Development of a 3.2 Gpixel Camera for the Large Synoptic Survey Telescope (LSST) 15-19 Sept-'081TWEPP 2008 Naxos, Greece John Oliver LSST Camera Electronics.

Slides:



Advertisements
Similar presentations
Flex Circuit Design for CCD Application ECEN 5004 Jon Mah.
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Results of Acceptance Tests of Hyper Suprime-Cam CCDs Yukiko Kamata, Hidehiko Nakaya, Satoshi Miyazaki National Astronomical Observatory of Japan.
(1) - Camera Electronics - Status and Update on changes since Aug July 07 John Oliver and the Camera Electronics team.
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
SECCI/COR2 Status Report SECCHI CONSORTIUM MEETING D. Socker, S. Plunkett, A. Vourlidas.
1 LSST: Dark Energy Tony Tyson Director, LSST Project University of California, Davis Tony Tyson Director, LSST Project University of California, Davis.
Barry E. Burke Title Slide.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
May stars be the actors and dark energy direct shoot a movie in the sky Chihway Chang Oct.8 ‘2008.
1 Large Synoptic Survey Telescope Review Kirk Gilmore - SLAC DOE Review June 15, 2005.
Radio Telescopes. Jansky’s Telescope Karl Jansky built a radio antenna in –Polarized array –Study lightning noise Detected noise that shifted 4.
April 23, 2008 Astro 890 Detectors Wide, High, Deep, and Sensitive.
CCD testing Enver Alagoz 12 April CCD testing goals CCD testing is to learn how to – do dark noise characterization – do gain measurements – determine.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
Overview of Scientific Imaging using CCD Arrays Jaal Ghandhi Mechanical Engineering Univ. of Wisconsin-Madison.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Raft Electronics Overview R. Van Berg Electronics Mini-Review.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Monitoring and Configuration R. Van Berg Electronics.
CCD Clocking and Biasing CABAC_0 : Design Test_0 : Design Pierre Antilogus (from a Hervé Lebbolo’s talk) BNL, Raft Electronic Workshop January 25 th 2012.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
Overview – LSST Camera, sensors, science raft subsystem P. O’Connor BNL Jan. 25, 2012.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 K. Gilmore - SDW The Large Synoptic Survey Telescope (LSST) Status Summary Kirk Gilmore SLAC/KIPAC.
Science Impact of Sensor Effects or How well do we need to understand our CCDs? Tony Tyson.
The Large Synoptic Survey Telescope Philip A. Pinto Steward Observatory University of Arizona for the LSST Collaboration Legacy Projects Workshop 17 May,
1 New Frontiers with LSST: leveraging world facilities Tony Tyson Director, LSST Project University of California, Davis Science with the 8-10 m telescopes.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Measurement Results Detector concept works! Flood fields show MCP fixed pattern noise that divides out Spatial resolution consistent with theory (Nyqvist.
Position sensing in Adaptive Optics Christopher Saunter Durham University Centre for Advanced Instrumentation Durham Smart Imaging.
Development of CCDs and Relevant Electronics for the X-ray CCD camera of the MAXI Experiment onboard the International Space Station Osaka University E.
CCD Detectors CCD=“charge coupled device” Readout method:
Dark Energy Probes with DES (focus on cosmology) Seokcheon Lee (KIAS) Feb Section : Survey Science III.
10/26/20151 Observational Astrophysics I Astronomical detectors Kitchin pp
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
1 System wide optimization for dark energy science: DESC-LSST collaborations Tony Tyson LSST Dark Energy Science Collaboration meeting June 12-13, 2012.
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
LSST Studies Large Synoptic Survey Telescope DOE HEP Program Review April 18, 2006 Brookhaven National Laboratory Morgan May.
The Dark Energy Survey The Big Questions The Discovery of Dark Energy
Calibration of the LSST Camera Andy Scacco. LSST Basics Ground based 8.4m triple mirror design Mountaintop in N. Chile Wide 3.5 degree field survey telescope.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
Observational Astrophysics I
J. Crooks STFC Rutherford Appleton Laboratory
Units to cover 25, Types of Spectra Kirchoff ’ s Laws: –If the source emits light that is continuous, and all colors are present, we say that this.
1 Optical observations of asteroids – and the same for space debris… Dr. D. Koschny European Space Agency Chair of Astronautics, TU Munich Stardust school.
Precision Studies of Dark Energy with the Large Synoptic Survey Telescope David L. Burke SLAC for the LSST Collaboration Rencontres de Moriond Contents.
LSST and Dark Energy Dark Energy - STScI May 7, 2008 Tony Tyson, UC Davis Outline: 1.LSST Project 2.Dark Energy Measurements 3.Controlling Systematic Errors.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
The Large Synoptic Survey Telescope and Precision Studies of Cosmology David L. Burke SLAC C2CR07 Granlibakken, California February 26, 2007 Brookhaven.
System Performance Metrics and Current Performance Status George Angeli.
LSST Photometric Calibration D. Burke SLAC/KIPAC DOE SLAC Program Review June 6-7, 2006.
14-Oct-20081Camera Review - SLAC Camera Electronics - John Oliver - Contributors to Camera Electronics conceptual design BNL – Veljko Radeka,
Brenna Flaugher for the DES Collaboration; DPF Meeting August 27, 2004 Riverside,CA Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 Dark Energy and.
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
Astronomical Spectroscopic Techniques. Contents 1.Optics (1): Stops, Pupils, Field Optics and Cameras 2.Basic Electromagnetics –Math –Maxwell's equations.
LSST Sensor Requirements and Characterization of prototype LSST CCDs V. Radeka, J. Frank, J.C. Geary, D.K. Gilmore, I. Kotov, P. O’Connor, P. Takacs, J.A.
Noise Characterization of the SIDECAR ASIC Readout Chip for SNAP Martin Diaz Stanford Linear Accelerator Center August 14, 2008.
Gina Moraila University of Arizona April 21, 2012.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
CCD Calibrations Eliminating noise and other sources of error.
4x8 Mosaic Camera Development
Charge Transfer Efficiency of Charge Coupled Device
LSST Camera Readout chip
SLAC Program Review June 7, 2006 Kirk Gilmore Stanford/SLAC/KIPAC
LSST Camera Detector Status
Presentation transcript:

