Large Seismic Event Mitigation Zachary Mayer May 24 2012.

Slides:



Advertisements
Similar presentations
Pre- Conditioning course Prepared by DP Venter from pre-conditioning booklet as well as AEL presentation slides.
Advertisements

Experimental Testing of Drift- Sensitive Nonstructural Systems – Year 4 The Pathways Project San Jose State University Equip Site:
EMPIRICAL DESIGN METHODS – UBC GEOMECHANICS RESEARCH –CERM3 WORKSHOP
METHODS OF RETROFITTING
Earthquakes.
SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
MARIA CHINI VIKI IOANNOU THEMISTOKLIS TERATSIAS. o Vajont valley: part of the NE Italian Alps region o The dam is located between the mountains Toc and.
Mine dewatering for pit slope stability
Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location E. Westman, J. Kerr, K. Luxbacher, and S. Schafrik Mining and Minerals.
UTAH COAL MINE COLLAPSE By Iona Evans & Jonathan Price.
A study of the stability mechanism within shallow mining operations that will impact on the sustainability of Platinum Mines The CSIR Research and Innovation.
Implementing ESD in Major Infrastructure Projects Jo Moss - Senior Principal.
Earthquakes Waves & Seismograms Lecture prepared by Mr. B.
What Will a Large Earthquake be Like? Tom Heaton Caltech.
Measuring and Managing Operational Risk. 2 Assessing Operational Risk Exposure Required Process of Continuous Risk Assessment, Monitoring and Reporting.
Integrated Analyses for Monitoring and Rapid Source Modeling of Earthquakes and Tsunamis Brendan Crowell Subduction Zone Observatory Seminar May 13, 2015.
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
Development & Implementation of Strata Control Practices
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
SCT Operations Investigation into Abnormal Subsidence above a Longwall Panel in the Southern Coalfield, Australia Winton Gale Managing Director SCT Operations.
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
Stresses, Faults, Folds, and Earthquakes
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
Chapter 19 Earth quakes.
Earthquakes (Chapter 8)
EARTHQUAKE An earthquake is a sudden, rapid shaking of the Earth caused by the release of energy stored in rocks. An earthquake is a sudden, rapid shaking.
Earthquakes Chapter 6 February 2012 This topic will shake you up.
M8.6 EARTHQUAKE STRIKES OFFSHORE BANDA ACHE, INDONESIA: WED. AM, APRIL 11, 2012 Walter Hays, Global Alliance for Disaster Reduction, University of North.
Earthquakes (Chapter 13). Lecture Outline What is an earthquake? Seismic waves Epicenter location Earthquake magnitude Tectonic setting Hazards.
LIQUEFACTION FAILURE OF FOUNDATION - STRUCTURE COLLAPSE.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Physical Characteristics and Constructability Bill Roggenthen and Herb Wang Homestake DUSEL April 20, 2007.
Fault activation and microseismicity in laboratory experiments Thomas Göbel Danijel Schorlemmer, Sergei Stanchits, Erik Rybacki Georg Dresen, Thorsten.
DISASTER PLANNING LESSONS LEARNED September 16, 2014 Carol Musumeci, Risk Manager, Brookfield Properties Jim Boccher, VP Commercial Disaster Restoration,
ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
Earthquakes What is an earthquake? E arthquakes start by the plates underneath the ground. W hen earthquakes start they have a humongous shake that can.
Magnitude 8.0 San Francisco Earthquake April 18, 1906 Earthquakes & Tsunamis Magnitude 7.0 HAITI EARTHQUAKE January 12, 2010 Sumatra Tsunami December 25,
Risk Management on Tunnelling Projects Warwick University MSc course
February 13-15, 2006 Hydromechanical modeling of fractured crystalline reservoirs hydraulically stimulated S. Gentier*, X. Rachez**, A. Blaisonneau*,
19.4 – Earthquakes & Society. Damages  Death and injuries  Collapse of buildings  Landslides  Fires  Explosions  Flood waters.
What are Earthquakes? The shaking or trembling caused by the sudden release of energy Usually associated with faulting or breaking of rocks Continuing.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Quantifying Rockfall and Rockburst Risk in Underground Mines William Joughin.
Earthquakes Chapter 6 February 2012 This topic will shake you up.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
North Texas Earthquake Study Group EARTHQUAKES AND FLUID DISPOSAL – A HISTORICAL PERSPECTIVE Acknowledgements: Cliff Frohlich and the USGS Earthquake Hazards.
Tsunami Jens Havskov and Mathilde B. Sørensen. What is a tsunami A tsunami is an abnormal large wave hitting the coast.
Teaching Aids Service by KRRC Information Section.
Warm Up What do you think caused the ground to move as it did here?
Virtual Class Presentation
Back Analysis on Mag 2.4 along De Hoek Structure Moab Khotsong Mine
Earthquakes.
Ground Deformation: Faulting and Folding Earthquakes and Mountain- Building.
Earthquake Facts 2.0 By Bree and Jess .
Lithosphere-Earthquakes Unit
GEOLOGICAL STRUCTURES
Locating an earthquake
RECENT SEISMIC MONITORING RESULTS FROM THE CENTRAL
19.4 – Earthquakes & Society
Douglas Dreger, Gabriel Hurtado, and Anil Chopra
Here are the categories
Geotechnical Monitoring LiDAR GML-Underground A global convergence monitoring solution Presented by Nick Boswell.
Chapter 19 Earth Science Riddle
Earthquakes.
Hydroelectric Cavern’s Stability evaluation and rockbolts failure investigation using induced seismicity Sivakumar Cherukuri.
Watson B.P., Milev A.M., Roberts D.P. Presenter: B.P. Watson
Challenges in mine seismology
Presentation transcript:

