1 5 December 2010 Modèle TN-02.018-1.1 Tutorial XML Maintenance Group ISO/TC 211 - Canberra 5 December 2010 DT.TN/10.222.

Slides:



Advertisements
Similar presentations
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Advertisements

Governance & Nominating Committee (GNC) Report WECC Board Meeting – December 6-7, 2007.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
IPCC Products, Procedures and Processes Amsterdam, 14 May 2010 Dr. Renate Christ, Secretary of the IPCC.
Introduction to the ASA Standards Program Paul D. Schomer, Chair ASACOS Susan B. Blaeser, Standards Manager February 2015.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
Overview of NSF Standards Process and Joint Committee Formation Sustainable Water Contact Products Stakeholder Meeting October 30, 2012.
Harmonization and consistency in ISO/TC 211 standards by Serena Coetzee Chair, ISO/TC 211 Programme Maintenance Group at the Tutorial held on 5 December.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
The 16 th Session of WIPO Standing Committee of the Law of Patents Catherine Eunkyeong Lee APAA Patent Committee Meeting November 13, 2011, Manila.
Getting Involved in the Research Data Alliance Stefanie Kethers
International Committee Committee appointments Board relationship George W. Beeler, Jr.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Nanotechnology Standards Panel CONFERENCE ON U.S. LEADERSHIP IN ISO AND IEC ISO BREAKOUT SESSION REPORT Breakout Session Moderator: Mr. David Miller ANSI.
Interim Solution What it is and how to to use it 21 June 2012.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
1Technical Editing BPS/TC 67/Washington June International Organization for Standardization.
STATUS REPORT OF THE COMMON CENSUS FRAMEWORK FUNDED BY THE INTER-AMERICAN DEVELOPMENT BANK (IDB) AND THE UNITED NATIONS POPULATION FUNDS (UNFPA) Project.
PATIENT-CENTERED OUTCOMES RESEARCH INSTITUTE PCORI Board of Governors Meeting Washington, DC September 24, 2012 Anne Beal, MD, MPH, Chief Operating Officer.
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
Joint ITU-T and ISO/IEC JTC 1 Leadership Meeting Accessibility Alex Li ISO/IEC JTC 1 SWG-Accessibility Convenor 2011 San Diego.
The Revision of EN81-1 and EN81-2 ELA Information Day December 8 th, 2010 Brussels.
Doc.: IEEE /0xxr0 Submission January, 2001 Allen Heberling, Eastman Kodak CompanySlide 1 Project: IEEE P Working Group for Wireless Personal.
The partnership principle and the European Code of Conduct on Partnership.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
ISO Liaison Report Hidenori Shinoda Charles Parisot.
Doc.: IEEE COEX-01/014r0 Submission July 2001 Jim Lansford, Mobilian, Tim Blaney, CommceptsSlide 1 IEEE 802 Wireless Coexistence TAG Proposal Jim Lansford.
Moving To the Year 2000:Implementing 4010 Implementation Resolution Process Rich Emrich EDI Manager J.M. Schneider.
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Greater Essex County District School Board Regulation: School Councils Reference NO: R-AD-03 Principal Chris Mills.
# 1 THE ACOUSTICAL SOCIETY OF AMERICA STANDARDS PROGRAM Paul D. Schomer, Chair ASACOS & Susan Blaeser, Standards Manager Updated Nov
Doc.: IEEE r1 Submission May 12, 2002 Dr. John R. Barr, Motorola Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
January 2004doc.: IEEE /008r2 Clint Chaplin, Symbol TechnologiesSlide 1Submission Security Standing Committee Clint Chaplin, Symbol Technologies.
© UPU 2012 – All rights reserved Annual Work Plan of Committee 1 International Bureau Bern, 24 April 2013 (CA C – Doc 7)
Dr. Trevor Smith Chair ISO/TC 176 Quality Management & Quality Assurance Worldwide Quality Director Global Manufacturing & Logistics Eastman Kodak Company.
ANSI Accredited U.S. Technical Advisory Group (TAG) to ISO/TC 258 Project, Programme, Portfolio Management Call for Experts.
Doc.: IEEE Submission March, 2014 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Quality Management Systems Advice from ISO/TC 176 for Sector-specific applications.
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Add to Par 14: Guiding Principles All groups report to the Plenary. The new Policy Development Group is responsible for high level guidelines regarding.
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by David Q. McDowell Chair, USTAG ISO TC130 USTAGs and Joint Working Groups.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
Monitoring Forest Resources for SFM in the UNECE Region
A Liaison Report from ISO TC211 to CEOS WGISS Dr. Liping Di
A Liaison Report from ISO TC211 to CEOS WGISS-44
CDA PRESENTATION TO PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 2005/03/09 PROF RATAEMANE.
Updating the Regulation for the JINR Programme Advisory Committees
WP1 - Consortium coordination and management
Draft Terms of Reference and Rules of Procedure
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
EAC Web Portal hfkh EAC Web Portal By KIRENGA Jean Paul Administrator 9/20/2018.
Proposed Update to Motion Templates & Other Issues
TAB Report to Board 31 July 2013.
Standardization Management Board Decisions How They Affect Your TAG!
Greater Essex County District School Board
Draft Terms of Reference and Rules of Procedure
IEEE 802 2nd Vice Chair last name at ieee dot org
Mandate & Outputs expected for 2004
IEEE 802 Wireless Coexistence Study Group Thursday Meeting
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE 802 2nd Vice Chair last name at ieee dot org
Proposed PLCS TC Organization
Organisational September 15, Open Meeting, 14:00-15:30
Presentation transcript:

