Booster Bias Supply Upgrade November 30 th, 2011.

Slides:



Advertisements
Similar presentations
Participants: C-1:Cryogenic last-stage suspensions (interferometers) (F.Ricci-G.Frossati) Objectives: -Design new suspension elements for the last stage.
Advertisements

LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Booster Bias Supply Upgrade April 2, First prototype was started in December The back half of the supply was totally gutted Transformer Interphase.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
(a) (b) (c) (d). What is (1,2,3)  (3,4,2)? (a) (1, 2, 3, 4) (b) (1,2)  (3,4) (c) (1,3,4,2) (d) (3,1)  (4,2)
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
NOvA Water Cooling System Erik Voirin, Mike Zuckerbrot Erik Voirin; Mike Zuckerbrot1NOvA Water Cooling System.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Booster Bias Supply Upgrade January 18 th, Ferrite Bias Supply Testing  Four thermocouples added to MADC  Monitoring: center winding, core, input.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Harmonics Problems in Distribution Systems Case Study AEP Texas Central Company Scott Lee, Reliability Engineer.
CHAPTER 18 Power Supplies. Objectives Describe and Analyze: Power Supply Systems Regulation Buck & Boost Regulators Flyback Regulators Off-Line Power.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Area of Inundation Industrial Drive Area of Flooding =
Booster Bias Supply Upgrade March 13, Three New Ferrite Bias Supplies Two are working and installed. One in MI station #5, one in Booster station.
Linac Status May 19, 2015 Time Meeting D. Raparia.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
VELOPEX EXTRA - X Mk 1V Automatic dental X-ray film Processor
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Chapter 1 Common Diode Applications Basic Power Supply Circuits.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
By carter November 2 nd,. Bees are born Breath air Grow die.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Eliminator 38 Pounds 19,100 BTU’s 200 CFM 15amp outlet compliant amps per heat elements Precise Temperature Settings Years of Field Testing Listed.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
SBS- Counterweight Support and Magnet Assembly - Status
Roger Wendell for the OD group
CPU A Central Processing Unit is the main chip in the computer an dis located in the motherboard it Is and Intel make. The job of the component is to process.
PROFESSIONAL HVAC SERVICING ● Q ’ s HVAC Inc uses trusted, quality products to enhance and repair your existing heating and cooling systems. ● Our products.
Heat transfer Chapter 7.
Replacing TrueAir Thermostat with Ecobee SI
3 x Transformer boards ISO View Fans Oriented as in Super Micro Case


Presentation transcript:

Booster Bias Supply Upgrade November 30 th, 2011

Three new Ferrite Bias Supplies Built  Two are complete – for NOvA  One is fully tested and operational  The other runs but needs further troubleshooting for odd slewing problem  Third one is 40% complete - Booster spare  Finished in the next 3-4 weeks There are 10 “Ling” MK I supplies that will need upgrading – Booster West Gallery only  Replace main rectifier Transformer – marginal power rating for 15 Hz operation.  Replace PVC SCR heat sinks – prone to LCW water leaks with any pressure surge.  Upgrade can be done one at a time by changing out supply with spare.

Ling transformer test, November 15 th, Hz

Ling transformer test, November 16 th, Hz

Ling transformer test, November 17 th and 18th, Hz with fans and top plate lifted 3.5 inches

MK I Bias Supply SCR Packages – PVC cased heat sinks

New Style SCR Packages with Larger Transformer

MK I Bias Supply Main Rectifier Transformer

MK I Bias Supply SCR Packages with Main Rectifier Transformer - Behind

Last transformer order was in The vender was NWL and they provided six units at a cost of $16,474 ea. The expected lead time is 4-6 months so they should be sent out for bid ASAP.