INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation
Overview External Corrosion Direct Assessment workgroup – Sponsored by INGAA – Many other participating organizations – Validation efforts – PRCI, NGA, PG&E, AGA/GTI
Overview Other workgroups – Internal corrosion direct assessment – SCC direct assessment
Goals of workgroups Provide forum for participation for operators, contractors, and regulators Distribute information Coordinate research and validation efforts Identify gaps
Goals of workgroups Discuss and propose new research Provide input to standards and regulatory development Develop and distribute protocols Identify new technologies and applications
ECDA Workgroup ECDA workgroup headed by Drew Hevle of El Paso Latest meeting September 26 in Houston Conference calls being held bi-weekly Next meeting December 18 in Houston
ECDA Workgroup Makeup ECDA distribution list includes approximately 125 members – 60 operators (includes gathering, transmission and distribution) – 50 contractors/industry organizations – 15 regulators (both state and federal) – Some participants from outside the natural gas industry, some international, not all interest strictly in Title 49 changes Similar distribution for ICDA workgroup
ECDA Workgroup (fun and exciting)
ECDA Workgroup Status – PRCI validation project updates from nine of the participating companies – Development of an ECDA Guidebook to aid in converting the NACE standard RP 0502 into procedures and specifications
ECDA Workgroup Status – Update on NGA’s validation effort – Soils model update – Opportunities for site visits
PRCI High-Impact Program Co-funded by DOT, managed by Fred Joyner Programs – External Corrosion Direct Assessment Review of 2000/2001 data ECDA validation project Reliability-based risk assessment Soils model ECDA Manual – Others
PRCI High-Impact Program Companies were requested to volunteer pipeline segments that had been in-line inspected recently – Most pipelines were large diameter coated transmission gas pipelines Protocol developed to apply NACE 0502 in a consistent manner
PRCI High-Impact Program Consultants provided to conduct the indirect inspections and direct examinations in a consistent manner Additional tools evaluated, such as EUPEC RMS Delta survey, soils model, Miller DA meter, additional direct examinations made
PRCI High-Impact Program Participating companies – CenterPoint Energy – Duke Energy/Union & Texas Eastern – El Paso/Tennessee Gas – Enbridge/Consumers – Gulf South (2 segments) – Panhandle (2 segments) – SoCal (3 segments) – Williams
PRCI High-Impact Program Results – Goal to complete direct examinations by Thanksgiving – Periodic updates at ECDA workgroup meetings and conference calls – PRCI will generate a final report available in 2004
ECDA Workgroup Gaps identified – Identify the limits of the NACE standard Shielding coating Rocky backfill Adjacent metallic structures
ECDA Workgroup Gaps identified – Confirmatory direct assessment PRCI project conducted with ILI and ECDA results Would be relatively simple to take this existing data and evaluate for effectiveness with CDA
ECDA Workgroup Gaps identified – New methods for calculating reassessment intervals – Better and more efficient indirect assessment tools for bare and poorly coated pipelines
ECDA Workgroup Gaps identified – Need for consistency in application – Need for standards for indirect inspections – Issues with telluric currents and new inspection techniques
ICDA Workgroup ICDA headed by Garry Matocha of Duke Energy Latest meeting October 20, 2003 Next meeting scheduled for January 2004
ICDA Workgroup Status – NACE RP for ICDA (Dry Gas Systems) expected to go out for ballot this week – Short uninspectable segments are portions of the systems which will be difficult to evaluate. Additional work in this area is needed.
ICDA Workgroup Status – The CDA work group requested input regarding CDA procedures for internal corrosion. This is currently under development by a smaller group which will circulate the proposed procedures to the larger work group for comment prior to the next meeting.
SCCDA Workgroup SCCDA standard is still in the development stage – NACE TG 273 is developing the standard – Chair John Beavers, vice-chair Jim Marr – Preliminary draft discussed at NACE Corrosion Technology Week in September in Pittsburgh No formal workgroup has been created yet
Participation If you would like to participate in any of these groups, please contact – ECDA – Drew Hevle – ICDA – Garry Matocha
INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation