DTOS FAQ Speed is the key for the future PM : Jimmy Hsu Ext : 7298 (Version 1.5)

Slides:



Advertisements
Similar presentations
USB Controlled IO Module Jon Knoll Dave Wolowicz Sponsored by: Dr. Kin Li A 499a Project.
Advertisements

1 A Schneider Electric Software for Pre-Design of Industrial and Tertiary Building Electrical Distribution.
© 2012 All rights reserved to Ceedo. Flexible Desktops. Dynamic Workplace. Ceedo Client Offerings For Service Providers Ceedo Client Workspace Virtualization.
SOM-4463 B1 Sales Kit Intel® Luna Pier Refresh (N455 & D525) ETX Module Gina.Hsiao PM, ECG June, 2011.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Chapter 5 Operating Systems. 5 The Operating System When working with multimedia, the operating system is perhaps the most important, the most complex,
Part 1 Background Part 2 The RISAS Board Accreditation Agency RISABs Suppliers IT Application Scheme Administrator Documentation RISAS001/01 RISAS002/01.
Introduction to Operating Systems CS-2301 B-term Introduction to Operating Systems CS-2301, System Programming for Non-majors (Slides include materials.
Customer Needs  Improve current wave forms drawn by infrared paper dryers The firing controller decreases THD and crest factor Power quality should meet.
Students: Nir Engelberg Ezequiel Hadid Supervisor: Mony Orbach In association with: November 23, Winter 2004.
EECS/CS 470 Computer Architecture Winter rev 1 2 Goals of the Course Advanced coverage of computer architecture General purpose processors, embedded.
Printed Circuit Board System Block Diagram:Schematic Pin Mapping Power Supply Vin Min: 3.2V Vin out: 9V Vin Max: 3.4 V Frequency:1600kHz Finite Element.
Inspection and Testing of Fire Alarm Systems (ITFAS)
1 What is an operating system? CSC330Patricia Van Hise.
Building a Typical Electronic Project in Senior Design Peter Wihl (former Guest Lecturer)
Programmable Logic Controllers (PLCs) This course deals with PLCs, Programmable Logic Controllers. PLCs are the industrial computer/controllers that are.
30 day money back guarantee if you are not satisfied Coupled with a no-hassle, 12 month warranty against manufacturer’s defects Zaber’s Money Back Guarantee.
Mind Board Company Profile Company Profile. Meets the challenge of Meets the challenge of creating complex designs PCB DESIGN CENTER.
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
Click on Proceed for Bid Submission. Click on Go to Load the forms internally.
SchedulingProducingControllingSchedulingProducingControlling.
Alfresco – An Open Source Content Management System - Bindu Nayar, Bhavana Mohanraj.
Chapter 19 Upgrading and Expanding Your PC. Getting Started FAQs: – Can I upgrade the processor in my PC? – Will adding RAM improve my PC’s performance?
Presentation of HanKing
11/18/2013 AIM: What steps can we take to plan an effective presentation? ( Lesson 2) Do Now : 1. What is a flow chart? A diagram which displays movements.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Intro to Architecture – Page 1 of 22CSCI 4717 – Computer Architecture CSCI 4717/5717 Computer Architecture Topic: Introduction Reading: Chapter 1.
System Specification Specify system goals Develop scenarios Define functionalities Describe interface between the agent system and the environment.
System Development Life Cycle. The Cycle When creating software, hardware, or any kind of product you will go through several stages, we define these.
The SBE Method Solutions Based Engineering By: Ralph M. DeFrangesco BSCS, MBA, PhD candidate
A powerful network monitoring system
Last week Installed PADS and XILINX Learning PADS (tutorials of PADS Layout and Logick) Web- code.google.com/p/hv8cb/ Learning about my project.
 Computer freezes  Internet won’t connect  won’t work  Sound isn’t working  Program won’t run  Document won’t print And What Is the First.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
Sony Pictures Confidential Watermarking in AACS. Sony Pictures Confidential SPE Forensic Watermarking Goals Goals: – Identify the device that was compromised.
Chap 1 Introduction. What is OS? OS is a program that interfaces users and computer hardware. Purpose: Provides an environment for users to execute programs.
R&D and Product Development Engineering Management & Design Process Hub van de Bergh - July Rev 1 | 17 July 2004 | Hub van de Bergh
Software By : Madam aisha. Hardware: The physical equipment in a computing environment such as the computer and its peripheral devices printers, speakers...
1 Viewing Activation History Audience: All Audiences Module Scope: The process of how to view activation history.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
ECE398: The Design Review Fall What the Design Review is  Board meeting with engineers- (faculty, TA, classmates)  Structured discussion of your.
Timothy Kritzler and Joseph Mintun Sponsor: Martin Engineering, Illinois Advisors: Dr. Malinowski and Dr. Ahn Bradley University Electrical and Computer.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
PAPER PRESENTATION BASICS. INDEX I. TYPE II. FORMAT i. Abstract ii. Introduction iii. Line diagram iv. Working v. Quantitative facts vi. Analysis and.
Communicating Visually with Visio Gini Courter Annette Marquis.
Freescale Semiconductor Confidential and Proprietary Information. Freescale™ and the Freescale logo are trademarks of Freescale Semiconductor, Inc. All.
Welcome to ISTUG the Independent User Group for Users of SES Software Visit our web site
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
Panasonic UC Pro - UC Pro Server setup with Active Directory -
Special Meeting of Abra Business Partners Thursday, August 19, 2010.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
Algorithm Change Notice (ACN) What is it? How does it work? Frank Toth September 24, 1999.
© CGI Group Inc. PrimePortal & #define Annika Maltesson, Project Krister Sundkvist,
Revision Chapter1/2 How many devices can be connected with one IDE/EIDE/PATA interface? How many devices can be connected with one SATA interface? What.
Returns Guide Returning your goods is a simple 2 step process: Step 1# Your returns Paperwork - This ensures your refunded for any item being returned.
Current Electricity bing. com/videos/search
NAND Chip Driver Optimization and Tuning
Programmable Logic Devices
Design and Documentation
Project Plan, Task Checklist, Estimates Project Prototyping
LuvRacin.com… the National Racing Network.
Jackie Lee Hyman Wu Louis Luo Gen Wu
OCP Design Contribution Wiwynn Debug Card Introduction
Rapid Automation Design
Current Electricity.
5 POINT PLAN THE SYSTEMS LIFE CYCLE ANALYSE DESIGN
Business Plans Sales Training
Presentation transcript:

DTOS FAQ Speed is the key for the future PM : Jimmy Hsu Ext : 7298 (Version 1.5)

FAQ 1 Question: Who own the design of customer carried board ? Answer: Advantech own the design of both HW and SW of DTOS

FAQ 2 Question: Who sources the component for the samples in ES stage ? Answer: Advantech will source most of the common components, Customer will have to consign or down payment for special parts including connectors or IC

FAQ 3 Question: Would Advantech allow 3 rd party to produce the CSB (customer carried board)? Answer: After the customer’s order exceed 1000 pcs, customer is entitle to have the design of CSB which include a) Schematic File b) Gerber File

FAQ 4 Question: What kind of drivers are included in NRE ? Answer: Advantech will offer the drivers which come with the SOM CPU Module if required

FAQ 5 Question: What kind of certifications are included in NRE ? Answer: Advantech will perform the test only on the basic function (not include temperature, EMI, ESD… special certification required by customer)

FAQ 6 Question: What kind of test will be done in the first 3 engineering sample ? Answer: a) Advantech will perform only have the test for the basic function (not include temperature, EMI, ESD… special certification required by customer) b) Customer need to provide test process for proprietary function or take the responsibility for testing c) Please refer to Appendix B of Engineer Interface Doc

FAQ 7 Question: Does Advantech accept the installment of NRE charge ? Answer: Advantech does not accept installment of NRE charge & this NRE charge is not Refundable.

FAQ 8 Question: What is the lead time for Mass production? Answer: For 6 weeks lead time not require forecast For 4 weeks lead time require 3 months rolling forecast provided by customer

FAQ 9 Question: What is the min Qty for pilot run and mass production ? Answer: Min Qty 50pcs for Pilot Run Min Qty 200pcs for Mass Production

FAQ 10 Question: Can I ask the engineering change within or after DTOS 30days? Answer: Any engineering change during this period is not permitted

FAQ 11 Question: Should I pay for the engineering change ? Answer: a) Any Engineering Change should proceed by ECR process and only one ECR process allowed If found to be Advantech’s responsibility, Free of Charge. Otherwise, subject to charge by the complexity of the change. b) Any serious Engineering Change should be considered as another New DTOS project.

FAQ 12 Question: What will cost the modification for 2 nd sample ? Answer: a) Any Engineering Change should proceed by ECR process and only one ECR process allowed If found to be Advantech’s responsibility, Free of Charge. Otherwise, subject to charge by the complexity of the change. b) Any serious Engineering Change should be considered as another New DTOS project.

FAQ 13 Question: What is DTOS? Answer: a) DTOS stands for Design To Order Service which is the service Advantech offer to customer and it’s aiming to provide a computing function board customization speedy service on both HW and SW side b) Please refer to the next page for the simple diagram on its process

Through SOM web page Select SOM engine Select I/O connectors Draft Placement Select function block Placement confirmation NRE $19,50030 Days Get 3 Engineer Samples DTOS simple flow chart

FAQ 14 Question: What kind of the information need to be confirmed before DTOS start? Answer: (a) Mechanical drawing and board layout (b) Schematic (required) (c) OS and driver requirement (d) Test environment

FAQ 15 Question: What kind of the information need to be include in Sales Leads? Answer: (1) Customer Background (2) Project Background (3) Product Spec. Please refer to detail of the DTOS Application Form

FAQ 16 Question: What kind of the information which need to confirmed before DTOS 30 Days start? Answer: (1) Customer Solution Board Specification (a) Desired function on SOM (b) Special function on customer solution board (c) Replacement Parts/Connectors (d) Customer Proprietary Circuit (2) Customer Solution Board Block Diagram (3) Customer Solution Board Placement

FAQ 17 Question: What does customer get after DTOS 30 Days? Answer: (1) Customer should receive 3 Engineer Samples of DTOS products (2) Advantech will offer the drivers which come with the SOM CPU Module if required