Development of a 3.2 Gpixel Camera for the Large Synoptic Survey Telescope (LSST) Sept-'081TWEPP 2008 Naxos, Greece John Oliver LSST Camera Electronics Project Manager For the LSST Camera Electronics Team 15-Sept-2008

15-19 Sept-'08TWEPP 2008 Naxos, Greece2 Overview Major science drivers Critical specifications Telescope Camera  Sensors  Readout electronics

15-19 Sept-'08TWEPP 2008 Naxos, Greece3 Major Science Drivers “Synoptic survey” : Comprehensive & multipurpose Survey entire visible sky (20,000 deg 2 ) in five filter bands (400 nm – 1,000 nm) every 3 nights Dark matter survey  Weak gravitational lensing Dark energy probe  Type 1a supernovae discovery > 10 3 /night Galactic structure Near Earth Objects & Potentially Hazardous Asteroids Transient phenomena

15-19 Sept-'08TWEPP 2008 Naxos, Greece4 Dark Matter Survey - Weak lensing- Apparent rotation of elipticities of faint galaxies  Cosmic Shear T. Tyson

15-19 Sept-'08TWEPP 2008 Naxos, Greece5 Dark Matter Survey - Weak lensing - Strongly lensed galaxy - Weak lensing - Measurements of elipticity correlations of large numbers of faint galaxies  “cosmic shear” Tomographic reconstruction of dark matter density from shear data T. Tyson

