KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
1 GLD Surface Assembly Y. Sugimoto KEK
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
ALCPG09 Albuquerque, The new geometry of the ILD muon system in MOKKA N. D’Ascenzo, V. Saveliev, Obninsk State University / DESY U. Schneekloth.
Status of CEPC Detector magnet
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Review of PANDA Magnet Designs Reviewers A. Dael, D. Tommasini, and A. Yamamoto Held at GSI, th April, 2007.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Big Magnet Design II: a) solenoid and cable concept b) short section test V.V. Kashikhin and A.V. Zlobin.
1 Detector magnet and Structure for the GLD Detector KEK Hiroshi Yamaoka Mar. 03, ‘05.
Support and magnet coil KEK Hiroshi Yamaoka Nov. 10, ‘04.
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Global Design Effort Magnetic and Mechanical FEA of SiD IRENG07 Bob Wands September 18, 2007.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
AUGUST 3, 2010 BRYCE AUSTELL UNIVERSITY OF ILLINOIS FERMILAB SIST INTERN ADVISOR: RYUJI YAMADA Muon-to-Electron Conversion Experiment (Mu2e) Detector Solenoid.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
F. Kircher CLIC concept meeting 12/15/08 1 Some points about the superconducting magnet for a CLIC detector F. Kircher (CEA Saclay/DSM/Irfu/SACM) December.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Design ideas for a cos(2q) magnet
Experimental Hall in Mountain Regions
Update on PANDA solenoid design
2016/9/30 Yasuhiro Infra/CFS mini-ws
Status of the PANDA Magnet mechanics (yoke & cryostat)
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
The CMS magnet superconducting coil
Update of experimental hall in Japanese mountain site
Magnetic System Overview Solenoid and DID
SiD Solenoid Status and Plans
Status of the PANDA Magnet
FRESCA2 Update on the dipole design and new calculations
Detector hall in mountain regions
Challenges for FCC-ee MDI mechanical design
SoLID Magnet - Engineering and Cost
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
Detector hall in mountain regions
L H C A T L A S International Collaboration on the LHC Project
as a prototype for Super c-tau factory
CEPC Booster Ring Magnets
IR Beam Transport Status
Progress of CEPC detector magnet
Presentation transcript:

KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05

Solenoid Iron Yoke B=3T Coil/superconductor design - Optimize coil configuration 2 layers coil+ Al support cylinder + Correction coil? → Calculation: Magnetic force on the coil - Superconductor design Conductor size, Material(Al?, Cu?) → Calculation: Load line, Quench simulation Coil support system Configuration(Rod?, triangle shape?, string?), size? → Calculation: De-centering/shifted force Self-weight, Thermal load Coil supports have to withstand these forces. Cryostat design - Calculate required wall thickness. Calorimeter is supported on the inner vacuum wall. Assembly/Installation - Assembling procedure. - How install the magnet into iron yoke. Cooling scheme Thermal design Cryogenics system Power Supply Task list for Magnet Tesla Correction coil R4.0m

Magnetic field calculation - Optimize iron yoke configuration Field uniformity<2mm +Correction coil Try to loose amount of iron Support structure for iron yoke (barrel yoke/end yoke) How support the yoke against forces. Fixture, Bolts? Configuration, Size → Calculation: Self-weight, magnetic force, seismic force? The size of support → Minimize as possible Yoke assembling Weight of one layer >1000 tones. → Assembled from several piece of segments due to a limit of crane capacity. Segment configuration with keeping stiffness as complete one structure has to be considered. Construction Make a construction procedure → Easy/quick construction with high assembling accuracy. Adjust way to the beam line/level Maintenance procedures Design: Easy/quick access mechanism to the inner detector. Cable Earthquake Self-weight Mag. force Solenoid Barrel Yoke B Uniformity Task list for Iron Yoke Tesla End Yoke

Space for Solenoid/Yoke assembling Estimation of required space for; - Coil winding - Cryogenic system - Yoke assembling. Required crane capacity Experimental hall and other facilities