North Main Street Improvements BID Meeting Wednesday, October 29, 2008.

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Downtown Revitalization Along Lafayette and Diamond Bridge Avenues Borough of Hawthorne October 15, 2014 Borough Engineer: Stephen T. Boswell, Ph.D., P.E.,
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
Washington Avenue Reconstruction Project City of Chelsea Public Informational Meeting May 31, 2011.
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
TH 100 Visual Quality Advisory Process VQAC Meeting One 6 December 2012.
Contact: Beth Morris
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 2 5/24/20151 This portion.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
Mission Statement To develop a vision of how we, the citizens of Folly, want Center Street to be transformed into the “Gateway to our city.” Then deliver.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Community Legacy Grant Chesapeake City Streetscape Improvements.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Rantoul Street / 1A Reconstruction Project December 10, 2015.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
2 INTRODUCTION Town of North Andover Bruce Thibodeau, P.E. – Director of Public Works Curt Bellavance, AICP – Director of Community Development – Director.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Bremer Avenue Rebuild Streetscape Concept Proposal
Hesperian Boulevard Corridor Improvement Project San Lorenzo
Ashland Redevelopment Authority
Marina Vista Streetscape Project
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
Public Information Meeting NW 100th Street Reconstruction Project
IA 122 RECONSTRUCTION PRE-BID MEETING
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Motor Row Streetscapes
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Meadow Lake Boulevard Street Extension Project
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Fordham at Columbia as a Grade-Separated Intersection
Streetscape Water Street Gateway A Centretown Concept.
Fort Walton Beach Landing Master Plan
Streetscape Water Street Gateway A Centretown Concept.
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

North Main Street Improvements BID Meeting Wednesday, October 29, 2008

Project Team Introductions WisDOT –Bill Bertrand, P.E. – Project Manager –Jill Michaelson, P.E. – Project Supervisor City of Oshkosh, Dept. of Public Works –David Patek, P.E. – Director –Steve Gohde, P.E. – Assistant Director MSA Professional Services – Design Consultants –Mike Statz, P.E. – Project Manager –Jason DiPiazza, P.E. – Project Engineer Ken Saiki Design – Landscape Architects –Shane Bernau –Ken Saiki, A.S.L.A. Heritage Research – Historical Consultants

Meeting Agenda Presentation –Project overview Schedule Scope –Project details Geometry Staging Streetscape Open House –Displays Aerial photos Project plan View Typical sections Streetscape elements –Questions and answers With project staff

Project Overview - Schedule Public information meeting #2: November 13, 2008 –(60% Design Phase) Submit Final Plans: April, 2009 Construction: 2010 –Full construction season (Spring through Fall)

Project Overview Scope Produce construction plans from the LDR Concept Plan

Project Overview - Scope Replace the aging infrastructure –Pavement –Curb and gutter –Sidewalk –Utilities Sewer, water etc. –Streetscape Lights, amenities etc. Add safety enhancements –Bump outs etc.

Project Details – Limits Fox River Bridge to Irving Avenue Cross streets –Reconstructed to N. Main Street Right-of-Way (typical)

Project Details - Geometry Ceape Avenue 2 southbound lanes 1 northbound lane Otter Avenue 2 southbound lanes (south of Otter) 1 northbound lane

Project Details - Geometry Algoma Boulevard 2 travel lanes 2 parking lanes 400 Block Bump outs Parking lanes

Project Details - Geometry Typical section –Wider sidewalks and terraces –More room for: Pedestrians Trees Street lights Amenities Merchants

Project Details - Staging N. Main Street closed during construction Access –Parking lots behind buildings –Pedestrian access to building fronts Cross street traffic –Maintained for some intersections – staged Regular construction progress meetings –Keep businesses informed

Project Details - Streetscape

Project Details – Streetscape Street trees strategically located in front of building corners, blank walls, and parking lots. Tree grates are used along Main St. with exception of bump out areas Tree layout carefully considers underground utilities, façade signage, signal poles, & light pole layout.

Project Details - Streetscape Streetscape incorporates design cues from Opera House Square (LDR plan). Features include half-circle tree pits, brick banding, trash receptacles, bike racks, and benches. Modified street tree planter detail reduces snow plow damage by replacing the raised concrete edge w/ a flush edge. MAIN ST. FLUSH CONCRETE EDGE

Thank You