NORTHERN REGIONAL LOAD DISPATCH CENTER 12 th June 2004 Director DOE MD BPC Advisor DOE Royal Govt of Bhutan WELCOMES POWER GRID CORPORATION OF INDIA LTD.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

Study on Digital Switchover Plan in SATRC Countries 2 nd SATRC Spectrum WG Meeting March, 2014 Tehran, I.R.Iran Rumana Haque Bangladesh Telecommunication.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
SMART Devices in Utilities Béla Bakos Innovation advisor
Network Solution for NER States. POWERGRID CORPORATION OF INDIA LIMITED incorporated in October, 1989 with a mandate to Interconnect Regional Power Grids.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
The Fiber Optic Association is the professional society of fiber optics. It was founded in 1995 by a dozen fiber optic professionals who felt fiber optics.
MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs.
Air Quality: Status And Classification Of Cities Based On Indicators 8 h December, 2004 at BAQ-2004, Agra T S Panwar & Sumit Sharma TERI, New Delhi.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
Consultancy by : Power Grid Corporation of India Ltd.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Market Intelligence for India The Second Largest Population in the World!
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
W E L C O M E Power Grid Corporation of India Limited.
Power Grid Corporation of India Ltd.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri P. Shankar Chief Vigilance Commissioner At NORTHERN REGIONAL LOAD DISPATCH CENTER 25 th March.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri N K Singh Member, Planning Commission At NORTHERN REGIONAL LOAD DISPATCH CENTER.
POWER GRID CORP. OF INDIA LTD. Dr. Montek Singh Ahluwalia
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1 st June 2004 Shri P. M. Sayeed Hon’ble Minister of Power Govt. of India WELCOMES POWER GRID CORPORATION OF INDIA.
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri Brajesh Mishra Principal Secretary To Prime Minister At NORTHERN REGIONAL LOAD DISPATCH CENTER.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
Smart India-2020 :Are you ready?. Make in India.
Corporate Profile Ver: Jul 2008 globali.in. Global Group Enterprise $ 1.7 bn balance sheet size $ 601 mn Revenue $ 2 bn Market Cap* 21 Years of service.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Availability Based Tariff (ABT) in Northern Region.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an.
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
MyCityFreelancer This is an initiative by MyCityNetwork (MCN India Inc.). The objective is to expand our network in major Indian cities by giving you that.
Hermes Global Presence. Hermes – A GI Retail Group Company About GI Retail Group – business interest in 3 verticals  Travel and Services Retail  Tech.
POWERGRID – An Overview (through100% subsidiary POSOCO) Credit Ratings VISION World Class, Integrated, Global Transmission Company with Dominant Leadership.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Send rakhi to Mumbai Rakhi gifts delivery in Mumbai
Send rakhi to Mumbai Rakhi gifts delivery in Mumbai
Welcome To Ieccodeonline.com
MyCityFreelancer This is an initiative by MyCityNetwork (MCN India Inc.). The objective is to expand our network in major Indian cities by giving you that.
Assessing the Finances of ULBs: A Cross-Sectional Study
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Presentation transcript:

NORTHERN REGIONAL LOAD DISPATCH CENTER 12 th June 2004 Director DOE MD BPC Advisor DOE Royal Govt of Bhutan WELCOMES POWER GRID CORPORATION OF INDIA LTD.

POWER GRID CORPORATION OF INDIA LTD NORTHERN REGIONAL LOAD DISPATCH CENTER W E L C O M E S His Excellency CASTIGO CORREIA LANGA Minister of Mineral Resource & Energy And Delegates From Republic Of Mozambique 13 th December, 2003

RLDC::Brain Generation ::Heart Sub-Transmission:: Sub Arteries Transmission:: Main Arteries Distribution: Capillaries POWER SYSTEM::HUMAN BODY

HEARTGENERATION 72 Beats/Minutes50 Cycles/Seconds Stress/Anxiety Heart Beat Deviation Load-Gen.-Mismatch Frequency Deviation

BRAINLOAD DESPATCH CENTRE Controls the Body Function and keeps the critical parameters like temp, BP, Sugar level etc within limits Controls the Power System and keeps critical parameters like Voltage, frequency, MW, MVAR etc within limits Uses sensors like Eyes Ears, Skin, Tongue, Nose for data collection Uses Sensors like Transducers, Relays, RTUs etc. for data collection Uses Nervous system for communication Uses PLCC, Fibre Optics, Microwave for communication

MAIN ARTERIESTRANSMISSION Pumps blood from Heart to the Sub- Arteries throughout the Body Transfers Power from Generation to Sub- transmission throughout the Country

SUB- ARTERIES SUB- TRANSMISSION Deliver Blood from Main Arteries to each and every Body Part Deliver Power from Bulk Transmission points to every part of the Grid.

