The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim.

Slides:



Advertisements
Similar presentations
Casino Gold AE Senior Thesis Brad Robertson. Project Overview Lighting Concept Poker Room Design Criteria Lighting Solution Calculations Pre-Function.
Advertisements

What you need today Text Notebook Calculator (optional) 1/8” = 1’ print of foundation (basement) plan –With dimensions.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Chicago, Illinois Michael Gramarossa, BAE/MAE Mechanical Option Advisor: Dr. James Freihaut JGMA.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Science & Technology Center. Chestnut Hill Academy - Philadelphia, PA David Klug. Mechanical Option. Advisor - Dr. Freihaut April 15 th, 2009 Architectural.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
River Avenue Pittsburgh, Pennsylvania Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth H.J. Heinz Distribution Center.
North Pocono High School
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
SENIOR THESIS PRESENTATION
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Leah Matern Lighting/Electrical Option Faculty Advisors: Dr. Richard Mistrick and Ted Dannerth April 13, 2011 Crystal Lake Elementary School Lake Mary,
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Green Modifications Suburban Wellness Center Germantown, Maryland Cory J. Abramowicz.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Harley-Davidson Museum Milwaukee, WI. Jonathan Rumbaugh, BAE/MAE Mechanical Option Advisor: Dr. William Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Harley-Davidson Museum
Pearl Condominiums Philadelphia, PA
Grunenwald Science and Technology Building
Eastern Pennsylvania Laboratory Facility
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Lehigh Valley Heritage Center
Virtua Replacement Hospital -Voorhees NJ
Architectural Engineering, The Pennsylvania State University
North Shore at Canton The Pennsylvania State University
Presentation transcript:

The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingOverview Located in North-East United State Exam, Physical Therapy, Radiology, Small Lab ~73,000 SF $21.9 Million Currently Under Construction Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Exam Physical Therapy Radiology

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingExisting Conditions Packaged Rooftop Units – 70 Ton – VAV Reheat Ductless Split System Units Propane and Electric Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Summer Design Cooling (0.4%) Winter Design Heating (99.6%) Outdoor Air Dry Bulb (°F) Outdoor Air Wet Bulb (°F) Indoor Air Design Temp (°F) 7572

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingTrane Modeling Trane TRACE 700 Blocks Defined As: – Conference – Corridor – Lobby – Office – Physical Therapy – Procedure – Reception – Storage 115 Tons $46,060 Yearly Utility Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Electric (kWh) Gas (kBtu) Total Building Energy (kBtu/yr) Heating-709,240 Cooling204, ,791 Lighting529,746-1,808,024 Receptacles115, ,161 3,611,216

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingTrane Modeling Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingGround Coupled Motivation Large area for ground coupled placement Eliminate need for propane gas Potential for large energy savings Reduce Emissions Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingVertical Well Required well length of 10,702 ft – 15% factor of safety 36 wells needed – 300’ well depth Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Well Depth (ft)Required LengthNumber of Wells

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingHorizontal Well Required Length of 10,702ft – 15% factor of safety ft runs 1 – 400ft run 10,800ft total Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingCost Analysis – Rooftop Units Trane Axiom GER 300 – 25 Ton Capacity Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Original UnitsNew Units Cost per Unit$62,650$24,975 Number of Units25 Total Cost$125,300$124,875

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingCost Analysis - Wells Utility cost after - $42,115 Savings - $3,945 Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Vertical WellHorizontal Well Cost per Unit Length$10.57$1.12 Total Length10,70210,800 Pipe & Fitting Cost-$6,048 Total Cost$114,156$18,144 Simple Payback28.9 years4.6 years Discounted Payback-4.9 years

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingLoads & Original Design 24K4 Roof Joist W18X35 Mechanical Joist Loads – Snow Load – 20psf – Live Load – 30psf – Dead Load – 8psf – Collateral – 7psf – Mechanical Dead Load – 75psf Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingJoist Redesign 42 nd Edition Catalog of Standard Specifications and Load and Weight Tables for Steel Joists and Joist Girders New Joists: 20LH08 Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingGirder Redesign Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingCost Comparison Savings of $32,724 Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Original Design MemberCost per Member# of MembersTotal Cost W18X35$1, $42, W24X55$2, $26, W24X68$2, $5, $75, Redesign MemberCost per Member# of MembersTotal Cost 20LH08$ $14, W21X55$2, $21, W21X73$2, $5, $42,456.00

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingConclusion/Recommendations Ground coupled system – Saves $3,945/year – Vertical Well – Payback of 28.9 years – Horizontal Well – Payback of 4.9 years Roof framing redesign – 20LH08 Joists – W21X55 and W21X73 Girders – Save $32,724 Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAcknowledgements Dr. Donghyun Rim – Advisor Kurt Hutter - Anchor Health Properties Randy Cook - The Procz Group Inc. Family and Friends Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Charts Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Summer Design Cooling (0.4%) Winter Design Heating (99.6%) Outdoor Air Dry Bulb (°F) Outdoor Air Wet Bulb (°F) Indoor Air Design Temp (°F) 7572 Electric (kWh) Gas (kBtu) Total Building Energy (kBtu/yr) Heating-709,240 Cooling204, ,791 Lighting529,746-1,808,024 Receptacles115, ,161 3,611,216

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Charts Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Well Depth (ft)Required LengthNumber of Wells Original UnitsNew Units Cost per Unit$62,650$24,975 Number of Units25 Total Cost$125,300$124,875 Vertical WellHorizontal Well Cost per Unit Length$10.57$1.12 Total Length10,70210,800 Pipe & Fitting Cost-$6,048 Total Cost$114,156$18,144 Simple Payback28.9 years4.6 years Discounted Payback-4.9 years

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Charts Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015 Original Design MemberCost per Member# of MembersTotal Cost W18X35$1, $42, W24X55$2, $26, W24X68$2, $5, $75, Redesign MemberCost per Member# of MembersTotal Cost 20LH08$ $14, W21X55$2, $21, W21X73$2, $5, $42,456.00

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Figures Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Figures Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Figures Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015

Overview Existing Conditions Ground Coupled Depth System Design Options Cost Analysis Structural Breadth Joist Redesign Girder Redesign Cost Conclusion The Medical Office BuildingAppendices - Figures Kale Mullikin Mechanical Option Advisor: Donghyun Rim Spring 2015