15-19 Sept-'08TWEPP 2008 Naxos, Greece6 Dark Energy Measurement - Type 1A Supernovae - High statistics measurements of Type 1A SN  > 10 3 per observing night Redshift & distance measurement Fixed luminosity (standard candle)  distance Photometric redshift measurements in five filter bands to Z = 1.2 Deviations from linearity  Acceleration  Dark Energy  Cosmological constant Deviations from linearity  Acceleration  Dark Energy  Cosmological constant

15-19 Sept-'08TWEPP 2008 Naxos, Greece7 - Transient phenomena - A. Becker, U. Washington (SDSS) Differential images of SN 1987A

15-19 Sept-'08TWEPP 2008 Naxos, Greece8 Critical Specifications - Telescope - Survey telescope figure of merit “Etendue” {(Dia) 2 x (FoV solid angle) } Large aperture ~ 8.4 m, (6.7 m equivalent clear aperture) Large FoV ~ 3.5 deg Large focal plane ~ 64 cm diameter LSST Etendue ~ 320 (deg 2 )(m 2 ) High “throughput”

15-19 Sept-'08TWEPP 2008 Naxos, Greece9 Optics 8.4 m primary/tertiary 6.7 m effective aperture Active optics [*] fl~10 m  f1.2 beam 8.4 m primary/tertiary 6.7 m effective aperture Active optics [*] fl~10 m  f1.2 beam Convex secondary Location of camera Corrector lenses to form flat image plane Corrector lenses to form flat image plane [*] Corrects gravitational sag due to mirror inclination

15-19 Sept-'08TWEPP 2008 Naxos, Greece10 Lid is lifted from the primary/tertiary mirror blank 23-July-08 Made possible by grant from Bill Gates, Charles Simonyi – Microsoft Corp. Spin casting at the Steward Mirror Lab U. Arizona

15-19 Sept-'08TWEPP 2008 Naxos, Greece11 Critical Specifications - Camera & Sensors- Image sensors  Large focal plane  ~ 64 cm dia  ~ 200x 16-Mpixel CCD image sensors, 10  pixels (0.2”)  3.2 Gpixels  Back side illuminated  Small “Point spread function” – PSF (minimum spot size) < 7.5  max)  Low f-number = 1.2    must be flat to 10  peak-valley) across focal plane  High quantum efficiency 400 nm – 1,000 nm (40%, 80%, 40%)  Low leakage < ~ 1 e/s per pixel  T~ -100 C  High “full well” capacity ~ 100,000 e/pixel Back-to-back 15 second exposures on each piece of sky  Cosmic ray rejection 2 second readout  low dead time, high throughput Sky shot noise limited images  CCD read noise ~ 5 e rms Focal plane contained in a contamination free evacuated cryostat to prevent fogging of sensor surfaces Note: Last three requirements highly constrain the readout topology

15-19 Sept-'08TWEPP 2008 Naxos, Greece12 Critical Specifications - Implications for readout & sensors - Typical sensitivity S = 5  V/e  Cg ~ 32 ff Dominant noise source  “kTC noise” kTC noise easily removed by Correlated Double Sampling (Clamp & Sample) Dual Slope Integration (optimal) CgCg Reset Output CCD output “amplifier”

15-19 Sept-'08TWEPP 2008 Naxos, Greece13 Dual Slope Integration sequence a)Reset b)Integrate baseline up c)Move charge to output fet d)Integrate signal down abcd CCD output For typical “science grade” CCD T int  T read > ~ 2  s/pixel

15-19 Sept-'08TWEPP 2008 Naxos, Greece14 At f pixel-read = 500 kpixels/sec  32 sec Read Time (with one output amplifier)  Each CCD must have 16 parallel outputs & electronic readout channels  ~200 sensors  3,200 parallel readout channels 16x segments, gap-less ½ k x 2k each ~ 40 mm x 40 mm Critical Specifications - Implications for Sensors -

