Planning in production systems Production schedule planning Slovak University of Technology Faculty of Material Science and Technology in Trnava.

Slides:



Advertisements
Similar presentations
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Advertisements

Supplier Development Kaizen Implementation Kit
Planning in production systems Optimized Production Technology Slovak University of Technology Faculty of Material Science and Technology in Trnava.
The Production Process
Supply Chain Operations: Planning and Sourcing
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
9 C H A P T E R Transaction Processing and Enterprise Resource Planning Systems.
Supply Chain Management
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
Course Objectives Define Capacity
Production Planning Processes Theories & Concepts
FLEXIBLE MANUFACTURING SYSTEMS. FLEXIBLE MANUFACTURING SYSTEMS MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS.
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
LECTURE ESSENCE AND STRUCTURE OF BUSINESS PLAN. 1.The concept of business – plan 2.Contents (parts) of business plan.
Traditional Cost Management Traditional Cost Management C H A P T E R 6.
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
1 Logistik mit SAP Chair or Production & Operations Management University of Vienna All for One Vienna, Austria Franz Birsel The Logistic Chain.
Planning in production systems
Ardavan Asef-Vaziri Systems and Operations Management
Information ITIL Technology Infrastructure Library ITIL.
MS Tech-Ed 2006 Iron Architect Competition Greg Cogdell Milliken & Co.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Production and Operations Management Chapter Learning Objectives Explain the strategic importance of the production. Identify and describe.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Operational Excellence Demand Management and Master Scheduling.
PRODUCTION LOGISTICS Production Process Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
LOGISTICS MANAGEMENT 2. Definition Of LOGISTIS What is Logistics ?  “ Logistics means having the right thing at the right place, at the right time 
Planning in production systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #3.
PRODUCTION LOGISTICS Controlling in Production Logistics Slovak University of Technology Faculty of Material Science and Technology in Trnava.
PRODUCTION LOGISTICS Introduction Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Resource groups. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
PRODUCTION LOGISTICS Custom Logistics Slovak University of Technology Faculty of Material Science and Technology in Trnava.
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Manufacturing Plant maintenance Materials management Quality management.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
Planning in production systems PPS systems – production planning and control systems Slovak University of Technology Faculty of Material Science and Technology.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #15.
Planning in production systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Activity Scheduling and Control
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering Fall, 2015 Integrated Distribution & Production Planning (DP/PP) EIN.
Materials Flows Lay Out in Production Logistics
N ATURE OF PLANNING AND CONTROL Chapter 10. P LANNING & CONTROL IN OPERATIONS Planning and control is one of the major responsibilities of operations.
Objective of an efficient materials management. The objective of an efficient materials management is to provide the right materials (tools, work tools,
Planning in production systems Operation scheduling Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
SchedulingProducingControllingSchedulingProducingControlling.
Value 4 Golf is formed by a group of professionals who have been all their life linked to the world of golf, and actively participating.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Production Planning and control – ME 1009 Unit 1 Introduction.
Information ITIL Technology Infrastructure Library ITIL.
AXUG Partner Showcase – Introducing Preactor
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Facility Inventory Old Facilities Modern Facilities Classroom Size
Chapter 4 Inventory Management.
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Quality Management Systems – Requirements
Value Stream Mapping (VSM) Training
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
Resource groups
Introduction to Scheduling Chapter 1
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Presentation transcript:

Planning in production systems Production schedule planning Slovak University of Technology Faculty of Material Science and Technology in Trnava

Production schedule planning Creation thick production schedule - production quantities, allowances and terms – following  going order - build-to-order by concrete customer  prognosis by future sale - in series, connection. Collective production Find out sales activity decision for single manufactured parties through the medium prognosis and deal their by month = attune their with existing production size and going warehousing supply

Insufficient production island capacities = fit into a schedule too product lines, that are guard best capacitive compensation of available source. Activities  Prognosis demand  Planning custom order  Rough terminal custom order  Orientation calculation capacity  Gross calculation consumption of material

