Objectives Discus final project Load calculation.

Slides:



Advertisements
Similar presentations
Chapter 3. HVAC Delivery Systems
Advertisements

Trane Voyager™ rooftop units
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Objectives Finish with ducts and fans Define project topics.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Objectives Discuss Project Topics Learn to design VAV and DOAS System.
Lecture Objectives: Learn about automatic control Use life-cycle cost analysis integrated in eQUEST.
Objectives Select project topics Review for exam Learn about DOAS systems.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
N O R T H A M E R I C A C O M M E R C I A L TDP
Course project presentation Thursday in class Timing: 4 minutes (strictly controlled) Approximately 1 PowerPoint Slides per minute Content Problem Introduction.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Objectives More HVAC systems - Sorption (absorption) chillers
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Final Project Presentation On Monday, same classroom at noon PowerPoint (5 minutes presentation) Upload the file before the class Approximately 6-7 slides.
Energy Plus & Open Studio Class
Objectives Finish DOAS Control Terminology Types of controllers
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Lecture Objectives: Learn about processes in AHU Swimming pool example Het recovery systems.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Define the final project Deliverables and Grading policy Analyze factors that influence accuracy of our modeling study Learn about.
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
Reminder about the Filed Trip Tomorrow 8 am St. Edward's University We will meet at 8:00 am at the south entrance of the new Science building (visitor.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
A New (Rational) Way To Condition Air (and Save Energy) AEE, Philadelphia February 18 th 2016 Andrew Mongar, President, AirGreen LLC.
Field Trip Time: Tomorrow (Tuesday) 8 am Duration 1 hour (you will be back latest at 10 am) Location Texas State University: Round Rock
Announcements Next class is the course evaluation
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Discuss Final Project
Lecture Objectives: Discuss HW4, answer your questions
We need to decide about the time for the final project presentation
Announcements End of the class – course evaluation
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Answer questions related to HW 4
Announcement No project presentations !
Lecture Objectives: Finish HW3 Discussion
Lecture Objectives: Finish with HVAC systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
Announcement Field trips: Thursday 8 am on UT Campus (NMS building)
Project.
Objectives Continue with advance HVAC systems
Objectives Further discuss the Exam problems
Lecture Objectives: Show an example of dual wheel system
Lecture Objectives: Discuss heat recovery systems
Objectives Finish duct systems Learn about plumbing systems
Announcement: HW2 will be ed to you later this week
Objectives Learn about 1) Control for HVAC systems
Lecture Objectives: Discuss HW3 Learn about Heat recovery
(Today is the first one)
Lecture Objectives: Finish swimming pool example
Lecture Objectives: Discuss HW4 parts
Lecture Objectives: Discuss Projects 1 and 2
Announcement No project presentations !
Objectives Finish with Heat exchangers
Announcements Exam 1 Next Class (Thursday, March 14th):
Objectives Review exam problems Further discuss final projects
Objective Revie the Cooling Cycle Learn about air distribution systems
Objectives Discuss Rotary Heat Exchangers
Presentation schedule
Presentation transcript:

Objectives Discus final project Load calculation

Final Project Group 1: Heather Smith Tommy Beales Matt Leos Group 2: Patrick Gorman Kenny Greaves Matt McCarthy Group 3: Sarah Johnson Jocelyn Citty Tobias Nilsson Group 4: Zaid Arzate Brian Burcham Justin Barrett Group 5: Nick Williams Stephen Mathai Kevin Carbonnier Group 6: Marcus Allen Josh Atkins Matt Larson Group 7: Stephen Fridley Shahrukh Gaziani Margaret Lawson Group 8: Marwa Zaatari Megan Gunther Elena Nirlo Group 9: Gregory Arcangeli Andrew Hoisington Adam Keeling Individual projects Neil Woodson Wesley Cole Sami Kolahdoozan Gautam Salhotra

Project topics 1) VAV system design Fresh air requirements and recirculation rate calculation Selection of zonal and central HVAC components based on cooling and heating load components For zones: VAV boxes, reheaters, reheater plumbing For whole system: AHU and components, chiller & cooling tower, boiler, and electric power requirement Control description – sequence of operation Heat recovery system and or economizers 2) DOAS system design Fresh air requirement and split between air and hydronic loads (sensible and latent cooling loads) Selection of zonal and central HVAC components based on cooling and heating load components For zones: fan coils and plumbing For whole system: AHU and components, chiller & cooling tower, boiler, and electric power requirement Control description – sequence of operation Heat recovery system and or economizers

Project topics 3) Cooling systems and distribution Air cooled condenser vs. water cooled condenser (energy performance analysis) Design of plumbing systems for campus and pumping stations Control of centralized system Saving with variable speed pumps 4) Duct Design (in Revit) - Diffuser selection, design of local and central duct system components - Spacing issues and difference between round and square ducts - Difference between manual calculation and calculation by Revit (for a section of the duct system) - Balancing and fan selection - Life cycle analysis and optimization (fan power consumption vs. system cost)

DOAS with multi-split systems Fresh air?

DOAS fresh air configurations

Cooling and Heating Loads (For Project) » Zone orientation Commercial building

Cooling and Heating Loads (For Project) » Cooling and heating load for each zone and whole building: » Fresh air requirement based on number of occupants: » To provide acceptable IAQ in the building, ventilation » system supply minimal amount of » fresh air is in all spaces (except plenums) » that produce 0.2 ACH.

Cooling Load Calculation Mostly computer based Handouts for manual calculation

Heat Recovery Sensible and Enthalpy wheel

Economizer Economizer (fresh air volume flow rate control) » mixing » damper » fresh » air » T & RH sensors » recirc. » air » Controlled device is damper » - Damper for the air » - Valve for the liquids

Economizer – cooling regime How to control the fresh air volume flow rate? » % fresh air » Minimum for » ventilation » 100% » If TOA < Tset-point → Supply more fresh air than the minimum required » The question is how much? » Open the damper for the fresh air » and compare the Troom with the Tset-point. » Open till you get the Troom = Tset-point » If you have 100% fresh air and your » still need cooling use cooling coil. » What are the priorities: » - Control the dampers and then the cooling coils or » - Control the valves of cooling coil and then the dampers ? » Defend by SEQUENCE OF OERATION » the set of operation which HVAC designer provides to the automatic control engineer

Economizer – cooling regime » Example of SEQUENCE OF OERATIONS: » If TOA < Tset-point open the fresh air damper the maximum position » Then, if Tindoor air < Tset-point start closing the cooling coil valve » If cooling coil valve is closed and T indoor air < Tset-point start closing the damper » till you get T indoor air = T set-point » » Other variations are possible

Desiccant wheel » Figure 3 – A desiccant-based cooling system combined with regenerative heat exchanger, vapor compression cooling, and evaporative humidifier (hybrid system).