15-19 Sept-'08TWEPP 2008 Naxos, Greece15 Critical Specifications - Implications for Sensor Thickness - Conflicting requirements  Small PSF Blue light has very small absorption length  favors thin sensor to minimize diffusion  favors full depletion in high resistivity silicon High QE in red Red light has very long absorption length Thin sensor would be transparent in red & near IR  favors thick sensor Optimization : “Study of Silicon Sensor Thickness Optimization for LSST” [1] Calculations Simulations LSST Sensor Working Group D. Figer, J. Geary, K. Gilmore, S. Marshall, P. O’Connor, J. Oliver, V. Radeka, C. Stubbs, P. Takacs, T. Tyson [1]

15-19 Sept-'08TWEPP 2008 Naxos, Greece16 Effect of sensor thickness on PSF Beam divergence : f1.2 beam  46 deg max Beam divergence in red, (simulation) PSF vs Thickness : Divergence + diffusion  Sets thickness limit

15-19 Sept-'08TWEPP 2008 Naxos, Greece17 Silicon 1000 nm vs Thickness To get > 25% - 100C  Optimal sensor thickness = 100  Effect of sensor thickness on QE

15-19 Sept-'08TWEPP 2008 Naxos, Greece18 Sensor Requirements cont’ - Temperature Stability - Sensor QE is very temperature dependent near ~ 1,000 nm For accurate photometry, temperature stability ~ +/- 0.1C Sources of heat CCD gates (small) CCD output amplifiers (medium) Heat radiation through lens (large ~ ½ W per sensor) Heat removal by thermal straps to a cryogenic plate Thermal control loop High stability temp sensors close to CCD package Heaters  0 to ~ ¼ W per sensor on sensor package or cold straps

15-19 Sept-'08TWEPP 2008 Naxos, Greece19 Sensor Status An array of “study” sensors has been produced by e2v STA/ITL 100  to 150  thickness All fully depleted between 10V – 25V “back window bias” Sizes 1 MPixels to 16 Mpixels Multiple output ports BNL Not final package “Pre-Production” sensors E2v STA/ITL 100  thickness Final packaging  4 side buttable  flat to 6  (p-v) Expected  Fall 2010

15-19 Sept-'08TWEPP 2008 Naxos, Greece20 Focal Plane Construction 3 x 3 arrays of CCDs are mounted into a precision “Raft” 144 Mpixels per Raft 21 Rafts are mounted onto a rigid (SiC) “Grid” Major issues Each sensor has ~ 150 bond pads Total of ~ 30,000 bond pads Sensors reside in high-vacuum cryostat To avoid 30,000 cryostat feedthroughs, all readout electronics is placed within cryostat. Each Raft is modular. All its readout electronics must reside in the shadow of the Raft. Raft electronics is divided into two sections Analog, front end, in cryo-zone (-100C) ADC/digital in warmer zone (- 40C)

15-19 Sept-'08TWEPP 2008 Naxos, Greece21 FPA -40C - 100C Cryostat Front End Electronics Back End Electronics Utilities, Timing & Control Utilities, Timing & Control Ethernet High level commands Ethernet High level commands Shutter Filters Data fibers to DAQ Data fibers to DAQ Camera Overview

9 Sensor Raft Sept-'08TWEPP 2008 Naxos, Greece22 Focal Plane Construction Raft FEE BEE Raft Tower Assembly Trimmed for flatness requirement during assembly Very high image “fill factor” > ~ 90%

15-19 Sept-'08TWEPP 2008 Naxos, Greece23 Cryostat Assembly 21 “Science Rafts” 4 special purpose “corner Rafts” “Guide” sensors for telescope fine steering “Wavefront” sensors determine mirror distortions for active mirror adjustments ~ 64 cm dia

