ESOH Committee Report 2010 International System Safety Conference (ISSC) 30 August – 03 September 2010 Minneapolis, MN Theme: "Building Bridges to a Safer Future" ESOH Committee meeting this afternoon Time: 1:30 – 4:30 pm Location: this building; room 201, Booz Allen Hamilton Meeting focus on possible responses to industry comments on draft revision to MIL-STD-882D, "DoD Standard Practice for System Safety" DoDI mandates use on developmental and sustaining engineering contracts Industry comments have been extremely useful in identifying areas where clarifications are needed As of: 18 August August 2010 NDIA Systems Engineering Division Meeting1
ESOH Committee Report Industry comments driving toward greater definition of procedures Increasing the "standard" part of standard practice Moving further along path toward "ESOH Risk Management" ESOH = Environment, Safety, and Occupational Health System Safety is part of the "S" in ESOH 882C focused primarily on safety of the system 882D revision evolving into ESOH risk management tool in accordance with DoDI mandate to integrate ESOH into SE Committee meeting looking at two proposed responses to the industry comments on the draft revision to 882D Eliminating the numerical definitions of probability to allow flexibility in utilization of rate or likelihood data or information Clarifying description of the risk assessment process Utilizing MRAP Rollover High risk as the example As of: 18 August August 2010 NDIA Systems Engineering Division Meeting2
BACK UP CHART As of: 18 August August 2010 NDIA Systems Engineering Division Meeting3
4 ESOH Committee Report Total Critical – 25 Significant – 175 Administrative – 33 Number of Industry Comments As of: 18 August August 2010 NDIA Systems Engineering Division Meeting