CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

KPI Familiarisation.
Radiopharmaceutical Production
PO 005:Physical Therapy Material Control. Learning Objectives Develop a plan to manage physical therapy equipment including: – PT equipment inventory.
1 © Life Cycle Engineering 2011 The Misguided Application of the Planner/Scheduler Tim Kister Senior Planner/Scheduler Life Cycle Engineering Carolinas.
SE429 Maintenance Planning and Control.
Maintenance At Your WWTP August 2010
Productive Maintenance
Quality Management System
INDUSTRIAL & SYSTEMS ENGINEERING
Pertemuan 25 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.
Chapter 14 The Production Cycle.
Achieving our mission Presented to Line Staff. INTERNAL CONTROLS What are they?
Configuration Management
HOSPITALITY MANAGEMENT Ch. 16 HS. THE GENERAL MANAGER  General Manager – is a person responsible for the entire operation of one unit of a hospitality.
Computerised Maintenance Management Systems
Protection Against Occupational Exposure
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Leaders Manage Daily Operations
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
14s-1Maintenance William J. Stevenson Operations Management 8 th edition.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 4 1 Chapter 4: Basics of Preventive Maintenance and Troubleshooting IT.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Presentation on Preventive Maintenance
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
CHAPTER#19 PRODUCT WARRANTIES AND LIABILITIES Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Subgrantees’ Monitoring (PRAEP Programmatic and Fiscal Monitoring Guide) Puerto Rico Department of Education Educational Services to the Community Adult.
Computerised Maintenance Management Systems
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Maintenance Management [14]
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Chapter 6 Requirements for a Maintenance Program.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
Failure Modes, Effects and Criticality Analysis
The Office Procedures and Technology Chapter 7 Time and Workstation Management Copyright© 2007 Thomson/South-Western.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Internal Control in a Financial Statement Audit Chapter Six.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Production Planning and control – ME 1009 Unit 1 Introduction.
Introduction to Cost Accounting and the Job Order Cost Cycle
The Good Maintenance Guide
Maintenance Scheduling
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Auditing Information Technology
Chapter 16 Supplement Maintenance.
Total Productive Maintenance and Maintenance Management
(Additional materials)
Clinical Engineering Lecture (3).
MAINTENANCE PLANNING AND SCHEDULING
Operations Management
ISO 9001 Awareness Training.
GE 6757 TOTAL QUALITY MANAGEMENT
Chapter#09 Management of engineering contracts
KPI Familiarisation
Operations Management
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
Operations Management
CEM 515 Done by: Abdulkarim Sulais
Directed Change Constructive Change
Radiopharmaceutical Production
Presentation transcript:

CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB KHUSHNOOD

What is the difference b/w MAINTENANCE & MAINTENANCE ENGINEERING ……….. ?

Maintenance “Maintenance” means to keep equipment in operational condition or repair it to its operational mode. Its main components are:  Preventive Maintenance  Corrective Maintenance Preventive Maintenance is the maintenance which is carried out to prevent/avoid the upcoming breakdowns. Corrective Maintenance is the maintenance which is carried out to avoid the reoccurrence of the same breakdown.

Maintenance Engineering Its main objective is to ascertain that the new products are designed for ease of performing maintenance and that the proper economic support subsystem is provided at the moment of need.

Maintenance Engineering Department Functions Maintenance of installed equipment and facilities. Installation of new equipment and facilities. Modification of already installed equipment and facilities. Inspection and lubrication of existing equipment. Management of inventory. Disposal of waste and salvage. Production of utilities. Administration. Supervision of manpower. Keeping records.

Maintenance Manual It contains:  Policies  Objectives  Procedures  Organization concerning execution of maintenance functions.

Why Maintenance Manual is Needed….?

Due to following reasons maintenance manual is important in an organization:  Unclear authority  Unclear responsibility  Execution bureaucracy  Incomplete procedures  Existence of duplicated effort and facilities

Objectives of Maintenance Engineering

An Approach For Upgrading Maintenance This approach is composed of following steps: 1.Determine the existing deficiencies. 2.Set goals for maintenance improvement 3.Establish priorities by taking into consideration the saving from each project under study. 4.Select indices to measure performance of each objective. 5.Establish plans for both short and long term. 6.Implement plan. 7.Report status on a semi-annual basis. 8.Review the plan at the end of each year.

Effective Maintenance Management The important components of managing maintenance function:  Maintenance Policy  Control of materials  Preventive maintenance  Work order  Job planning  Priority and backlog control  Data recording system  Performance measurement indices  Work measurement

Maintenance Policy Document which clearly describes the policies, objectives, authorities, responsibilities, maintenance performance measuring techniques.

Control of Materials  Material control is a important perspective for the efficiency of the maintenance organization.  The improper control of materials may be the cause for the delay in performing maintenance, false start, ineffective utilization of manpower.  One of the important problems of the material control is the inventory control.

Inventory Control Model Following symbols were used to develop equations for the model.

Example

Solution

Preventive Maintenance This is performed to keep equipment in satisfactory working condition by providing inspection and correction of early stage malfunctions. During preventive maintenance following factors must take under consideration.  Economics(maintenance cost is compared with downtime cost)  Standards compliance(government, insurance, professional, fire, safety standards)  Process Reliability(critically consideration of production schedule deadlines )

Preventive Maintenance Benefits  Reduction in catastrophic failures  Reduction in maintenance costs.  Reduction in production downtime  Reduction in overtime payment for the maintenance workers  Reduction in the requirement of the backup equipment  Reduction in the manufacturing unit cost.  Improvement in safety for workers

Work Order The purpose of work order is to authorize and direct an individual or a group to carry out a specified task. Work order should include following information: The requested and planned completion dates. The planned start date Work description and its reasons. Cost of materials. Cost of labor. Approval signatures. Work category(i.e: repair, installation) Affected items. Job planning

Job Planning For effective maintenance management following items have to be planned:  Procurement of tools, materials, components.  Security safety permit.  Delivery of tools.  Methods and sequencing  Development of designs.

Data Recording System The data recording system is used to keep various types of equipment or property records. These records are classified into four catagories: 1.Maintenance costs records 2.Work performed records 3.Inventory records 4.Files records (warranties, drawings etc)

Performance Measurement Indices Index I This index is known as the broad indicator and is defined as: I 1 =C tmc /P o Where I 1 is the index parameter. C tmc is the total sum of maintenance costs P o is the total output