Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Here’s a partial schematic we’ll use to illustrate the advantage of a ground plane. The idea is that an output pin on the microprocessor is driving an.
DAQ Calibration for Heat Exchanger Calibration of Cold/Hot Flow Rate and Temperature UTC ENCH/ENEV /25/03 Greg Kirton Kevin Zitzow Phuong Mai.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
CMS Pixel Mechanical FPIX Half Disk Design Updates C. M. Lei Joe Howell Kirk Arndt Simon Kwan November 8, 2011.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
K. Arndt - PurdueTracker Upgrade Workshop - Nov FPIX Mechanical Design & Module Development Alternative layouts of pixel modules on disks to spur.
Phase 1 FPIX mechanics status Phase 1 Pixel Upgrade Workshop - Aug2012 Plenary IV Session1 Kirk Arndt Purdue University for CMS FPIX Mechanical Group S.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Arndt & Shipsey - PurduePixel Upgrade Discussion 9-Oct FPIX Material Reduction & Module Development A few alternative layouts of modules on disks.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
K. Arndt - PurdueTracker Upgrade Workshop - June 3, Phase 1 FPix Mechanics Plans for module assembly Phase 1 design objectives: 1.Reduce # of module.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
What do we use to measure the angle? PROTRACTOR Angles, Measuring Angles The unit of measurement of an angle is degrees. We measure angles in degrees.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Stave 130 Envelope Peter Sutcliffe Strip Mechanics 20 th February Lancaster.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
FPIX Upgrade – Status of CO 2 Cooling Studies S.Grünendahl, FNAL for the FPIX Upgrade Mechanical Group H. Cheung, G. Derylo, S.G., S. Kwan, C.M. Lei, E.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
LARP Phase II Secondary Collimator RC1
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Pixel cooling specifications
Installation step 4. (3 days)
Integration issues at IHEP
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
First of all we will remind some numbers:
Hall C Down Stream Beam Pipe And Dump Interface Design
Attribute Blocks Ring.
Compressor Cabinet Design & Interface Diane Hascall Integration Engineer Joint Technical Meeting 2017 March 6, 2017.
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
LARP Rotatable Collimators for LHC Phase II Collimation
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Atomic Structure An atom is the smallest unit of matter
Presentation transcript:

Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012

HD1 (1.435mm ID) ST SupplyDC-DCSTPCSTO-OO-II-II-OST Return Flow Path1->22->33->44->55->66->77->88->99->1010->11 Qt [W] d [m] lt[m] t [m] kw [W/m.°C]16 2Kirk Arndt - Purdue24 April 2012

3 9 coupling joints total - 3 for outer rings accessed from inside the service cylinder - 6 for independent installation/ removal of inner rings accessed from outside the service cylinder Cooling Tube Coupling Baseline Cooling Tube Layout for 3 identical Half Disks 25 April 2012Phase 1 Pixel Project Review

3.0mm OD return lines from the half-disks 2.2mm OD supply tubes to the half-disks Kirk Arndt - Purdue424 April 2012 Alternative Cooling Tube Layout for 3 identical Half Disks All 9 coupling joints accessed from outside the service cylinder

3.0mm OD return tube from the 1 st half-disk 2.2mm OD supply tube to the 1 st half-disk Kirk Arndt - Purdue524 April 2012

Kirk Arndt - Purdue624 April 2012

Kirk Arndt - Purdue724 April 2012

Addition to the openings in the service cylinder shell to let the couplers through during installation of Outer Blade Assemblies opening for 1 st half- disk couplers opening for 2nd half- disk couplers Kirk Arndt - Purdue824 April 2012

opening for 3rd half- disk coupler is blocked by forward end of double-walled section of service cylinder Kirk Arndt - Purdue924 April 2012

Sequence of translations and rotations to install 3 rd outer blade assembly into service cylinder with small opening for couplers Kirk Arndt - Purdue1024 April 2012

Kirk Arndt - Purdue1124 April 2012

Kirk Arndt - Purdue1224 April 2012

Kirk Arndt - Purdue1324 April 2012

Openings in forward/thin section of the service cylinder provides clearance to rotate all couplers when making plumbing connections Kirk Arndt - Purdue1424 April 2012

Kirk Arndt - Purdue15 Alternative: all supply and return tubes 1.435mm ID forward of port cards

24 April 2012Kirk Arndt - Purdue16

24 April 2012Kirk Arndt - Purdue17

24 April 2012Kirk Arndt - Purdue18 Diameter(mm)Area (m2)Length(m)Power ID support tube DC-DC support tube Port-cards support tube O-O cooling loop O-I cooling loop I-I cooling loop I-O cooling loop support tube return support tube return Input for new calculation of baseline layout with all supply and return tubes 1.435mm ID forward of port cards

24 April 2012Kirk Arndt - Purdue19 Cooling tube routing through port card mount rings (all 1.435mm ID / 1.635mm OD tubes) Forward direction

Schematic routing for HD1 supply tube (blue) through DC-DC converters and port card mount ring and return tube (yellow) through HC