15-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

Slides:



Advertisements
Similar presentations
Budgeting and Variances
Advertisements

CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Using Budgets for Planning and Coordination
15-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Quality Costs and Productivity: Measurement, Reporting, and Control 15 PowerPresentation®
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Chapter 5. Merchandisers Cost of Goods Sold Manufacturers Direct Material, Direct Labor, and Variable Manufacturing Overhead Merchandisers and Manufacturers.
Slide # 1 STANDARD COSTING & VARIANCE ANALYSIS KHALID AZIZ FRESH CLASSES MA-ECONOMICS 15 TH FEBRUARY 2010.
Managerial Economics and Organizational Architecture, 5e Chapter 17: Divisional Performance Evaluation McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
© John Wiley & Sons, 2005 Chapter 11: Standard Costs and Variance Analysis Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Chapter 11: Standard Costs.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
How do you choose the right combination of inputs?
Prepared by Debby Bloom-Hill CMA, CFM. Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
1 Productivity Measurement Operations Management.
Analyzing Cost, Volume, and Pricing to Increase Profitability Chapter 3.
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
Management Accounting Breakeven Analysis. Breakeven Analysis Defined  Breakeven analysis examines the short run relationship between changes in volume.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
Budgets and Variances continued: Production variances.
Chapter 12 – Standard Costs: Direct Labor and Materials
C H A P T E R 2 Analyzing Cost-Volume- Profit Relationships Analyzing Cost-Volume- Profit Relationships.
Chapter 41 Cash, Short-term Investments and Accounts Receivable Chapter 4.
Chapter 17 – Additional Topics in Variance Analysis
Managerial Accounting: An Introduction To Concepts, Methods, And Uses Chapter 11 Profit Center Performance Evaluation Maher, Stickney and Weil.
1 Profit and Cost Center Performance Evaluation CHAPTER 10 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in.
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Chapter 23 Flexible Budgets and Standard Cost Systems
Material variances 1) Material cost variance 2) Material price variance 3) Material usage or quantity variance 4) Material mix variance 5) Material mix.
Chapter 21 Flexible Budgets and Standard Costing.
The Cost-Minimizing Input Combinations. 1. Alternative Input Combinations ▫Substitutes and Complements in Factor Markets  Review of Substitutes and Complements.
12-1 CHAPTER 12 Managerial Accounting and Cost — Volume — Profit Relationships McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Productivity Improve Productivity, Reduce Costs, Improve Profits.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
18-1 Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University Productivity Measurement and Control.
 Productivity  Economic growth and productivity  Main processes of a company  Productivity model  Illustration of the real income distribution processes.
Productivity Analysis Productivity : A measure of the effective use of resources, usually expressed as the ratio of output to input. Productivity= Output/Input.
Lean Accounting and Productivity Measurement
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 9 Standard Costing: A Functional-Based Control Approach
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
Cost Management ACCOUNTING AND CONTROL
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Chapter 23 Flexible Budgets and Standard Cost Systems.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
MANUFACTURING FIRMS USE STANDARD COSTS AND STANDARD QUANTITIES TO BUDGET FOR AND ANALYZE PRODUCTION Standard Cost Variance Analysis.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Cost-Volume-Profit Analysis
Chapter 6 Financial Strategy.
Chapter 17 Appendix DERIVED DEMAND.
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Foundations and Evolutions
Master Budget Chapter 06 Chapter 8: Profit Planning
Marginal costing and short term decision making
AMIS 310 Foundations of Accounting
Budgeting for Planning and Control
Management Accounting
Chapter 6 The Master Budget and Responsibility accounting
Presentation transcript:

15-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL

15-2 Productivity Measurement and Control 15

15-3 Productive Efficiency 1 Productivity is concerned with producing output efficiently, and it specifically addresses the relationship of output and the inputs used to produce the outputs.

15-4 Total productive efficiency is the point at which two conditions are satisfied: (1)For any mix of inputs that will produce a given output, no more of any one input is used than necessary to produce the output. (2)Given the mixes that satisfy the first condition, the least costly mix is chosen. Productive Efficiency 1

15-5 Technical Efficiency is the condition where no more of any one input is used than necessary to produce a given output. Technical efficiency improvement is when less inputs are used to produce the same output or more output are produced using the same input. Productive Efficiency 1

15-6 Productive Efficiency 1

15-7 Productive Efficiency 1

15-8 Productive Efficiency 1

15-9 Productive Efficiency 1

15-10 Productive Efficiency 1 Of the two combinations that produce the same output, the least costly combination would be chosen.

