Itzhak Tserruya, BNL, Aug. 11, 20041 Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

Benji Lewis APS April Meeting Hadron Blind Detector implementation during PHENIX Run-10 Benji Lewis On behalf of the PHENIX Collaboration.
CMS GEM Workshop III, April 20, 2012
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 AGENDA: HBD NIM paper#2 Itzhak HBD HV system HBD monitoring Acceptance and total number of channels Proposal status Large GEM tests Lev Monte Carlo Ilia.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Chevron / Zigzag Pad Designs for Gas Trackers
RAD hardening Half of dual HV supply or quarter of quad HV supply w breakout Output connector Input connector Ion Pump: RAD area Standard cable RAD-hard.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Itzhak Tserruya IEEE 2007, October 29, 2007, Hawaii Itzhak Tserruya Weizmann Institute of Science, Rehovot, Israel for the HBD group: for the HBD group:
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
Pads Assembly- Zamiatin Si Detector – ELMA/Dubna/MSU Interface Board – dubna/baskagiv Carrier Board -dubna/baskagiv Pre-Amp –sleniov(analog) Basilev-dubna.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
MUCH - related activity at PNPI A.Khanzadeev, for PNPI team ● R&D on muon chamber for MUCH central part ● Test of the materials for chamber modules ● Preparations.
CLAS12 Drift Chamber Prototyping
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
HBD Gas System and Monitoring Craig Woody BNL HBD Working Group Meeting December 8, 2004.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Beam test of GEM-TPC, HBD and PWO CNS-Tokyo : H.Hamagaki, K.Ozawa, M.Inuzuka, T.Sakaguchi, S.Kametani, F.Kajihara, T.Gunji, T.Isobe, N.Kurihara, S.Oda,
GEM Integrated PCB readout and cooling
Calorimeter Mu2e Development electronics Front-end Review
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
GEM-based Digital Hadron Calorimetry for SiD
GEM-based Digital Hadron Calorimetry for SiD
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Cheng-Yi Chi Nevis Lab Physics Dept Columbia University
Presentation transcript:

Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration

Itzhak Tserruya, BNL, Aug. 11, Detector location and size Location: around the beam pipe, occupy space from r=5 cm to r=61 cm. Acceptance (active area larger than central arm acceptance): - in z direction |η| ≤ 0.4 : z = 45cm - in φ direction Δφ = 100 o at r = 55 cm: s = 96 cm Segmentation: - along the beam axis: 2 pieces - along the azimuthal axis: 4 pieces Total: 16 detector elements 23 x 26 cm 2 each

Itzhak Tserruya, BNL, Aug. 11, d view

Itzhak Tserruya, BNL, Aug. 11, Half a Detector Z: mm X: mm Y: mm

Itzhak Tserruya, BNL, Aug. 11, Gas, HV and LV Stainless steel pipes for CF 4 : gas in 1/2”, gas out 1”. + N 2 line. The HBD has a total of 112 SHV HV connectors:  Each ½ detector has 56 SHV HV connectors (28 on the bottom and 28 on the top).  i.e. 7HV per sector. These are supplied by two power supplies through resistive chain.  total of 32 HV cables from the HV rack to the detector. LV (not yet specified)

6 Readout Board + Preamps Hybrid Preamps with line drivers ~ ¾” honeycomb Read pads ~ 3x3 cm 2 Preamp signals to shaper + ADC wires GEMs Being developed by BNL Instrumentation Based on IO-535 ± input signal ± 2.5 V output From C. Woody DC meeting Need almost one full rack for the readout electronics

Itzhak Tserruya, BNL, Aug. 11, Material, weight radiation length The detector box is made of 3/4” thick honeycomb structures sandwiched between two G10 sheets ¼ mm thick. Entrance window: double mylar window 50 μ thick with inter volume flushed with N 2. Total radiation budget of detector box and electronics of about 1.5%. Total weight of app. 5kg per half detector.

Itzhak Tserruya, BNL, Aug. 11, Exploded view (old drawing)

Itzhak Tserruya, BNL, Aug. 11, d view: detector closed (old drawing)

Itzhak Tserruya, BNL, Aug. 11, d view: detector opened (old drawing)

Itzhak Tserruya, BNL, Aug. 11, Half a detector (old drawing)