Some questions: In which order cables will be put ? Who, where will put PS signal cables in bundles ? Which kind of cable binders: velcro or panduit or ? When we will put labels and stickers (before or after cables in place?) Who, where will cut and put connectors on cables ? PS: HV (28x4x2), LV (100x2), Temp (32x2), LV in (200x2) SPD : HV (28x4x2), LV (32x2), LV in (100x2) before or after cables in place (or mixed …) When we will put labels and stickers (before or after cables in place?) Cables between boxes will be put at the end (with electronics) ? How to maintain in place cables during installation: up to electronics installation, after … How to check cable connections (connector and electronics levels) ?