Reliability Engineering, Trade spaces, and Affordability Consideration of RMA in Systems Acquisition is Required by Law New Policies Have Been Created.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Audit Evidence Week 11.
CIS 376 Bruce R. Maxim UM-Dearborn
AHS, Home Living Geriatric Consult Team Action Plan: 6 Month Post FFLS Sustainability Plans for Falls Improvement.
What is a civilization?.
Formative assessment of the Engineering Design process
Reliability Presentation Test-Retest James Blackwood – AED 615 Fall Semester 2006.
Marketing: Return On Investment Updated: May 6, 2009.
Key National Indicators and Supreme Audit Institutions: U.S. and INTOSAI Perspectives Bernice Steinhardt Director, Strategic Issues U.S. Government Accountability.
Planning a measurement program What is a metrics plan? A metrics plan must describe the who, what, where, when, how, and why of metrics. It begins with.
James A. Herrick Chapter 2
Differences btwn mainteance and development Smaller configuration management units Understanding Impact analysis Smaller, more frequent decisions Show.
1 Program Performance and Evaluation: Policymaker Expectations 2009 International Education Programs Service Technical Assistance Workshop Eleanor Briscoe.
Intellectual Property Protocol and Assessment for Distance Learning Liz Johnson Project Manager Advanced Learning Technologies Board of Regents of the.
Minia Univresity Council for Education Affairs Meeting - July Higher Education Enhancement Project Fund (HEEPF) Improving Transportation Engineering.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management 1.
TACKLING POVERTY TOGETHER Youth Contributing to Poverty Reduction.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Asset Management January 15, 2013.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Thirteenth Lecture Hour 8:30 – 9:20 am, Sunday, September 16 Software Management Disciplines Process Automation (from Part III, Chapter 12 of Royce’ book)
Ohio Transportation Planning Conference July 16, 2014.
Change Management “Getting from where you are, to where you want to be”
CBM + Program Implementation
June 8 – 10, 2014 Demystifying Surety, the Product and its Value Joanne Brooks Vice President and Counsel The Surety and Fidelity Association of America.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
NDIA Software Committee Paul R. Croll, CSC Michael H. McLendon, OSD/DDR&E/SE NDIA Systems Engineering Division Meeting August 18, 2010.
Web: tel: +44 (0) IEB Asset Maintenance System.
Chapter 7 Auditing Internal Control over Financial Reporting McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved.
Which of the following is included in “Other Receivables”
IT Requirements Management Balancing Needs and Expectations.
Regulation and Sustainability A set of tasks and responses – varying by structure and stage Dennis Volk Programme Officer.
Work to Date Selected team and begun recruiting participants for stakeholder and technical advisory teams Charter Metrics Working with stakeholder team.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Cost Management.
AUDIT IN COMPUTERIZED ENVIRONMENT
Facilitator: Lois Fried, CPP October 9,  Sue Ballard  Michelle Clawson, CPP  Becky Hershberger  Julius Soriano.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 7-1 Chapter Seven Auditing Internal Control over Financial Reporting.
Credit, Credit Cards, Scores and Compound Interest Today, you will need: Spirals, writing utensils, brains. Please, and thank you.
PMI is a registered trademark of the Project Management Institute Knowledge Exchange Forum October 28, 2003 Assessing Project Management in Your Organization.
McGraw-Hill/Irwin © 2013 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 5 Information Systems Concepts.
1 Generally Accepted Accounting Principles (GAAP) Guidance FAS 5 - Accounting for Contingencies (1973) (as amended) FAS 5 - Accounting for Contingencies.
Advancing Innovation in Measuring Patient Advocacy Outcomes.
Life Cycle Costing By Rajat Shuvro Bakshi Formerly Professor of Strategic Management and International Business Indian Institute of Foreign Trade, Management.
Continuous Monitoring and Gaining External Audit Reliance.
Group F: Economic Consequences of Invasive Species Q1: Critical Scientific Issues Quantifying and verifying non-market impacts and their value Costs of.
1 Measuring Impact Guide This guide is an introduction to assessing the impact and spending effectiveness of your district’s initiatives and the resources.
THE PASSENGERS’ PERSPECTIVE IN PUBLIC TRANSPORT - WHAT ARE THE REAL NEEDS ? - THE PASSENGERS’ PERSPECTIVE IN PUBLIC TRANSPORT - WHAT ARE THE REAL NEEDS.
Exhibiting? In 21st century?
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
DAG Chapter 4 Systems Engineering Design Considerations
Paraguay 2018 #FiscalTransparency Rafael Palau General Director
Terminal Learning Objectives
AHS, Home Living Geriatric Consult Team
DT249/4 Information Systems Engineering Lecture 0
Finding Secondary Sources
Life Cycle Cost Analysis
Step up to a new model – Trade-In Evaluator
Adjustments required for program or funding changes Options
USEPA Visit July 15, 2009 William F. Hunt, Jr..
Product Support Strategy
Reproductive Health and Safety Education: Making It Stick in NC
إدارة وتنمية مصادر المعلومات
Workshop Summary Innovations in Local Revenue Mobilization
The plan Our goals come together into a strong focus on both measuring and enabling performance. Improve programs Highlight successes Remove low performance.
What We Do, Where We’re Going Data-wize
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Industrial Base Analysis and Sustainment (IBAS) Program Overview
Principles Of Management-II
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Evaluation and assessment
Presentation transcript:

Reliability Engineering, Trade spaces, and Affordability Consideration of RMA in Systems Acquisition is Required by Law New Policies Have Been Created Investment in RMA Pays Off Reliability Best Practices Have Been Established Methods for Calculating Operation and Sustainment Costs Have Been Created Tools for Reliability Analysis, Evaluation, and Tracking Exist –And advanced tools are being developed So What’s the Problem? 1

Example of Improving Affordability and Performance through Reliability-Related Tradeoff Studies 2

Research Needs Valuation techniques to link between RMA engineering to affordability – Methods of measurement and accounting of operational suitability, effectiveness, and sustainment engineering for acquisition managers – Is the link really as strong as congress, the GAO, and RMA advocates believe? Methods to assess the RMA-related KPPs and KSAs during development – Metrics – Models Methods to identify operations and sustainment costs – Access and analysis of operations and maintenance databases – Methods to improve data recording and collection 3