1 5 December 2010 Modèle TN Tutorial XML Maintenance Group ISO/TC Canberra 5 December 2010 DT.TN/10.222

2 Background Res. 474 – Ad hoc group on XMLRes. 474 – Ad hoc group on XML –Advises the committee on how XML should be handled in ISO/TC 211 –Shall report to the 29 th plenary Doc. 211n2787 – Report from the Ad Hoc group on XMLDoc. 211n2787 – Report from the Ad Hoc group on XML –establish a permanent XML Validation Group to: ensure that XML documents of ISO/TC 211 projects are accessible and are validensure that XML documents of ISO/TC 211 projects are accessible and are valid Investigate means and rules for publication of XML resources (validation tools, web sites, consistency of the TC211 XML, URLs, namespaces,…)Investigate means and rules for publication of XML resources (validation tools, web sites, consistency of the TC211 XML, URLs, namespaces,…) Investigate further the recommendations on XML proposed by the Ad hoc groupInvestigate further the recommendations on XML proposed by the Ad hoc group Res. 481 – Ad hoc group on XMLRes. 481 – Ad hoc group on XML –TC 211 thanks the ad hoc group and resolves to disband it 5 December 2010 DT.TN/10.222

3 Resolution 482 Establishment of an XML maintenance group 5 December 2010 DT.TN/ The XML Maintenance group: –shall ensure that the XML used in ISO/TC 211 projects is: maintained and,maintained and, made accessible.made accessible. –draft terms of reference for presentation at the 30th plenary

4 Status 5 December 2010 DT.TN/ Draft terms of reference have beenDraft terms of reference have been –Presented during last plenary –Submitted for comments to the members UK, CA and CA have given their support without commentsUK, CA and CA have given their support without comments Resolution to be taken during the Canberra plenaryResolution to be taken during the Canberra plenary

5 Terms of Refence XMG Membership (1/2) Ex officio membersEx officio members –ISO/TC 211 Chair –ISO/TC 211 Working group convenors –Chair or Editor of XML related Project Teams –Maintenance group convenors (TMG, PMG, HMMG,...) –Liaison Coordination group chairs (ISO/TC 211 / OGC Joint Advisory Group,...) Chair is appointed by the ISO/TC 211Chair is appointed by the ISO/TC 211 –Nicolas Lesage (Document 211n2875) –A co-chair may be nominated by the XMG nominated members (simple majority vote) 5 December 2010 DT.TN/10.222