Large Seismic Event Mitigation Zachary Mayer May

2 Agenda What Happened Project Goals and Results Timeline of Geotechnical Studies Risk Mitigation Ground Support Standards Geotechnical Modelling Results

& 2011 Seismic Events Jan 6/2009: 3.8 Mn event on 7000L. June 15/2009: 3.1 Mn event on 7500L. Aug 21/2011: 3.2 Mn event on 7500L. Sept 13/2011: 3.8 Mn event on 7000L.

4 Seismic Project Goal and Results Determine what happened Horizontal stress fault slip in pillar. Structure & geometry. Can seismic models reproduce the events? Yes – now have a better understanding. Can we control the events? New mining sequence will not eliminate seismic events, but should reduce maximum magnitude going forward. Can we manage the impact of large events? Yes - New support standards are effective in reducing damage/risk. Additional reinforcement in key areas. Re-entry protocols. Expanded the post-blast closure areas and increased personnel re-entry times.

5 Timeline of Geotechnical Risk Studies and Mitigation Efforts large seismic events

6 Ground Control Experts Involved in Kidd Study ( ) Patrick Andrieux – Itasca Consulting, Sudbury David Beck – Beck Engineering, Australia Wilson Blake – Independent Consultant, USA Richard Brummer – Itasca Consulting, Sudbury John Fedorowich – Itasca Consulting, Sudbury Anneta Forsythe – ex-Kidd/Itasca now Vale, Sudbury John Henning – ex-Kidd now Goldcorp, Timmins Marty Hudyma – Laurentian University, Sudbury Steve McKinnon – Queens University, Kingston Rob Mercer – Knight Piesold, North Bay Brad Simser – Xstrata Nickel, Sudbury Graham Swan – Ex-Falconbridge, Sudbury Erik Westmin – Virginia Tech, USA

7 Geotechnical Risk Studies Additional Mitigation Efforts Geotechnical analysis through detailed stress and structural models by 2 different consultants. Historical sequence modelling back to 2001 to try to re- create and understand events. Displacement model Stress Model Seismic Velocity

8 Risk Mitigation Enhanced support installation from 6000L to 9500L – the PPE of the mine. Re-entry protocols. Expanded the post-blast closure areas and increased personnel re-entry times. Currently shutting down between 2-4 levels for 12+ hours approximately 140 times/year. Revised mining sequence. Revised support standards (lower screen & bolt to floor). Six Sigma project– single-pass “in cycle” enhanced support. Ongoing monitoring for deviation - SMART cable installation in intersections.

9 Geotechnical Risk Studies Additional Mitigation Efforts Forensic data mining looking for correlations. Confirming and adjusting ground support in damaged areas. Additional cable bolting in sensitive areas. Instrumenting more intersections. Investigating new seismic monitoring technology. Passive seismic tomography study. Additional microseismic system upgrades.

10 Damage Comparison 2009 vs Enhanced Support Works After 2009 rockburst: 4 intersections collapsed Drift damaged over hundreds of meters Several areas inaccessible After 2011 rockburst: No intersections collapsed Walls damaged over tens of meters No areas inaccessible 3.8Mn - Jan S 3.8Mn - Sept S Complete collapse of back Failure limited to bottom half of walls

11 Enhanced Support Works XC enhanced support installed XC after 3.8Mn event

L Refuge Station Upgrades

L Ramp Upgrades

14 69-S40 ACC Single-Pass Enhanced Support Installed “In Cycle”

15 Seismic Modelling 8 different mining sequences were modelled to test new mining plans in order to reduce seismic risk. Looked at: Mining in different direction, along strike, vertically.. Options for mining pillars, pillar dimensions, de-stress blasts.. Managing stopes around structure, sequence.. New plan reduces risk by deferring GW stope mining to end of mine life, leaving key pillars intact longer. New mining sequence will not eliminate bursting, but should reduce maximum magnitude in future. Bursting is a response to excavation, and is driven by adjustment of rock mass into mined openings

16 Modelling Results Example Seismic Potential 2013 Original Mining Plan New Mining Plan Red areas represent potential seismic zones

17 Conclusion New technology and tools provided better analysis and planning information. Have modelled that we can do something different - new mining sequence reduces risk. Expert consensus obtained on path forward. Enhanced support is doing it’s job. Expanded re-entry protocols keeping people out of harms way. Questions?