15-11 Productive measurement— is a quantitative assessment of productivity changes can be actual or prospective is forward looking serves as input for strategic decision making allows managers to compare relative benefits of different input combinations Partial Productivity Measurement 2

15-12   Partial Productivity Measure: Measuring productivity for one input at a time.   Productivity ratio = Output/Input   Operational Productivity Measure: Partial measure where both input and output are expressed in physical terms.   Financial Productivity Measure: Partial measure where both input and output are expressed in dollars. Partial Productivity Measurement 2

Number of frames produced240,000250,000 Labor hours used60,00050,000 Materials used (lbs.)1,200,0001,150,000 Productivity Measurement: Profile Analysis, No Trade-Offs 250,000/50, ,000/1,150, ,000/60, ,000/1,200,000 Total Productivity Measurement 3

Number of frames produced240,000250,000 Labor hours used60,00050,000 Materials used (lbs.)1,200,0001,150,000 Productivity Measurement: Profile Analysis with Trade-Offs 250,000/50, ,000/1,300,000 Total Productivity Measurement 3

15-15 Profit-Linkage Rule: For the current period, calculate the cost of the inputs that would have been used in the absence of any productivity change, and compare this cost with the cost of the inputs actually used. The difference in costs is the amount by which profits changed because of productivity changes. To compute the inputs that would have been used (PQ), use the following formula: PQ = Current-period Output/Base-period productivity ratio Total Productivity Measurement 3

15-16 Number of frames produced240,000250,000 Labor hours used60,00050,000 Materials used (lbs.)1,200,0001,300,000 Unit selling price (frames)$30$30 Wages per labor hour$15$15 Cost per pound of material$3$ Total Productivity Measurement 3

15-17 PQ (labor) = 250,000/4 = 62,500 hrs. PQ (materials) = 250,000/0.200 = 1,250,000 lbs. Cost of labor: (62,500 x $15) =$ 937,500 Cost of materials: (1,250,000 x $3.50) = 4,375,000 Total PQ cost$5,312,500 Cost of labor: (50,000 x $15) =$ 750,000 Cost of materials: (1,300,000 x $3.50) = 4,550,000 Total current cost$5,300,000 The actual cost of inputs: Total Productivity Measurement 3

15-18 Profit-linked effect= Total PQ cost – Total current cost = $5,312,500 – $5,300,000 = $12,500 increase in profits The net effect of the process change was favorable. Profits increased $12,500 because of productivity changes. Total Productivity Measurement 3

15-19 Total Productivity Measurement 3 Profit-Linked Productivity Measurement 250,000/4 250,000/0.200

15-20 Output and Input MeasuresOutput/InputProfile and Profit-Linked Analyses 4 Measuring Changes in Activity and Process Efficiency Activity Productivity Model

15-21 Number of purchase orders200,000240,000 Material used (lbs.)50,00050,000 Labor used (number of workers)4030 Cost per pound of material$1$0.80 Cost (salary) per worker$30,000$33, Measuring Changes in Activity and Process Efficiency

15-22 Activity Productivity Analysis Illustrated 4 Measuring Changes in Activity and Process Efficiency *Materials: 240,000/4; Labor: 240,000/5,000.

15-23 Output and Input MeasuresOutput/InputProfile and Profit-Linked Analyses 4 Measuring Changes in Activity and Process Efficiency Process Productivity: Activity Output Efficiency

Measuring Changes in Activity and Process Efficiency Productivity Data: Sales Process, Carthage Company Continued

Measuring Changes in Activity and Process Efficiency Productivity Data: Sales Process, Carthage Company

Measuring Changes in Activity and Process Efficiency Resource Efficiency Component (Activity Productivity) A. Making Sales Calls Continued

Measuring Changes in Activity and Process Efficiency Resource Efficiency Component (Activity Productivity) B. Handling Objections

Measuring Changes in Activity and Process Efficiency Activity Output Efficiency and Total Process Productivity A. Activity Output Efficiency Continued a 20,000/50,000; 25,000/40,000. b 20,000/25,000; 25,000/10,000.

Measuring Changes in Activity and Process Efficiency Activity Output Efficiency and Total Process Productivity A. Activity Output Efficiency Continued *25,000/0.4; 25,000/0.8. Note: P is the activity rate for 2007.

Measuring Changes in Activity and Process Efficiency Activity Output Efficiency and Total Process Productivity B. Total Process Productivity

15-31 Improving quality may improve productivity. If rework is reduced by producing fewer defective units, then less labor and few materials are used to produce the same output. Reducing the number of defective units improves quality; reducing the amount of inputs used to improve productivity. 4 Measuring Changes in Activity and Process Efficiency

15-32 End of Chapter 15