TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
Click on this image to open the full PDF document.
Jet Car Science Club November 2011 Christopher Uhl.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Fishing FishingBot is a robot looks like a fish. It can make to bite fishing needle as closing mouth with Servo Motor when Infrared Sensor Board detects.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
FanBot is a fanning robot using High-speed DC Motor. Fan.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Rod Dry Dec Training Module #6: Problem Statement Low pressure steam (1 barg) is condensed in a heat exchanger with cooling water. The exchanger.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
1ESAComp Users’ Meeting 2006 University of Applied Sciences of Northwestern Switzerland March 2–3, 2006 High-Precision Composite Support Structures for.
Atlas Tracker Thermal Management Workshop, , A. Onnela, CERN Experience from CMS tracker cooling: Tracker Outer Barrel (TOB) Antti Onnela TOB Project.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Module transport
Baby-MIND Modules & Services
Tracker Outer Barrel COOLING Antti Onnela, CERN.
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Rod adaptors for module tests Module positioning studies
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Ideas and Plans on Tracker Module Mechanics Developments
New Design for Beam Test Structure
ROD assembly and test in US
Silicon Strip Tracker MPR November 2004 CMS TRACKER COLLABORATION
First Assembled Rod in US
68-76 Pocket Goniometer PGX
OT Survey & Adjustment Outline: Survey technique at present
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
HL-LHC upgrade at IPHC news
Presentation transcript:

TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki to CERN.

TOB Production - January 2004 Rod frame quality control measurements Results for the first 10 production rods: Co-planarity of module supports: < 50  m Location of module dowel pins: < 40  m Cooling contacts ok. 24 module supports / rod 12 dowel pins / rod

TOB Production - January 2004 Rod cabling stand at CERN

TOB Production - January 2004 Final rod quality and acceptance tests with radioactive source in a ‘XY-table’ Place for 3 rods inside a box Cobalt source guided by linear moving arms Scintillator for trigger

TOB Production - January 2004 TOB Carbon-fiber support Wheel production on-going at Plyform, Italy Disk laminate plates (photo) and cylinder molding tools ready.

TOB Production - January 2004 TOB Assembly and Cabling Mock-up Half disk of the TOB for cabling exercises Final TOB assembly, transportation, and insertion tooling Tracker support tube mock-up Supports for TIB/TID insertion exercises

TOB Production - January 2004 TOB Cooling tests: Modules and Rods From testing of single and double modules to testing of complete rods Tests performed in –20 °C.  Tmax = 10 °C between silicon and coolant. Equal cooling in all module positions along the rod.

TOB Production - January 2004 TOB Cooling tests: System tests A complete TOB cooling segment with 19 “rods” installed and tested in the tracker cold-room Tests in room temperature and –25 °C. Successful and simple filling and draining. Equal cooling performance in all parallel rods. 12 m