during.
Lesson Five Bulkheads and Pillars.
Assignment 3 Hull structure Ran Xiao, Tomas Their, Kul
Zero emission commuter ferry Kul , Ship Project A Tomas Their (224051), Ran Xiao (467643)
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Miranda Graham
GETTING TO KNOW ME We are always in our own company. -Friederich Nietzche CDE 10 September 3, 2010.
Introduction about Machine Design I
BIOLOGICAL DRAWINGS.
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
Role of the Fire Service During Shipboard Fires. The Unified Command System.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech Office of.
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Part II Lecture 11B.
Orthographic Projection
A brief introduction to the parts of a modern theater.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Computer Aided Draughting (CAD) for Engineers SQA Unit No. F5H4 11.
Health & Safety in the Construction Industry
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
ENERGY TRANSFORMATIONS LAB Craig, Zach, Johnathan Period 4.
Cargo Container Homes All you need is around $2000 to begin building one of these epic homes – made from recycled shipping containers! Check out some of.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Learning Engagement tool (LET)
How is Used on Earth ?.
Process Layout Chapter #6.
Aeronautical Facilities
Interior Design Floor Plans And Elevations.
Circuits – how we get electricity to do work!
“THE BOBCAT DEN” Tiny House ARI Grant
Solar And Biodiesel Energy
Wood Structures Topic 8 Quality Workmanship
Solar Car Design “Any intelligent fool can make things bigger and more complex... It takes a touch of genius - and a lot of courage to move in the opposite.
Rough Draft 1 CONTENT.
House Construction Budget Plan
Firefighting equipment
Natural Sciences and Technology Grade 6
Orthographic Projection
Door and Window Schedules
BIM for Design Collaboration
Orthographic Projection
Prototypes Prototypes are made to see if a product works before it goes into large scale production. Many things will be tested such as function, safety,
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

Assignment 2 General arrangement Ran Xiao, Tomas Their, Kul , Ship Project A

Gaps from concept Simple general arrangement 5 areas Good details?

Gaps – Hulls Requires most work Enough space for all machinery parts? Consider moving batteries somewhere else

Gaps – Platform Close to finished Cargo (passenger) handling done Consider safety questions, e.g. Life jacket storage Evacuation possibility Heating?

Gaps – Bridge Basically OK Needs drawing Space for all the equipment? Space on the roof for necessary equipment? How should the storage area be used?

Gaps – roof Will house things like Solar panels A/C system Ensure enough head space after uotfitting Where can the door engines be placed?

Work plan Ran Hulls, roof Main problem is to work with the space in the hulls Tomas Bridge, platform, drawings Do a specific drawing for the bridge, and good looking drawings for the rest of the ship DL for both: 4.10 Gives time for compilation and fine tuning

Expectations and thoughts The basis from the concept is good The overall design is simple (small ship) We can look a little deeper into each part Possible problems may come from spatial problems All in all this shouldn’t be the most complicated assignment for us