Institute of Transportation Systems > OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 1 OPTIMISATION OF POINT LIFE CYCLE.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

KPI Familiarisation.
RELATION BETWEEN DEMAND AFTER TRAIN PATHS AND CAPACITY OF RAILWAY TRANSPORT INFRASTRUCTURE Ing. Josef Bulíček, Ph.D. Ing. Lukáš Fiala University of Pardubice,
FreightVision Austria 2050 ITS and Smart Logistics towards Eco-Efficency Claus Seibt, Independent Expert (formerly Austrian Institute of Technology)
Unit III Module 6 - Developing Age Exploration Tasks
CAPACITY LOAD OUTPUT.
Analysis and Multi-Level Modeling of Truck Freight Demand Huili Wang, Kitae Jang, Ching-Yao Chan California PATH, University of California at Berkeley.
Total Productive Maintenance (TPM)
Systransis Ltd Transport Information Systems Riedstrasse 1 CH-6343 Rotkreuz Telephone Fax Future potentials of optimisation.
Russia – EU seminar on rail transport research, October
World Transport. Concentration of Railroads in Select Countries One way in which goods are transported is by train. Some nations’ communities are much.
Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.
Grid Load Balancing Scheduling Algorithm Based on Statistics Thinking The 9th International Conference for Young Computer Scientists Bin Lu, Hongbin Zhang.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Capacity for Rail KAJT Dagarna, Dala-Storsund Pavle Kecman - LiU Anders Peterson - LiU Martin Joborn – LiU, SICS Magnus Wahlborg - Trafikverket.
Chapter 12 – Independent Demand Inventory Management
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
Adaptations to Resistance Training. Key Points Eccentric muscle action adds to the total work of a resistance exercise repetition.
IRU Academy initiatives – focus on road safety Ufa, 13 May 2015 Larissa Dobrukha, TCC AIRCU, IRU Academy AC Chairperson.
«Enhance of ship safety based on maintenance strategies by applying of Analytic Hierarchy Process» DAGKINIS IOANNIS, Dr. NIKITAKOS NIKITAS University of.
COnvergence of fixed and Mobile BrOadband access/aggregation networks Work programme topic: ICT Future Networks Type of project: Large scale integrating.
ETSI Methodology1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
AIRCRAFT HANDLING Part 1 Maintenance.
Development of Sectoral Training Centres in Lithuania Rimantas Dumčius Public Policy and Management Institute
Economic Evaluation of PV systems in Jordan
First Regional Conference Energy Efficiency of Railways in terms of Sustainable Development November Belgrade, Serbia Mr. Saša Živković, B.Sc.Eng.
PG Funding and Management Strategies Asset Management and task M7 4th meeting Thursday, 19 April 2007 Paris La Défense.
Sandra Dietsch, Jan Grippenkoven, Anja Naumann German Aerospace Center
Presented By Dr. Mohsen Alardhi College of Technological Studies, Kuwait April 19 th,2009.
Introduction to Business © Thomson South-Western ChapterChapter Chapter 2 Measuring Economic Activity Economic Conditions Other Measures of Business Activity.
An Introduction to Transportation Systems
Relex Reliability Software “the intuitive solution!” Relex Software Corporation 1.
1 Public Meeting to Update the Board on Mandatory Commercial Waste Recycling October 21, 2011.
Risk-based Asset Management for Networks
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
Chapter 11 Managing Inventory throughout the Supply Chain
1Stephan Nicklas Summary EVITHERM Basics of Thermal Metrology (unimplemented) Dates / Events (unimplemented) EVITHERM Profile (unimplemented) Global Links.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Introduction to Transportation Systems. PART I: CONTEXT, CONCEPTS AND CHARACTER IZATION.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
EMS in The Netherlands Italian – Dutch seminar Verona, 28 may 2014 Elmer de Bruin - Head of international Affairs Transport en Logistiek Nederland.
V6 Safe loading. Fleet Operator Recognition Scheme (FORS) FORS is important to our company because it helps.
1 COMBINED TRANSPORT A brief view on the UIRR scrl Bratislava Intermodal Transport Conference 18/ Rudy COLLE Director General.
Road Investment Decision Framework
Managing a Training Load. Periodisation of training Phases of training – microcycles, mesocycles and macrocycles. Peaking and Tapering – step reductions.
Wolfgang Runte Slide University of Osnabrueck, Software Engineering Research Group Wolfgang Runte Software Engineering Research Group Institute.
in Croatian Track access charging system
Internship Saudi Aramco Security System Maintenance Division
Today´s Challenges of the Rail Infrastructure Industry
Maintenance strategies
Professor Mahesh Pandey Institute of Risk Research and
Summary of Changes to the
How to Pass SMRP (Society of Maintenance
Saint- Petersburg State University of Aerospace Instrumentation
Performance indicators Unplanned unavailability
COMBINED TRANSPORT A brief view on the UIRR scrl
The Business of Transportation
Maintenance Strategies for Turnouts
MAINTENANCE PLANNING AND SCHEDULING
Introduction to Information Systems
KPI Familiarisation
The Business of Transportation
14 MRP and ERP.
Weighted Interval Scheduling
Passenger Mobility Task Force 21 May 2015
Weighted Interval Scheduling
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Presentation transcript:

