Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.

Slides:



Advertisements
Similar presentations
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Advertisements

On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
PPIB and ODMB Status Report Rice University April 19, 2013.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
SLHC Meeting CERN, 21 May 2008 Presented by C.-E. Wulz Global Triggers,  TCA Technology M. Stettler, M. Hansen (CERN) C. Foudas, G. Iles (Imperial College)
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Global Trigger Upgrades for SLHC
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
T1 Electronic status Conclusions Electronics Cards:
HCAL Data Concentrator Production Status
ECAL OD Electronic Workshop 7-8/04/2005
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Global Trigger and Global Muon Trigger
Global Trigger and Global Muon Trigger Latency
FED Design and EMU-to-DAQ Test
Presentation transcript:

Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss, A. Taurok, C.-E. Wulz Vienna Group presented by Claudia-Elisabeth Wulz Trigger Meeting, CMS Week, CERN, 16 March 2004

Trigger Meeting, March 2004 C. - E. Wulz2 Global Trigger Rack

Trigger Meeting, March 2004 C. - E. Wulz3 All boards on front side. Boards arranged for minimum cable length. Global Trigger Crate

Trigger Meeting, March 2004 C. - E. Wulz4 PSB-9U Input Board One PSB board is reserved for technical triggers. The preferred solution for input of technical triggers is via Ethernet connectors, with 4 LVDS signals per connector. Agreement with subsystems wanted !

Trigger Meeting, March 2004 C. - E. Wulz5 Global Trigger Prototypes PSB GTL6U GTL_CONV VME interface Prototype GT CrateGTL6U + GTL_CONV

Trigger Meeting, March 2004 C. - E. Wulz6 TTCrx CLOCK circuits LVDS drivers CLK, BCRES, L1A, RESET to each VME slot VME TIM- Chip Front Panel NEW: This board is tested. 2 modules are finished, and components are being put on the 3rd one. A new version compatible with the QPLL-TTCrx (TTCrq) is under development and expected in Feb Same functions as old version, but will have new driver chips for clock signals on front panel. Both versions can be used by GT and DTTF. TIM6U Timing Module

Trigger Meeting, March 2004 C. - E. Wulz7 NEW: The FDL9U is in the process of layout. The board is expected in June FDL9U Final Decision Logic

Trigger Meeting, March 2004 C. - E. Wulz8 TCS-9U Central Trigger Control Board NEW: The TCS-9U board is available and components are being mounted. The end of tests is expected in May The VME interface works, the base address can be set by software.

Trigger Meeting, March 2004 C. - E. Wulz9 40, 80 MHz CLK drivers DS92LV16 receivers Registers for 40  80 MHz conversion Infiniband connectors DS92LV16 transmitter for tests PSB_IN80 for PSB-6U

Trigger Meeting, March 2004 C. - E. Wulz10 CONV6U NEW: CONV6U boards, needed by the TCS9U board to receive the fast status signals, have been produced and will be soldered shortly. Board contains only I/O chips and no VME interface

Trigger Meeting, March 2004 C. - E. Wulz11 bottom side top side 50 Ohm connectors XC2V2000-4FF896C BGA: 1mm pitch, track width=83  m Mezzanine Boards MEZZ896 will be used in TCS-9U and GMT. NEW: For MEZZ957 (for XCV3000 to be used in TCS-9U, GMT, GTFE, FDL9U) layout is finished. Final checks before production, boards expected in June 2004.

Trigger Meeting, March 2004 C. - E. Wulz12 LA1OUT Boards NEW: L1AOUT output boards are in production and expected by April 2004.

Trigger Meeting, March 2004 C. - E. Wulz13 Custom Backplane for VME crate 4 6U Prototype: Channel Links... exists MS 03/02 49U Backplane: 80MHz GTLp and Channel Links... New: board tested MS 09/03 PSB Input board (synchronisation, monitoring) 4 PSB 6U Prototype: Channel Link receivers... board tested MS 03/02 4 PSB-IN80: DS92LV16 serial receivers... board tested –PSB 9U: memories inside FPGAs… New: working on FPGA logic MS 08/04 (updated) GTL Logic board: 4 GTL_CONV Conversion board for prototype... board tested MS 03/02 4GTL6U prototype: 20 channels … New: board tested MS 06/03 Signal transfer tested with test patterns -> ok… working on firmware XDAQ compatible test program in C++ exists Loading of conditions software developed –GTL9U board: 32 channels...conceptual design MS 11/04 4 , 4 isol. e/ , 4e/ , 4 central jets, 4 fwd jets, 4  -jets,  E T, E T mis, H T, 12 jet counts Global Trigger Status and Milestones March 2004 Boards

Trigger Meeting, March 2004 C. - E. Wulz14 4 TIM6U Timing board with TTCrx... 2 boards tested MS 06/03 (clock and L1A distribution, this version can be used by GT and DTTF) TIM6U Timing board with TTCqx... in progress MS 02/05 (new) (also used by DTTF) MEZZ896 (used on TCS9U, GMT)... boards available MS 04/04 (updated) MEZZ957 (used on TCS9U, GMT,FDL9U, GTFE)... layout MS 04/04 (new) FDL9U Final Decision board... layout MS 06/04 (updated) TCS9U Central Trigger Control board... board produced, testing MS 05/04 (updated) L1AOUT Module (needed by TCS9U)... boards in production MS 04/04 (new) CONV6U Status signals reception (needed by TCS9U)... board produced MS 05/04 (new) TTIN Input module for technical triggers… hopefully not needed! GTFE9U Readout board... conceptual design MS 10/04 (updated) 4 Integration test with GCT MS 06/03 Test of 20-channel GT system MS 06/04 Integration with GMT MS 01/05 Test of full GT system MS 06/05 Integration of GMT with DT, CSC, RPC MS 06/05 Start of integration with DAQ MS 01/06 Global Trigger Status and Milestones March 2004 System and Integration

Trigger Meeting, March 2004 C. - E. Wulz15 Review in Vienna and URL’s A review of the Global Trigger (and the DTTF and GMT) will be performed on 19 April Information is available and can be accessed from a special web site: The normal web site for the Global Trigger is: This talk may be found at: wulz_GT_mar2004.pdf