Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

Work Breakdown Structures
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Chapter 6: Project Time Management
Chapter 6: Project Time Management
Management & Development of Complex Projects Course Code - 706
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Project Time Management
Importance of Project Schedules
Chapter 6: Project Time Management
1 Project Time Management. 2 Learning Objectives Understand the importance of project schedules and good project time management Define activities as.
Chapter 6: Project Time Management
Project Time Management
Chapter 6: Project Time Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Information Technology Project Management, Seventh Edition.
Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original.
Project Time Management, Mohammad A. UHCL 1 Project Time Management Mohammad A. Rob.
Scheduling Sequence & Time.
Chapter 6: Project Time Management
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Project Management Project Planning Estimating Scheduling.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Time Management Part 1. Learning Objectives 2 Understand the importance of project schedules and good project time management Define activities.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Copyright Course Technology Chapter 5: Project Time Management.
Advanced Project Management Project Time Management Ghazala Amin.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
Information Technology Project Management, Sixth Edition.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
1 Chapter 6: Project Time Management. 2 Learning Objectives Understand the importance of project schedules and good project time management Define activities.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Week 6 – Project Time Management
Project Management MGT 30725
Plan Schedule Management
Chapter 6: Project Time Management
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal acceptance Controlling scope – Change control 2

On-time project delivery is a challenging task Schedule problems are common Time can be measured easily Comparison of estimated and actual time Time is least flexible; time always goes on Individual work styles, cultural differences, work ethics Project time management 3

Defining activities Sequencing activities Estimating activity resources Estimating activity durations Developing the schedule Controlling the schedule 4

Start and end dates in project charter Main inputs: scope statement and WBS Main output: activity list Activity list – Activity name, identifier, and brief description Activity attribute – Predecessors, successors, logical relationships, leads and lags, resource requirements, constraints, imposed dates, and the related assumptions 5

Milestone – A significant event with no duration – Helps to identify main activities – Assists to set schedule goals and monitor progress – Not necessarily deliverable 6

Determining the dependencies Evaluating the reasons for dependencies Dependencies – Mandatory / hard logic – Discretionary / soft logic – External Main inputs: activity list, scope statement, milestone list 7

Network diagrams – Also called project schedule network diagrams or PERT charts – Schematic display of logical relationships and sequencing of activities – Arrow Diagramming Method (ADM) / Activity On Arrow (AOA) approach – Precedence Diagramming Method (PDM) 8

9 Figure source: IT Project Management, K. Schwalbe, 6 th ed., p. 218

Find all activities which start at Node 1 Draw finish nodes Draw arrow between the nodes and label it with activity name and duration Look for bursts and merge Continue it from left to right until all activities are included No arrows should cross on the diagram 10

11 Figure source: IT Project Management, K. Schwalbe, 6 th ed., p. 219

12 Figure source: IT Project Management, K. Schwalbe, 6 th ed., p. 221

PDM is used more frequently No dummy activities in PDM – Dummy activities are often used in AOA – No duration and resources required – Often needed to show logical relationship – Represented with dashed arrow lines and zero duration PDM shows different dependencies among tasks whereas AOA uses finish-to-start dependency only 13

Before estimating the duration, good estimate for other resources Nature of project and organization affect resource estimation Tools: expert judgment, analysis of alternatives, estimating data, project management software Good to have team members having experience of similar projects 14

Important questions to answer – How difficult will it be to do specific activities? – Is there anything unique in project scope that will affect resources? – What is the organization’s history in doing similar activities? – Does the organization have appropriate resources? – Would it make some sense to outsource some of the work? 15

Main outputs: list of activity resource requirements, resource breakdown structure, project document updates Activity resources estimate also helps in other knowledge areas of project management Resource breakdown structure – Hierarchical structure of resources – Identify resources categories and types – Resources category: programmers – Resources types: Java and.NET programmers 16

Estimation of durations Duration: actual time worked on an activity plus elapsed time Resources assigned to a task also affect the task duration estimate Duration VS effort If scope changes, duration estimates should be revised Always good to review similar projects and seek experts’ advice 17

Main inputs: activity list, activity resource requirements, resource calendars Team should review the accuracy of duration estimates so far on the project Availability of human resource is critical Main output: activity duration estimates Duration estimates are in the form of discrete number 18

Optimistic – Best case scenario Most likely – Most likely / expected scenario Pessimistic – Worst case scenario Required for PERT estimates Expert judgment is good tool 19

Results from earlier time management processes required for schedule development Several iterations of processes are required to finalize the schedule Main objective: realistic project schedule It provides basis to monitor project progress for the time dimension Main output: project schedule Tools: Gantt chart, critical path analysis, critical chain scheduling, PERT analysis 20

Standard format to show project schedule Also called bar charts Project activities, start and end dates, milestones, summary task, task dependencies Activities are same as mentioned in WBS Different symbols are used 21

22 Figure source: IT Project Management, K. Schwalbe, 6 th ed., p. 225

SMART criteria Specific Measurable Assignable Realistic Time-framed 23

Define milestone early in the project and include them in Gantt chart Keep milestones small and frequent The set of milestones must be all-encompassing Each milestone must be binary, either complete or incomplete Carefully monitor the critical path 24

Monitor the project progress and revise the plan Build on a solid line i.e. with least defects (less than.1 percent defect rate) Assign the right people to right tasks. Put the best developer on the critical tasks Start with high-risk tasks “Don’t boil the ocean” Integrate early and often, and follow practices like the daily build process 25

Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies – Mandatory, discretionary, external – evaluating the reasons for dependencies Estimating activity resources – list of activity resource requirements, resource breakdown structure, project document updates Estimating activity durations – Duration VS effort, activity duration estimates – Three point estimates Developing the schedule – Project schedule, Gantt charts 26