A SHFORK -B AINBRIDGE S TEEL D AM S TRUCTURAL E VALUATION P ROJECT DWP Engineering Diwei Chen Wen Cui Paul Garrett.

Slides:



Advertisements
Similar presentations
HELP !!!!!! International border bridge located over the Rainy River on the Minnesota Trunk Highway 72 and Ontario Provincial Highway 11 This route provides.
Advertisements

Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Commercial Building Project Portfolio
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
Tailing Dams – A Consultants Perspective
Risk Management and Dam Safety. Reclamation Played a Pivotal Role in Developing Major River Basins in the Western United States.
1 Scoggins Dam Overview of Seismic Risk July 18, 2012.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
2011 MADCS Conference.  FMA is a tool to help identify:  Priorities for rehabilitation  Improvements for operation, maintenance and data collection.
Welcome Rob Rash CEO/Chief Engineer St
Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Sultanate of Oman Oman Drinking Water Safety Plan.
TRAINING SOLUTIONS RISK ASSESSMENT For more information contact Victoria: (Tel) (Fax) ( )
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Certification Requirements
S/W Project Management
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
BUILDING STRONG ® Betting on the Silver Jackets in North Dakota CORPS OF ENGINEERS SHOWCASE: Interagency Silver Jackets Teams Today.
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
El Vado Dam Hydrologic Evaluation Joseph Wright, P.E. Bureau of Reclamation Technical Services Center Flood Hydrology and Meteorology Group.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Emergency Action Plans for Dams in Texas An EMC’s Role With The EAP Presented By: Megan Dutton, P.E. TCEQ Dam Safety Program.
Impact of Low Volume Roads Downstream of Dams on Hazard Classification By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive,
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Salinity Control on the Pecos River Robert E. Mace, Ph.D., P.G. presented at the Multi-State Salinity Coalition’s Salinity Summit January 26, 2012; Las.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Water Resource Management Company (WRM) Ministry of Energy Iranian Approach to Dam Safety - Practice - Achievements - Future plans.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
00/2015 Public Information Centre Addendum to the Environmental Study Report: Millbrook Dam Tuesday, October 20, 2015.
1 Introduction to Engineering Team Design Project Agenda Team project description Introduction to design process. Brainstorming.
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
1  Services Overview  Implementation plan (capacity overview)  Summary of completed project Site Design Services.
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
Dam Safety Program March 2011 Dam Safety Program March 2011.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
SUBCOMMITTEE ON SEDIMENTATION Proposal to become a subgroup under the ACWI September 9, 2003.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Ruttinger & Sons Engineering Designed by: Taylor Kasperick Jacob Wilson Loren Ruttinger Presented by: Loren Ruttinger.
Cumulative Hydrologic Impact Assessment. Quality Assurance \ Quality Control Panel.
Levee management guidelines Viktor Brenners, DEPI FMU.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
US Army Corps of Engineers BUILDING STRONG ® FIMS Annual Comprehensive Training Bridge File Content and Management May 2016.
ATEC Safety Verification Process
Sinclair Wash Stream Restoration Feasibility Study
RESIDENTIAL GARAGE ADDITION
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
Replacement of Vehicle Bridge over Spring Creek
Architecture, Civil Engineer, and Interior Designer
ECE361 Engineering Practice
Joe Bellini, Exelon Drew Miller Exelon April 6, 2012
High Altitude Performance Center
Flooding Walkdown Guidance
Tennessee Safe Dams Program
Replacement of Vehicle Bridge over Spring Creek
CICA Project of the Year Entry Template
Replacement of Vehicle Bridge over Spring Creek
Urban Water Institute 24th Annual Conference Oroville Dam
Presentation transcript:

A SHFORK -B AINBRIDGE S TEEL D AM S TRUCTURAL E VALUATION P ROJECT DWP Engineering Diwei Chen Wen Cui Paul Garrett

V IEW OF STEEL DAM

Background Original drawings of Ashfork- Bainbridge Dam (Bureau of Reclamation)

Designed by Francis H. Bainbridge and built in 1898 by the Atchison, Topeka, and Santa Fe Railway Co. First large steel dam in the United States 46 feet high, 300 feet long and has the elevation of 5,402 feet. It was designed as a cantilever truss with anchorage at the upstream toe. 26 square miles drainage area and a gross capacity of 400 acre-feet

Purpose The goal of the project is to evaluate the structure health of the Ashfork- Bainbridge Steel Dam in order to classify the current hazard potential of the dam.

Stakeholders The National Forest Service Community of Ash Fork, Arizona and occupants of Monte Carlo Truck Service. Arizona Department of Transportation

Studies completed as recent as 2009, by Technical Service Center, rated the dam as low hazard. 1 No maintenance has been performed on the dam in recent years. 2 Recommendations made by previous analyses may be outdated 3 Existing Conditions

Service Details Task 1- Research Task 2- Site Visit Task 3- Evaluation Methods Task 4- Technical Evaluation Task 5- Reevaluation Of Hazard Potential Task 6- Report Findings

Task 1 - Research Existing materials provided by National Forest Service: original design drawings maintenance records emergency action plans and engineering studies

Task 2 - Site visit 1.All existing concerns previously noted will be located and confirmed. 2.Any issues will be documented with pictures and a detailed description. 3.major rust locations and reservoir water levels will be documented and recorded. 4.Check for signs of scour and seepage. 5.A detailed as-built sketch will be created.

Task 3 – Evaluation Method Reference Codes: – Arizona Dam Safety – U.S Army Corps of Engineering These evaluation guidelines will provide the design team with a proper methodology for evaluating the dam.

Task 4 – Technical Evaluation 1.Hydraulic Analysis – Overtopping – 100- year flood – Normal loading

Task 4 – Technical Evaluation 2. Geotechnical Analysis – Bearing capacity analysis 3. Seismic Analysis – Seismic analysis will be based on evaluation guidelines

Task 4 – Technical Evaluation 4. Structural Analysis – SAP 2000 Analysis : overall dam deflection and individual member maximum loads. – Testing rusted steel and broken parts

Task 5 – Reevaluation of Hazard Potential According to definition of hazard potential mode, written on the old reports, different potential hazard failure mode will be checked by calculation and model analysis. A hazard potential rating will be developed.

Task 6 – Report Finding Final report prepared for the Client: 1.Suggested hazard classification 2.Potential failure modes : cost estimation for repair/restoration of most eminent failure. 3.Model analysis and calculation results will be provided to support the recommendation.

Potential Challenges Modeling the steel dam for analysis Assessing scour on dam Quoting for accurate cost

Project Duration:

Tasks Duration Detail

Questions?

T HANKS FOR L ISTENING