1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
February 17-18, 2010 R&D ERL Ady Hershcovitch R&D ERL Beam Dump Ady Hershcovitch February 17-18, 2010 Beam Dump.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Jim Stewart (JLAB) Internal Magnet Review May 2009.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.
Structural drawing Instructor: M.Yaqub
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Jim Stewart Tagger Magnet Design Review July 2009.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
MAGNETISM MAMBO.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
Concepts for New Recycler Lambertons GW Foster Dec 2000.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
SBS Magnet and Support Status Robin Wines June 2013.
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
LARP Collaboration Meeting Racetrack Coil Fabrication
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Magnetized Beam LDRD: Design Tasks February 19, 2016.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
Structural drawing.
CLAS12 Beamline Configurations
Development of a low material endplate for LP1 and ILD
Progress and Issues with VTS Upgrade
IR Detector - Test cryostat : Machining
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Reading Precision Sheet Metal Prints
Update on GEp GEM Background Rates
MICE Coupling Coil Update
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Additional Upstream Coil Shielding
LARP Phase II Secondary Collimator RC-1
Ceramic to metal connection.
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE Jan Van Der Laan, PHD. PHYS. Massachusetts Institute of Technology Laboratory for Nuclear Science

2 PRELIMINARY LAYOUT

3 LAYOUT DETAIL

4 MAGNET ASSEMBLY

5 MAGNET DESIGN SPEFICATIONS OVERALL LENGTH CM (55.76 IN) EFFECTIVE LENGTH CM (49.21 IN) STEEL LENGTH CM (47.82 IN) OVERALL HEIGHT CM (23.76 IN) STEEL HEIGHT CM (18.00 IN) OVERALL WIDTH CM (24.50 IN) STEEL WIDTH CM (24.50 IN) WEIGHT KG ( LBS) POLE GAP CM (1.18 IN) TURNS PER COIL FIELD STRENGTH GeV, 10.3 Deg GeV, 2.4 Deg.

6

7

8

9

10

11

12 SAMPLE DETAIL DRAWINGS 1: Detail drawings for the magnets have been sent to “New England Techni-Coil Inc.” In Wolfboro NH. A cost quote and lead time are pending. 2: Detail drawings for stands in process. Stands can be constructed at Bates. 3: Detail drawings for vacuum chambers in process. Chambers can be constructed at Bates. 4:Additional fabrication sources will be considered upon request. DRAWING SHOWN IN PRESENTATION MAY NOT BE LASTEST REV. AS DESIGNS MAY STILL BE IN PROGRESS

13

14

15

16

17

18

19 SUPPORT STANDS 1: Welded tubular steel construction. 2: Course height and level adjustments made via 4 leveling pads. 3: Fine positional adjustment made via 6 struts mounted to a removable plate. 4: Stands are designed to place center of magnet poles 57CM below beam height. 5: Different heights will be addressed with pedestals of similar construction.

20

21

22

23

24 VACUUM CHAMBER Chamber is constructed from 304 stainless steel with internal welds, where possible, 0r full penetration external welds where internal is not possible. The round flange uses a copper conflat gasket, and the rectangular flange uses an All metal “VAT” seal.

25 RECTANGULAR “VAT” SEAL

26 VACUUM CHAMBER DEFLECTION

27

28 REMAINING DETAILS Final design drawings for the stands and connecting vacuum chambers will be completed upon approval of the preliminary magnet design. Trim coil design in progress. Strain relief for power and cooling connections needs to be designed Layout and designs could change pending a discussion regarding magnet poles which are parallel to the beam or poles with equal entrance and exit angles. Secondary pole tips need to be detailed to machine drawings for 12kG configuration.