6 Terms of reference XMG Membership (2/2) Nominated membersNominated members –Mr. Nicolas Lesage, France - –Mr. John Hockaday, Australia - –Dr. Jean Brodeur, Canada - –Mr. Claude Eisenhut, Switzerland - –Mr. Stefan Strobel, Germany - –Mr. James Rapaport, Royaume-Uni - –Mr. Joan Masó Pau, Spain - Additional members nominated by member bodyAdditional members nominated by member body –One rep per member body apart from chair and the ex officio members Invitation of technical experts to assist with technical advice on XML maintenance related mattersInvitation of technical experts to assist with technical advice on XML maintenance related matters –The XMG chair, in consultation with the XMG members 5 December 2010 DT.TN/10.222

7 Terms of reference Goal The XML Maintenance Group (XMG) shall ensure that the ISO/TC 211 XML is maintained and made accessible.The XML Maintenance Group (XMG) shall ensure that the ISO/TC 211 XML is maintained and made accessible. ISO/TC XML represents any XML documents or fragments under the responsibility of ISO/TC 211, including the XML:ISO/TC XML represents any XML documents or fragments under the responsibility of ISO/TC 211, including the XML: –From published standards and specifications, –From draft standards and specifications submitted for ballot, –Resulting from the application of these (draft) standard and specifications 5 December 2010 DT.TN/10.222

8 Terms of reference Responsibilities Establish and maintain the ISO/TC 211 XML policiesEstablish and maintain the ISO/TC 211 XML policies –It includes policies related to the management of namespaces or more generally XML related identifiers Coordinate the collection of the ISO/TC211 XMLCoordinate the collection of the ISO/TC211 XML –Ensure the appropriate coordination with ISO/TC 211 project teams and groups –Monitor the use of XML within ISO/TC 211 through contributions to ISO/TC 211 standardization effort activities and comments of the draft standards –Inventory validation tools and make available resources to check the validity of the XML used in ISO/TC 211 –Ensure the validation of the ISO/TC 211 XML. Maintain and make available the ISO/TC 211 XMLMaintain and make available the ISO/TC 211 XML –Establish and maintain a publicly available repository of the XML –Inventory of issues related to the use of the XML and coordinate the resolution of those issues Possibly address directly those issues having no impact on existing implementationsPossibly address directly those issues having no impact on existing implementations –Establish, maintain and make available guidelines, recommendations and education materiels on the use of the XML 5 December 2010 DT.TN/10.222

9 Amendment of ISO/TC 211 Internal Web Page Add an ISO/TC 211 XML ClauseAdd an ISO/TC 211 XML Clause –It is the responsibility of the leader/editor to make the XML available to the XMG for validation and further dissemination accordingly to ISO/TC 211 XML Policies. –The XML shall conform to the requirements expressed in ISO/TC 211 XML Policies. The purpose of this is to identify harmonization issues early so that they may be handled by the appropriate editing body (PT or EC). –According to XMG Terms of reference, the project leaders/editors are ex officio members of the XMG during the project period. 5 December 2010 DT.TN/10.222

10 Programme of work Define the requirements for the XML repositoryDefine the requirements for the XML repository Draft the ISO/TC 211 policiesDraft the ISO/TC 211 policies Draft guidelines, recommendations and education materialsDraft guidelines, recommendations and education materials Investigate validation tools and testing resourcesInvestigate validation tools and testing resources Initiate the collection of the XMLInitiate the collection of the XML Ensure the coordination with ISO/TC 211 committeesEnsure the coordination with ISO/TC 211 committees Progress to be reported at next plenary 5 December 2010 DT.TN/10.222

11 Thanks! Any questions?Any questions? 5 December 2010 DT.TN/10.222