NCPHEP ATLAS/CMS Tier3: status update V.Mossolov, S.Yanush, Dz.Yermak National Centre of Particle and High Energy Physics of Belarusian State University.

Slides:



Advertisements
Similar presentations
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
Advertisements

National Grid's Contribution to LHCb IFIN-HH Serban Constantinescu, Ciubancan Mihai, Teodor Ivanoaica.
Florida Tech Grid Cluster P. Ford 2 * X. Fave 1 * M. Hohlmann 1 High Energy Physics Group 1 Department of Physics and Space Sciences 2 Department of Electrical.
GridKa SC4 Tier2 Workshop – Sep , Warsaw Tier2 Site Adam Padee ( ) Ryszard Gokieli ( ) Krzysztof.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
Oxford Site Update HEPiX Sean Brisbane Tier 3 Linux System Administrator March 2015.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
IFIN-HH LHCB GRID Activities Eduard Pauna Radu Stoica.
Site Report US CMS T2 Workshop Samir Cury on behalf of T2_BR_UERJ Team.
Bondyakov A.S. Institute of Physics of ANAS, Azerbaijan JINR, Dubna.
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
SouthGrid Status Pete Gronbech: 4 th September 2008 GridPP 21 Swansea.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
Distributed Computing for CEPC YAN Tian On Behalf of Distributed Computing Group, CC, IHEP for 4 th CEPC Collaboration Meeting, Sep ,
Computing/Tier 3 Status at Panjab S. Gautam, V. Bhatnagar India-CMS Meeting, Sept 27-28, 2007 Delhi University, Delhi Centre of Advanced Study in Physics,
UCL Site Report Ben Waugh HepSysMan, 22 May 2007.
A. Mohapatra, HEPiX 2013 Ann Arbor1 UW Madison CMS T2 site report D. Bradley, T. Sarangi, S. Dasu, A. Mohapatra HEP Computing Group Outline  Infrastructure.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Ali Zahir Site Admin / Faculty Member ALICE T1/2 March.
Zhiling Chen (IPP-ETHZ) Doktorandenseminar June, 4 th, 2009.
Tier 1 in Dubna for CMS: plans and prospects Korenkov Vladimir LIT, JINR AIS-GRID School 2013, April 25.
Status of T3 GRID site infrastructure in Egypt Ashraf Mohamed Kasem Department of physics Ain Shams University.
Preparation of KIPT (Kharkov) computing facilities for CMS data analysis L. Levchuk Kharkov Institute of Physics and Technology (KIPT), Kharkov, Ukraine.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
YAN, Tian On behalf of distributed computing group Institute of High Energy Physics (IHEP), CAS, China CHEP-2015, Apr th, OIST, Okinawa.
SouthGrid Status Pete Gronbech: 2 nd April 2009 GridPP22 UCL.
GridKa SC4 Tier2 Workshop – Sep , Warsaw Tier2 Site.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN RAL 30 th June 2009.
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
Lucien Boland and Sean Crosby Research Computing.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Support in setting up a non-grid Atlas Tier 3 Doug Benjamin Duke University.
São Paulo Regional Analysis Center SPRACE Status Report 22/Aug/2006 SPRACE Status Report 22/Aug/2006.
Site Report BEIJING-LCG2 Wenjing Wu (IHEP) 2010/11/21.
UKI-SouthGrid Update Hepix Pete Gronbech SouthGrid Technical Coordinator April 2012.
UMD TIER-3 EXPERIENCES Malina Kirn October 23, 2008 UMD T3 experiences 1.
Architecture and ATLAS Western Tier 2 Wei Yang ATLAS Western Tier 2 User Forum meeting SLAC April
SL6 Status at Oxford. Status  SL6 EMI-3 CREAMCE  SL6 EMI3 WN and gLExec  Small test cluster with three WN’s  Configured using Puppet and Cobbler 
Company LOGO “ALEXANDRU IOAN CUZA” UNIVERSITY OF IAŞI” Digital Communications Department Status of RO-16-UAIC Grid site in 2013 System manager: Pînzaru.
Distributed Computing for CEPC YAN Tian On Behalf of Distributed Computing Group, CC, IHEP for 4 th CEPC Collaboration Meeting, Sep , 2014 Draft.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Dr. Saif-ur-Rehman Muhammad Waqar Asia Tier Center Forum.
V.Gavrilov 1, I.Golutvin 2, V.Ilyin 3, O.Kodolova 3, V.Korenkov 2, E.Tikhonenko 2, S.Shmatov 2,V.Zhiltsov 2 1- Institute of Theoretical and Experimental.
BEIJING-LCG2 Site Report Dec Beijing Job Number4,786,574 5,555,0442,354,501 Walltime4,869,401 6,783,6964,079,095.
Grid DESY Andreas Gellrich DESY EGEE ROC DECH Meeting FZ Karlsruhe, 22./
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Tier 3 Status at Panjab V. Bhatnagar, S. Gautam India-CMS Meeting, July 20-21, 2007 BARC, Mumbai Centre of Advanced Study in Physics, Panjab University,
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN – RAL 10 th June 2010.
Lofar Information System on GRID A.N.Belikov. Lofar Long Term Archive Prototypes: EGEE Astro-WISE Requirements to data storage Tiers Astro-WISE adaptation.
Florida Tier2 Site Report USCMS Tier2 Workshop Livingston, LA March 3, 2009 Presented by Yu Fu for the University of Florida Tier2 Team (Paul Avery, Bourilkov.
Final Implementation of a High Performance Computing Cluster at Florida Tech P. FORD, X. FAVE, K. GNANVO, R. HOCH, M. HOHLMANN, D. MITRA Physics and Space.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
Current Status Work Package Three By: Mohamed Elshamy.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
A. Mohapatra, T. Sarangi, HEPiX-Lincoln, NE1 University of Wisconsin-Madison CMS Tier-2 Site Report D. Bradley, S. Dasu, A. Mohapatra, T. Sarangi, C. Vuosalo.
TCD Site Report Stuart Kenny*, Stephen Childs, Brian Coghlan, Geoff Quigley.
Western Tier 2 Site at SLAC Wei Yang US ATLAS Tier 2 Workshop Harvard University August 17-18, 2006.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
Claudio Grandi INFN Bologna Virtual Pools for Interactive Analysis and Software Development through an Integrated Cloud Environment Claudio Grandi (INFN.
INFN/IGI contributions Federated Clouds Task Force F2F meeting November 24, 2011, Amsterdam.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
Status of BESIII Distributed Computing
SuperB – INFN-Bari Giacinto DONVITO.
Belle II Physics Analysis Center at TIFR
Cluster / Grid Status Update
UK GridPP Tier-1/A Centre at CLRC
Computing Board Report CHIPP Plenary Meeting
Overview of IPB responsibilities in EGEE-III SA1
Presentation transcript:

NCPHEP ATLAS/CMS Tier3: status update V.Mossolov, S.Yanush, Dz.Yermak National Centre of Particle and High Energy Physics of Belarusian State University Minsk, Belarus NEC 2013

Milestones and updates 2008 Site registered in GocDB as BY-NCPHEP 2009 Site certified by ROC Russia 2011 Site registered in CMS SiteDB as T3_BY_NCPHEP 2013 SE moved to Supermicro rack mount size server PheDEX service started GRID site size Site set-up: 1 FTE Site support: 0.5 FTE, 2 admins Jobs: remote CMS user MC, local user ATLAS/CMS MC/analysis

Site configuration: hardware 12 hosts 42 (+8) cores, 2 GB RAM/core LAN: 1 Gbps Internet: 40 Mbps Storage: RAID6 20 TB

Site configuration: software OS: Scientific Linux 5.9 & 6.3 x86_64 Autoconfiguration PXE, CFEngine 2, 3 User accounts management: OpenLDAP Shared FS: Lustre Monitoring: Ganglia, Nagios, Dashboard Middleware: EMI-2

Site services Cream CE + Torque/Maui StoRM shared FS UI, direct job submission Squid/Frontier CVMFS CMS Phedex

Ganglia view

CMS dashboard view

CMS dashoard view

PhEDEx agents

Plans (2014) 100+ Mbit/sec channel ATLAS Tier3 registration CMS PhEDEx LoadTest CMS.JobRobot test Low-priority MC production