Institute of Transportation Systems > OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 1 OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE German Aerospace Center – Institute of Transportation Systems Katja Beck, Bärbel Jäger, Karsten Lemmer

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 2 Motivation 1. Demand for more economic efficiency in the railway sector 3. Maintenance costs of infrastructure elements are cost drivers 2. More economic efficiency through a decrease in life cycle costs

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 3 Life Cycle Costs – Maintenance Strategy LCC – sum over all costs generated in the life phases of a product (DIN EN ) Maintenance cost determined mainly by Number of CM and PM cases Duration Manpower needed Maintenance Strategy CM – corrective maintenance PM – preventive maintenance

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 4 Maintenance Strategy - German Railways Decreasing the probability of failure and the number of corrective maintenance cases (EN 13306) Preventive maintenance strategies German Railway infrastructure maintained Mainly time dependent Condition-based through monitoring Time dependent intervals Condition based intervals No preventive maintenance

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 5 Time dependent maintenance German Railways Track components maintained dependent on load figure Load figure = Number of Trains x Total Tons x per week 0-35 low traffic volume normal traffic volume >600 high traffic volume Load category: Fix preventive maintenance interval + Easy to plan - Not cost efficient

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 6 Points Railway infrastructure element Ensuring system flexibility Maintenance based on Time Condition (use of point diagnosis systems) Wearout highly load-dependent

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 7 Idea: Load-dependent Maintenance Why not use operation simulation information when determining the need for preventive maintenance work? No falling below the wear-out limit - Total costs for PM - Costs per PM case - Number of PM cases CM – corrective maintenance PM – preventive maintenance

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 8 Simulative Evaluations Railway operation simulation (e.g. RailSys  ) Number of trains Weight of trains Load figure = Number of Trains x Total Tons x per week Example Single way track Ca. 50 passenger trains per day Weight of 500 tons LF = (50 x 7) x (50 x 500 x 7) x = Number of Trains Total Tons

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 9 Time-dependent vs. load-dependent maintenance LF = Load category LF = 36 Number of Trains (500 tons) per day = 39 LF = 600Number of Trains (500 tons) per day = 158 Scheduled Maintenance after 2 months (accordant to guide line)  2379 < Number of trains < low traffic volume normal traffic volume >600 high traffic volume

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 10 Maintenance Cost Savings Preventive maintenance cost savings for chosen example (67 points, 5 years period) Relating to maintenance work after 2 months Calculated with cost figures from the German Railways ScenarioNPV of PM costs Time-dependent - 2 months 100 % Load dependent - after 6000 vehicle crossings21 % Load dependent - after 9500 vehicle crossings 13 % NPV – Net Present Value PM – preventive maintenance

Institute of Transportation Systems OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 11 Summary Cost optimisation needed Infrastructure maintenance costs as cost drivers Use of train scheduling information instead of additional diagnosis equipment Maintenance process flexibility needed Load as a wearout factor High saving potentials in point maintenance costs Cost savings particularly high if LF is on the lower bound of the load category

Institute of Transportation Systems > OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 12 Thank you for your attention