Chapter 5 – Part 1 Solutions to SHW. 1.What do we mean by a process that is consistently on target? Amount of Toner LSL Target USL Process is consistently.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Chapter 9A Process Capability and Statistical Quality Control
Quality Management 09. lecture Statistical process control.
Chapter 6 - Part 1 Introduction to SPC.
Lecture 2 Describing Data II ©. Summarizing and Describing Data Frequency distribution and the shape of the distribution Frequency distribution and the.
Continuous Probability Distributions.  Experiments can lead to continuous responses i.e. values that do not have to be whole numbers. For example: height.
Leadership in Engineering
Chapter 9 Capability and Rolled Throughput Yield
Statistical Review for Chapters 3 and 4 ISE 327 Fall 2008 Slide 1 Continuous Probability Distributions Many continuous probability distributions, including:
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
1 Introduction to Estimation Chapter Introduction Statistical inference is the process by which we acquire information about populations from.
Chapter 6 Continuous Random Variables and Probability Distributions
Statistical Process Control (SPC)
Chapter 5 Discrete and Continuous Probability Distributions
BCOR 1020 Business Statistics
Chapter 5, Part 1 The TQM Philosophy. What is Quality?  What do we mean by quality?  Newer, more widely accepted definition of quality is the ability.
X-bar and R Control Charts
1 Process Capability Assessment. 2 Process Capability vs. Process Control u Evaluating Process Performance – Ability of process to produce parts that.
Chapter 6 – Part 4 Process Capability.
Statistical Process Control (SPC)
Objectives (BPS chapter 14)
Introduction to Statistical Inferences
Chapter 13 Statistics © 2008 Pearson Addison-Wesley. All rights reserved.
Modeling Process Capability Normal, Lognormal & Weibull Models
Statistical Process Control
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Using the Standard Normal Distribution to Solve SPC Problems
Copyright © 2012 by Nelson Education Limited. Chapter 4 The Normal Curve 4-1.
Copyright © Cengage Learning. All rights reserved. 6 Normal Probability Distributions.
Tolerance Limits Statistical Analysis & Specification
Statistics Measures Chapter 15 Sections
Statistics Numerical Representation of Data Part 2 – Measure of Variation.
1 Estimation From Sample Data Chapter 08. Chapter 8 - Learning Objectives Explain the difference between a point and an interval estimate. Construct and.
Statistical Process Control Chapter 6, Part 2 Specification Limits The target for a process is the ideal value –Example: if the amount of beverage in a.
Discrete Probability Distributions. Random Variable Random variable is a variable whose value is subject to variations due to chance. A random variable.
SECTION 12-3 Measures of Dispersion Slide
Inferential Statistics Part 1 Chapter 8 P
1 Six Sigma : Statistical View Dedy Sugiarto. 2 What is Variation? Less Variation = Higher Quality.
Statistical Process Control04/03/961 What is Variation? Less Variation = Higher Quality.
Statistical Quality Control
17-1 Quality Cost Management Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University.
The Normal Distribution Lecture 20 Section Fri, Oct 7, 2005.
Chap 5-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 5 Discrete and Continuous.
Copyright © 2015, 2011, 2008 Pearson Education, Inc. Chapter 6, Unit C, Slide 1 Putting Statistics to Work 6.
Process Capability Study (Cpk) Business Excellence DRAFT October 5, 2007 BE-TL3-002-DRAFT-Cpk.
Problem 21 Since the capability index is greater than 1, the process is capable.
Normal Distribution. Normal Distribution Curve A normal distribution curve is symmetrical, bell-shaped curve defined by the mean and standard deviation.
Chap 5-1 Discrete and Continuous Probability Distributions.
 2012 Pearson Education, Inc. Slide Chapter 12 Statistics.
Yandell – Econ 216 Chap 8-1 Chapter 8 Confidence Interval Estimation.
Overview Definition Measurements of process capability control
MSA / Gage Capability (GR&R)
Chapter 12 Statistics 2012 Pearson Education, Inc.
Behavioral Statistics
Chapter 7 Sampling Distributions.
What is the point of these sports?
Help for Chapter 5, SHW Problem 7
MEASURES OF CENTRAL TENDENCY
Higher National Certificate in Engineering
Step M2 – Variable Process Capability
DSQR Training Process Capability & Performance
Chapter 7 Sampling Distributions.
CONTINUOUS RANDOM VARIABLES AND THE NORMAL DISTRIBUTION
Chapter 7 Sampling Distributions.
THE NORMAL DISTRIBUTION
Statistical Process Control
Chapter 7 Sampling Distributions.
Chapter 12 Statistics.
Chapter 7 Sampling Distributions.
Chapter 6 Continuous Probability Distributions
Presentation transcript:

Chapter 5 – Part 1 Solutions to SHW

1.What do we mean by a process that is consistently on target? Amount of Toner LSL Target USL Process is consistently on target if the distribution is tightly clustered around the target, or, equivalently, if the variance around the target is small.