15-19 Sept-'08TWEPP 2008 Naxos, Greece24 Camera with filters

15-19 Sept-'08TWEPP 2008 Naxos, Greece25 Front End Electronics Located within “grid” : Operates at – 100C to – 120C Each “FEB”services 24 CCD segments – 6 FEBs per Raft Analog functionality in 2 ASICs Analog Signal Processing ASIC (ASPIC) LPNHE/IN2P3 collaboration[1] - France Dual Slope Integrator : Programmable gain Specs: e n < ~ 5 nV/rt(Hz) x-talk < ~ (achieved in 1 st version) Differential output to Back End Boards (ADCs) via shielded flex cable 8 channel ASIC, AMS 0.35  5V, ~ 25mW/ch [1] V. Tocut, H. Lebbolo, C. De La Taille, P. Antilogus, S. Bailey, M. Moniez, F. Wicek, R. Sefri

15-19 Sept-'08TWEPP 2008 Naxos, Greece26 Front End Electronics – cont Sensor Control Chip (SCC) ORNL – U. Tennessee [1] Receives LVDS signals from BEBs  Converts to Clock levels to CCDs Parallel gates (4), Serial gates(3), Reset(1) Clock Hi/Lo levels in range 0V to ~ 25V, programmable on BEB 4 channels per chip, 2 chips per CCD. CCD bias level buffers in range up to ~ 30V ATMEL BCD-SOI process. HV to 45V Status  1 st submission tested & fully functional  Some pulse shape “wrinkles” (fully understood in simulation)  2 nd submission  Fall ’08 Additional FEB functionality Temp sensing & other usual monitoring Raft heaters  Part of focal plane thermal control loop [1] P. Stankus, C. Britton, Z. Ning, N. Ericson

15-19 Sept-'08TWEPP 2008 Naxos, Greece27 Back End Electronics Back End Boards Raft Control Crate Raft Control Module 6x Back End Boards (BEBs) 24 channels ea, 18 bit 1 MHz ADCs (COTS) Temp sensor processing Programmable bias & clock levels for FEBs Sensor heater control Misc slow controls FPGA (Xilinx) based programmable “Readout State Machine” Collects all ADC 100 MHz All control loops stored locally Responds to high level commands from Timing & Control Module (TCM) All Rafts in fully synchronous operation “Rocket i/o” data output to drive data fiber to DAQ (~1.6 Gb/s) Power PC for non-time critical operations

15-19 Sept-'08TWEPP 2008 Naxos, Greece28 Back End Electronics - Data Volume - Per image: 3.2 Gpixels  ~ 7 GB Per minute : 4 images  ~28 GB Per night : ~ 600 min  ~ 16 TB Per year :  ~ 5 PB All fibers received by “Science Data System” – (SLAC) Public data set

15-19 Sept-'08TWEPP 2008 Naxos, Greece29 Additional Electronics Issues Thermal management Thermal paths & modeling  ICs and components to ground/thermal planes  “Chip scale” packaging  Conduction bars  Crates/housing  Cold plates / cryoplates Board level R t ~ 20C/W across 2 oz copper plane Crate level R t < ~ 0.5C/W

15-19 Sept-'08TWEPP 2008 Naxos, Greece30 Additional Electronics Issues Contamination & outgassing Outgassing materials may condense on sensor surface ~ 2 m 2 of pcb materials in cryostat Polyimide pcb construction (if necessary) Parylene (vapor deposition) or similar coatings Electronics separated from focal plane by molecular barriers (tortuous paths) and separate vacuum pumping All in-cryostat materials tested / certified in test “Materials Test SLAC Optical loss measurement over LSST pass band & residual gas analyzer (RGA)

15-19 Sept-'08TWEPP 2008 Naxos, Greece31

15-19 Sept-'08TWEPP 2008 Naxos, Greece R & D Camera construction Telescope construction CD-1

15-19 Sept-'08TWEPP 2008 Naxos, Greece33 Telescope and site : Cerro Pachon, Chile