INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation.

Slides:



Advertisements
Similar presentations
Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Overview Presented to: Data Privacy Task Force February.
Advertisements

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
ECDA Process for Cased Gas Transmission Pipelines
Preparing for Compliance Monitoring Reviews Understanding CMS Protocols Used by Review Organizations January 14, 2009 Presented by: Margaret deHesse, RN,
NACE Direct Assessment Standards Office of Pipeline Safety (OPS) Public Meeting November 4, 2003.
E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
OPS Stress Corrosion Cracking Workshop OPS Research and Development Projects James Merritt R&D Program Manager, Office of Pipeline Safety
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
BASIC CONCEPTS IN PIPELINE INTEGRITY MANAGEMENT
Direct Assessment Basics
External Quality Assessments
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Pipeline Corrosion Management NACE Houston Section April 9, 2013 Drew Hevle - Manager, Corrosion Control Kinder Morgan Natural Gas Pipeline.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
Stress Corrosion Cracking Overview & Introduction David Johnson December 2, 2003.
1 Philip Sher Connecticut Department of Public Utility Control Gas Pipeline Safety Unit RepresentingNAPSR National Association of Pipeline Safety Representatives.
Technical Committees 101 or, Everything You Always Wanted to Know About Technical Committees* (*But Were Afraid to Ask)
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Integrity Management Inspection Process Don Moore, OPS Central Region.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
CIS Case History NACE Eastern Area Conference
1 DCP Midstream 2008 School Campaign Jeannette Jones November 21, 2008 Pipeline Safety Trust – 2008 Conference New Orleans, LA.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
TX SET Update to RMS Wednesday, October 10, 2007.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Managing Your Graduate Program John Sessions Chair, FERM SFM Graduate Program September 19, 2012.
SEMINAR NAIC/ASSAL/SVS REGULATION & SUPERVISION OF MARKET CONDUCT © 2014 National Association of Insurance Commissioners Market Conduct Examination Standards.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
ICDA of Gas Transmission, Gathering & Storage Systems GOAL: Develop a protocol for Validation of dry gas ICDA method: –Identify data needs –Develop procedures.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
Research Needs on SCC of Pipelines Raymond R. Fessler Stress-Corrosion Cracking (SCC) Workshop DOT/RSPA Houston, TX December 2, 2003.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
Stress Corrosion Cracking (SCC) Josef Kopec, P.Eng.
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
MICHAEL BAKER Jr., Inc. Stress Corrosion Cracking SCC Workshop December 2, 2003 Engineering & Energy.
1 ITSA Meeting April 2, 2004 San Diego Thermal Spraying in California.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Middle Fork Project Relicensing Process Plan April 25, 2006.
IMP for Casings October 7, 2009 NACE Eastern Area Conference Max Kieba, PHMSA HQ Engineering and Emergency Support (i.e. Joe Mataich (or other))
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
NGA Direct Assessment Projects Debbie DiMeo, Director, Plans and Operations Northeast Gas Association OPS ECDA Public Meeting November 4, 2003
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE IFSA Monthly Update Meeting January 3, 2014 NEEA Market Research & Evaluation.
Stress Corrosion Cracking Technical Workshop Office of Pipeline Safety Research and Special Programs Administration SCC Workshop December 2, 2003 Houston,
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
SPECIAL COMMITTEE RECOMMENDATIONS STATUS CTS Fall Planning Meeting San Marcos September 6, 2013 Don Drumtra Good morning.
TG Chair: Mark Brinsden Shell
Update on CTAC LNG Subcommittee
Ballot Idea#: 2817 Identifying Coating Faults and Their Severity through Electrolyte Resistivity Measurements Eric Pozniak (PureHM Edmonton Canada) PRCI.
CUSC Amendment Panel Recommendation
Water Quality Planning Division Monitoring & Assessment Section
VESI Technical Standards Harmonisation Technical Standards Working Group 19 July 2019(Final)
Presentation transcript:

INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation

Overview External Corrosion Direct Assessment workgroup – Sponsored by INGAA – Many other participating organizations – Validation efforts – PRCI, NGA, PG&E, AGA/GTI

Overview Other workgroups – Internal corrosion direct assessment – SCC direct assessment

Goals of workgroups Provide forum for participation for operators, contractors, and regulators Distribute information Coordinate research and validation efforts Identify gaps

Goals of workgroups Discuss and propose new research Provide input to standards and regulatory development Develop and distribute protocols Identify new technologies and applications

ECDA Workgroup ECDA workgroup headed by Drew Hevle of El Paso Latest meeting September 26 in Houston Conference calls being held bi-weekly Next meeting December 18 in Houston

ECDA Workgroup Makeup ECDA distribution list includes approximately 125 members – 60 operators (includes gathering, transmission and distribution) – 50 contractors/industry organizations – 15 regulators (both state and federal) – Some participants from outside the natural gas industry, some international, not all interest strictly in Title 49 changes Similar distribution for ICDA workgroup

ECDA Workgroup (fun and exciting)

ECDA Workgroup Status – PRCI validation project updates from nine of the participating companies – Development of an ECDA Guidebook to aid in converting the NACE standard RP 0502 into procedures and specifications

ECDA Workgroup Status – Update on NGA’s validation effort – Soils model update – Opportunities for site visits

PRCI High-Impact Program Co-funded by DOT, managed by Fred Joyner Programs – External Corrosion Direct Assessment Review of 2000/2001 data ECDA validation project Reliability-based risk assessment Soils model ECDA Manual – Others

PRCI High-Impact Program Companies were requested to volunteer pipeline segments that had been in-line inspected recently – Most pipelines were large diameter coated transmission gas pipelines Protocol developed to apply NACE 0502 in a consistent manner

PRCI High-Impact Program Consultants provided to conduct the indirect inspections and direct examinations in a consistent manner Additional tools evaluated, such as EUPEC RMS Delta survey, soils model, Miller DA meter, additional direct examinations made

PRCI High-Impact Program Participating companies – CenterPoint Energy – Duke Energy/Union & Texas Eastern – El Paso/Tennessee Gas – Enbridge/Consumers – Gulf South (2 segments) – Panhandle (2 segments) – SoCal (3 segments) – Williams

PRCI High-Impact Program Results – Goal to complete direct examinations by Thanksgiving – Periodic updates at ECDA workgroup meetings and conference calls – PRCI will generate a final report available in 2004

ECDA Workgroup Gaps identified – Identify the limits of the NACE standard Shielding coating Rocky backfill Adjacent metallic structures

ECDA Workgroup Gaps identified – Confirmatory direct assessment PRCI project conducted with ILI and ECDA results Would be relatively simple to take this existing data and evaluate for effectiveness with CDA

ECDA Workgroup Gaps identified – New methods for calculating reassessment intervals – Better and more efficient indirect assessment tools for bare and poorly coated pipelines

ECDA Workgroup Gaps identified – Need for consistency in application – Need for standards for indirect inspections – Issues with telluric currents and new inspection techniques

ICDA Workgroup ICDA headed by Garry Matocha of Duke Energy Latest meeting October 20, 2003 Next meeting scheduled for January 2004

ICDA Workgroup Status – NACE RP for ICDA (Dry Gas Systems) expected to go out for ballot this week – Short uninspectable segments are portions of the systems which will be difficult to evaluate. Additional work in this area is needed.

ICDA Workgroup Status – The CDA work group requested input regarding CDA procedures for internal corrosion. This is currently under development by a smaller group which will circulate the proposed procedures to the larger work group for comment prior to the next meeting.

SCCDA Workgroup SCCDA standard is still in the development stage – NACE TG 273 is developing the standard – Chair John Beavers, vice-chair Jim Marr – Preliminary draft discussed at NACE Corrosion Technology Week in September in Pittsburgh No formal workgroup has been created yet

Participation If you would like to participate in any of these groups, please contact – ECDA – Drew Hevle – ICDA – Garry Matocha

INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation