KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, 14-15 April, Paris E. Kleiboer Sr. Manager Strategy ATM.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Airside Capacity Enhancement
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
SESAR and ASAS Opportunity
Applications from packages I to III
Sense & Avoid for UAV Systems
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Study Continuous Climb Operations
SESAR Single European Sky Air traffic management Research
FASVIG Introductory Meeting
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
1 September 28th, 2005 NASA ASAS R&D A IRSPACE S YSTEMS P ROGRAM Michael H. Durham Kenneth M. Jones Thomas J. Graff.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
ASIA PACIFIC Air Traffic Flow Management
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 NUP II+…results from different areas… …not only CPDLC and S&M Presented by Fredrik Lindblom, LFV
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
EUROCONTROL European Organisation for the Safety of Air Navigation.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
4 th Workshop, Amsterdam, April 2007 page 1 ASPA-S&M in Paris ASPA-S&M in Paris: CRISTAL PARIS and PALOMA results Jean-Marc Loscos, DSNA.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS TN Third Workshop, April 2004, Toulouse Session 1 Use of the System by pilots and controllers Tony Henley.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
ASAS TN2 Final Seminar Paris, April 2008 LEGAL ASPECTS OF ASAS Dr. Francis SCHUBERT Head Corporate Development / skyguide.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
ASSTAR Overview Jean-Marc Loscos, DSNA
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
KDC ASAS 2008 project - How could ASAS benefit the NL ATM System
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Karim Zeghal EUROCONTROL Experimental Centre
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
FAA and JPDO ASAS Activities
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM

ASAS TN2 Final Seminar TOC Background Background KDC Explain KLM role in ATM developments Introduction to KDC ASAS study Specific challenges Schiphol Airport Growth versus environmental constraints, need for fixed routes and enhanced arrival management. KLM View on ASAS Airspace User vision + Areas where ASAS could help Decentralization separation tasks, ATCO workload, small deviations from “optimized” business trajectory Sequencing and Merging Ground maneuvering Current status of the project Summary / conclusions / possible next steps

ASAS TN2 Final Seminar Background KDC Focuses on joint research for Schiphol mainport development -Meeting market and environmental challenges. Relations / partners

ASAS TN2 Final Seminar KLM role in ATM Air France / KLM only group airline registered in both DOW JONES SUSTAINABILITY INDEXES KLM is pushing innovation in the airline industry further along by setting examples in innovation. Active role in -SESAR Definition / Development phase -EU AIRE Initiative -FAB EC -Cros regional ATM Pilots -AMS Airport CDM -KDC research

ASAS TN2 Final Seminar KDC ASAS study Objectives / timing Launched in February 2008 To study if and how the Airborne Separation Assistance System (ASAS) could benefit the Schiphol concept evolution. -6 Workshops addressing specific problem areas and ASAS functions. The result should be a short list of applications with recommendations for a more detailed / focused research and focus on implementation.

ASAS TN2 Final Seminar Specific challenges Schiphol (1) required: >120 nm Conceptual 18R 18C 06 36R 24 18L 36C 36L

ASAS TN2 Final Seminar Specific challenges Schiphol (2) E- TMA TMA ETMA entry region arrival route CDA merge point IAF example tactical routes

ASAS TN2 Final Seminar Airspace User vision Endorsed User Vision by all User Associations -Addresses also airborne decision making aids required to increase pilot situational awareness and safety and to enable the flight crew to provide separation under well defined conditions and precise division of tasks between the pilot and air traffic control. Vision secured on SESAR Concept of Operations Allowing increased ATC productivity, more efficient use of airspace (smaller footprint) and enabling aircraft to fly closer to optimum trajectories. It also shows potential to increase safety. Implementation will be driven by safety / business cases.

ASAS TN2 Final Seminar KLM view on Schiphol benefits On Ground / Departure On Ground under LVC -Safety -Separation responsibility with flight crew -Vacation of sensitive area Departure -Slow traffic, GS awareness

ASAS TN2 Final Seminar KLM view on Schiphol benefits Arrival Peak hour capacity / Fixed routes/ CDAs 4D arrival management necessary S&M Spacing

ASAS TN2 Final Seminar Electronic Flight Bag Experience with Airport Map Application Driver: reduce runway incursions risk Class C s/w to aid flight crew positional awareness only. No other traffic shown, own ship only

ASAS TN2 Final Seminar Electronic Flight Bag Experience with Airport Map Application hours / flight cycles since EIS 2003 Airport Map appreciated by pilot community -25% rated excellent -45% rated very good -No issues related to navigation Improved SA complex airports -in LVC RWY Incursion prevention -No Air Safety Reports, meaning? hours / flight cycles since EIS 2003 Airport Map appreciated by pilot community -25% rated excellent -45% rated very good -No issues related to navigation Improved SA complex airports -in LVC RWY Incursion prevention -No Air Safety Reports, meaning?

ASAS TN2 Final Seminar Next Steps ADS-B Out -SES IR for 2015? -Incentives needed Airport Map with traffic info and Airport Map with taxi routes? ASAS Operational trial Need for focused R&D

ASAS TN2 Final Seminar Summary ASAS a key enabler in SESAR Target ATM Concept -Supported by airlines. -Driven by Safety / Business cases. KDC ASAS project launched in February ’08. -ASAS could be a potential enabler for supporting CDA’s / RNAV routes and meeting capacity / efficiency / safety and environmental targets. -Conclusions / recommendations pending KLM Flight Crew -Positive attitude regarding new system capabilities and changed responsibilities. -Opportunity rather than “threat”.