CAPILLARIESDISTRIBUTION Actual extraction of oxygen from blood takes place Actual consumption of electricity occurs

Regional Grids Of India

Inter Regional Links Present IR Capacity = 8,500 MW By the year 2012 = 30,000 MW 500 MW 1200 MW 1000MW 2000MW 500 MW 800 MW

International Links 50 MW 350 MW NEPAL BHUTAN

RTU SUB LDC SLDC ERLDC WRLDCNRLDCSRLDCNERLDC NLDC 32 Nos. 51 Nos Nos. Unified Grid Operation 5 Nos. National Level Regional Level State HQ Level Group / Distt Level Plant / Sub- Station Level

Functions Of RLDC  Apex Body For Integrated Grid Operation  Responsible for Optimum Scheduling and Dispatch of Electricity  Keep Accounts Of Electricity Transmitted Through Grid  Supervise and Control The Inter – State Transmission System  Ensure Security and Economy In Operation as per the Grid Standards and the Grid Code

Establishment of Modern RLDCs Has Resulted Into:  Considerable Betterment of System Parameters viz., Frequency & Voltage in spite of Minimal Generation AdditionBetterment of System Parameters  Merit Order Operation, Leading to Overall Economy Merit Order  State-of-the-art technology in grid operation by introduction of ULD & C Schemes.  Introduction of ABT (Availability Based Tariff), linked to frequency variation  Transparency in grid operation  Quantum leap in intra and Inter Regional Power Exchange and TradingInter Regional Power Exchange and Trading  Infused Grid Discipline

POWERGRID’s Diversification into Telecom

 To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom  Through an incremental investment  Telecom networks on Transmission Infrastructure  Sturdy & secure  Rodent menace free  Vandalism proof POWERGRID’s Diversification into Telecom

 Only utility in the country providing overhead fibre optic cable for telecom networks  DWDM/SDH equipment deployed  Scalable to Terabit Capacity  Obtained IP-II license in Jan 2001 and ISP Category-A license in May 2003 POWERGRID’s Diversification into Telecom

 All India Fibre Optic Network of 20,000 kms, spread over 60 cities including all Metros & major cities  Links under commercial operation  Delhi-Lucknow -Mumbai  Delhi-Ambala-Chandigarh-Shimla-Jallandar-Jammu  Delhi- Jaipur  Ahmedabad-Mumbai-Pune  Mumbai-Hyderabad-Bangalore-Cochin  Within NER  Maintaining availability of 100% on overhead OFC network POWERGRID’s Broadband Network

 Complete network to be in place by 2004  ChennaiJune, 2004  Allahabad, Kanpur, Agra June, 2004  Kolkatta, NER June, 2004  Trivandrum Sept, 2004 POWERGRID’s Broadband Network

Legend: Links under operation Links under Implementation NEW DELHI Lucknow KOLKATA MUMBAI HYDERABAD CHENNAI BANGALORE Ahmedabad Bhilai Kanpur Allahabad Chandigarh Shimla Jaipur Vijayawada Vishakapatnam Pune Madurai Trichy Agra Jammu Patna Nagpur Bhopal Cochin Trivandrum Agartala Shillong Imphal Kohima Guwahat i Bhubaneswar Meerut Siliguri Link to Bhutan Durgapur Srinagar Bhuj Itanagar Aizwal Jaisalmer Jamnagar Telecom Backbone Network

Overhead Fibre Optic Cable Installation ACSR STRANDS ALUMINIUM TUBE FIBRE OPGW

Customer Base NIC(GOI) ERNET(GOI) STPI(GOI) ESTEL(ISP) Fidelity (Call Centre) GLIDE(ISP) Bharti infotel (NLD) Bharti Cellular Airtel VSNL, (ILD/NLD) Data Access, (ILD) Daksh, (Call Centre) Convergy’s,(Call Centre) Spectranet (ISP) HCL Infinet (ISP) ExattNet(ISP) Hutchission Essar (Cellular)

Thank You

Prior To ABT & RLDC Administration After ABT & RLDC Administration

ULD & C PROJECT: OBJECTIVES To have To have Greater and deeper visibility of the power system under control Greater and deeper visibility of the power system under control Better communication and co-ordination between control centers Better communication and co-ordination between control centers Effective management of grid parameters viz. frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in better Effective management of grid parameters viz. frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in better  Operations scheduling  Operations monitoring and control  Power system analysis A real time environment for dispatcher training A real time environment for dispatcher training

AVAILABILITY BASED TARIFF (A)CAPACITY CHARGE (B)ENERGY CHARGE (C)ADJUSTMENT FOR DEVIATIONS (U I CHARGE) Where (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % share (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)