Amount of Toner 2. What do we mean by a process that is consistently on target? LSL USL TargetMean Process is consistently off target if the distribution is off target but tightly clustered—or has a small variance—around its mean.

3.What do we mean by a process that is haphazardly on target? USL Target LSL Process is haphazardly on target if the distribution is on target but exhibits a great deal of variation around The target.

4.Refer to Jane and Sam in the notes to Chapter 5, Part 1. Draw the distribution of two machines, one behaving like Jane and the other like Sam. Which machine is easier to fix? How would you fix it? Target Sam (Machine A) Jane (Machine B)

Problem 4 - Continued Easier to adjust mean to target than to reduce variance. Machine A: reduce variance Machine B: adjust mean to target

5.How does better quality increase productivity?  As quality improves, rework and scrap decrease  This results in fewer inputs being used to produce a units of output.  Also, more good units are produced the first time.  Since better quality means high output of good units and fewer inputs, productivity—output divided by inputs—increases.

Problem 6 a)Find the loss function LSL = 0.6 USL = 1.6 Target = (USL+ LSL)/2 =(1.6+.6)/2 = 1.1 USL = Target + a 1.6 = a a=0.5

Problem 6

b)If X = 1.3, c)If the company ships a brake pad with a thickness of 1.3 inches, the company will impose a loss of $1.92 on the customer. The loss is due to the thickness being 0.2 inches off target.

Problem 6 d)Expected loss The company imposes, on average, a loss of $36 on its customers from shipping off target units. (Note that some units will have a loss Greater than $36 but other units will a loss of less than $36. The average of the losses of all units shipped will be $36.)

Problem 7 Ashi Newspapers on April 17, 1979 reported that: Identical sets were assembled by Sony in a plant in Japan and in a plant in the U.S. with same design, and the same parts. U.S. customers preferred TV’s assembled in Japan to those assembled in U.S., because of better color. The U. S. plant performed 100% inspection. As a result, none of the sets assembled in U.S. were out of specs. However, Japan shipped all set “as is” without inspection.

Problem 7 The result was that % of sets assembled in Japan were out-of-spec, and thus defective. The color density (the quality characteristic of interest, X) of sets produced in Japan was normally distributed, while the color density of the sets produced in the U.S. had a uniform distribution. The specification limits are 10 and 20. The distributions at each plant are shown below.

Color Density Distribution y Problem 7 US-built sets: 100% within limit Japan-built sets:.3% out of limits

Problem 7

Solution to 7a –Tokyo  Defect rate =.003. Split between two tails beyond spec limits =.0015 in each tail. LSL USL

LSLUSL Use Appendix B, p. 652 to find z. Since the tail area above USL is.0015 and Appendix B gives the area between 0 and z, we Look up the area between 0 and z, which is = z = Table area =.4985 From Appendix B, the z value is z = 2.96 or 2.97, so split z to get See next slide.

z Table (Text, p. 652) z

Solution to 7a -Tokyo Use formula for z to solve for standard deviation:

Solution to 5a - Tokyo  Expected loss

Solution to 5a-Tokyo On average, each TV set shipped from the Tokyo plant imposes a loss $0.69 on the customer.

Solution to 5a – U.S. Plant

Solution to 5b Why is the expected loss less at the plant that is producing a higher percentage of out of spec sets—the Tokyo plant?

Solution to 5b E(Loss -Tokyo) =$.69 E(Loss - U.S.) =$2.00 The reason why the expected loss is less at the Tokyo plant than at the U.S. plant is because the variance is smaller at the Tokyo plant, so there is less variability around the target. The sets are therefore more consistently on target, even if 3 out of 1000 sets are out-of-spec.

Solution to 5b At the U.S. plant, all sets are in spec. but they are haphazardly on target. Since the U.S. distribution is uniform, the percentage of sets on target is the same as the percentage of set near either on of the spec. limits. This means that the customer is just as likely to get a set that is on target as one that it on the lower or upper spec. limit.

Solution to 5b Note that, although the U.S. plant is performing 100% inspection and is not producing any out-of-spec sets, it still has a higher expected loss. Why? The reason is that mass inspection will not reduce the expected loss because it does not reduce the variance of color density. To reduce variance, we must improve the process by, for example, using better parts and/or materials, better maintenance of tools and equipment, etc.