Planning of material request Farming with material Arrangements needs for material safety production concerning of type products, quantities and termsvzor textu... Designation of quantities  manufacture spare parts in corporation  shopping part

Planning steps:  piece list management piece list - allows budget for every product, of which subgroup and accessories is consisted, what are sum total part of accessories necessary for finished piece  decomposition request primary terms decomposition secondarily terms (subgroup, parts) secondarily terms must have towards primary certain temporal armature free stroke  Identification production batch and order quantities cumulating quantities of individual part, that are it is necessary produce whether procure, in production order (form production batch and order purchase  following request last step of planning in material request

Result of planning material request  we know how, in which partial temporal period are made order customer's parts and when they have exist safety bought out parts. Activities characteristics  Material resource planning  Calculation size supply  Calculation order quantities  Order material

Term and capacity planning Exact designation time of operation individual part exit in production, determination of startup and definitive terms. Finding concrete capacitive of load individual production furnished following acquaintance time of operation and terms. Capacitive removal following acquaintance of capacitive load

For every operation it is necessary to know:  Time of preparing for production furnished  Time of realization  Propagation time to following operation  Calculation of continuous time of young and old order production (production batch)  Maybe to assign earliest and latest booked and definitive terms for production canvass, times production start near line  Realization of capacitive compensation parties of production resources.

manufacturing planning agreements Background of production audit supply deposit Market deposit canvass production control Figure 1: Module of production planning

Production planning Combination of planning algorithm  Appraisal and predictions  Deadline capacity planning  Workshop planning and optimalization production Exploitation of dynamic planning material, co- operation, worker or profession and implements Combination of model production on store or production by order Formation enter in production in form optimally production order and production allowances

Basic functions Evidence of production prohibition  direct drive on demand, store ready production, working out production  selection suitable production variants, recommendation of production allowances  calculation of term supplies Dynamic plan consumptions material  claim to issue in production  direct drive on exposure canvass and on supplied storage facilities  reservation of strategic material

Capacitive calendar  for workstation, shop floor, centre  single maintenance through the medium of formula hours  evidence season and no-working days  planning repairs of machine balance deadline planning  balances claim to capacities, material, parts and semi finished goods, worker tools, financial fastidiousness  exploitation for yearly, monthly till daily planes, from time to time deadline balance sheet work

deadline planning  tool for businessman and controller of production  confirmation of term canvass, occupation of capacities standard place of work  exploitation of theory narrow spoil at production  solution of technological sequence production batch, included limited factor – machine x tool workshop planning  interactive creation front claim to workstation  in detail workshop planning inclusive optimizing algorithm  control production balances by quantities on buffer store

customer planning and production management  planning of individual prohibition  job-order manufacture or evidence prohibition - production order and batch internal production order  possibility assign optimally production batch for production on store  during production reserve quantities for incoming offer planning co-operation  work with alternative production in business or form co-operation  chance to follow alternative course of production

General map production infrastructure following entire portfolios claim to production ↔ draft plan of course production ↔ control of disposition source ↔ consequential calculation of suitable progress possibility of variant solution of the chief progress - alternatively production roads, substitute material or co-operation modification of plan ( obligation cut-down from time to time, date of delivery, minimize of supply) - by increasing the capacity or parallel operation over more technology

Material request planning scoring of availability shopping material in real time material can able to influence planning algorithms or is provision subsequently method JIT (Just in time) internal evaluation of purchase by setting criterion – admonish service on obligation order material, elect substitute supplier, substitute material – so called critical uncollected items

Planning the production process in-definition tree structure of technology manufactural process stream modeling from delivery of material in plant after finished product designation priority, criterion, given technology binding on consumer and supplier and commercial style companies for formation of optimally plan, possibility reservations material, semi-finished product from time to time following and scoring offer and load everyone's production resources

Optimalization of production process gadgetry for update data from production right on the planning screen ↓ following filling production on operational levels correcting of operative in due course production without obligation corrections plan, possibility to re-plan production