An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
What’s The Big Idea? The Energy Economy. It’s the Energy Economy Growth in a Time of Recession Opportunities in the Green Economy Southampton’s Track.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
City of Cape Town Residential Solar Water Heater Accreditation Programme Environmental Resource Management Date: 17/09/2014.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Wesizwe Platinum – Building a Resilient Organisation Jacob Mothomogolo Projects Executive, Wesizwe Platinum Limited 30 October 2013.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Powering Africa – SAPP Strategies
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm VP, Director Lean Enterprise Consulting February 22, 2010.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
E NERGY, E NVIRONMENT AND S USTAINABILITY Gaurav Shukla CUTS International.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
An Overview of Our Regulatory Proposal
ESKOM PRESENTATION TO THE PORTFOLIO COMMITTEE DME PRESENTATION TO THE PORTFOLIO COMMITTEE DME 9 May 2001.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Ján Magyar Department of International Relations in Energy Energy Section Ministry of Economy of the Slovak Republic , SK-NO Cooperation, Bratislava.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
SOCIAL AND LABOUR PLAN.
American Foundry Society – Small Foundry Conference December 3-4, 2008 – Schaumburg, IL Highlight on AFS Energy Management Brian Reinke, President TDI.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
 Lack of skills and capacity in government and communities to roll out interventions  Lack of understanding on how to finance technological interventions;
POTENTIAL AND STRATEGIES FOR DEMAND SIDE MANAGEMENT Dr. Ajay Mathur Director General, Bureau of Energy Efficiency.
A New View on Energy Efficiency An Introduction for Public Power Utilities (Approximately 30 minute presentation)
INTRODUCTION TO THE UNIDO/REEEP TRAINING MANUAL ‘SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA’ User Manual.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
R OCKY M OUNTAIN P OWER C OMPANY DSM OPT-OUT PROPOSAL Utah Industrial Energy Consumers (UIEC) November 3, 2009.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
Module 3 Community Energy Plan Implementation. Overview 3.1Lessons Learned: challenges and success factors for CEP implementation 3.2Partnerships: Working.
Small Water Utilities Improvement and Financing Project Leila H. Elvas Country Team Leader WSP Philippines.
AFRICAN MINERALS & ENERGY FORUM BEE Opportunities in the Electricity Industry Parliamentary Portfolio Committee: Minerals & Energy Prepared by: Cingembo.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Building Energy Efficiency in India An Overview BEE.
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
An embedded cogenerators response Andrew Carr
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
W w w. a u d i t 0 6. f i ENERGY AUDIT ’06 International Conference on Energy Audits Timo Husu Head of Unit, Energy Efficiency Motiva Oy, Finland.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
SANEDI – energy mobility & Green Transport Strategic OVERVIEW
Thembi Kodisang-Sibanda
Developing and Issuing the RFP
The Electricity Distribution Industry
Tennessee Valley Authority – Energy Initiatives and Challenges
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM

Definition of DSM DSM is the process by which electric utilities achieve predictable changes in customer demand, which can be considered as alternatives to the provision of additional generation. The main objective of DSM from a utility point of view is to improve efficiency by reducing the average costs of generating electricity and better utilisation of resources. But also in lower-risk demand-side alternatives, as opposed to system expansion through the construction of new power stations.

History Energy White Paper of 1998 Energy Efficiency in the energy policy document ESKOM - NER endeavors to keep electricity price low ESKOM’s involvement since 1990 in Integrated Strategic Energy Plan (ISEP) to prepare for DSM Formal adoption of DSM research and piloting in Eskom ESKOM, DME and NER partnership on adoption of DSM implementation Energy Efficiency week in July 2003

Benefits of DSM A DSM programme can be implemented within 12 months while it can take more than 10 years to build a new power station. It is far more cost-effective to implement DSM programme than to build a new power station. The customer benefits financially due to the range of Energy- Efficient options he or she can choose from, since the value of the electricity service to customers is improved. Macro-economic development will be supported through job creation and improved productivity. Commercial entities will benefit through savings on monthly electricity accounts, while Electricity Services Companies (ESCos) will benefit by implementing and maintaining the project, as well as through shared savings.

How DSM functions in Practice

DSM Financing Mechanism Capex Opex Funded through Eskom Debt Amortized over 5 years ESKOM DSM COSTS Operating Costs + Interest + Amortization of Capex Recovered from the Tariffs each year Recovered from all Customers NER 35% Shared savings from Customers

DSM Implementation Funding is available to RSA Cities for implementation of DSM. ESKOM – DSM committed to a rollout plan for DSM implementation over 25 years. DSM rollout plan is approved for 10 years

Energy Audit process – typical Questions Does your facility have an energy policy? Are you aware that electricity is a resource that can be managed – and that you can achieve notable savings through Energy Efficiency? Is energy management an integral part of your strategic plan and the way you do business? Do you know how much energy is consumed and how much it costs? Do you know which factors have a direct impact on your energy consumption? Is your staff energy-conscious and skilled in energy management practices?

NEXT STEPS to DO: Appoint an Energy Services Company (ESCo) to plan and do an energy audit for an energy-efficient project your facility. The ESCo must be registered on the DSM database before any project can be accepted. The DSM implementation programme supports BEE companies ESCo’s need to be technically competent and financially sustainable to enter into performance contracts and maintain projects over the long-term. The registration process will require the ESCo to provide company information and details of employees who will be responsible for implementing and sustaining the initiative.

DSM process The proposed DSM project will be evaluated by DSM technical experts and to ensure that the solution is possible and sustainable. The evaluation processes are governed by the PFMA and ESKOM procedures. The project will be evaluated for financial viability.

Who will Benefit, and How? Eskom and Clients –Capital expenditure deferral of building generation capacity and transmission and distribution lines –Keep electricity price as low as possible –Reducing the Green House Gas emission (1 kWh = 0.89 kg of Carbon dioxide) –Less water will be consumed to supply the same number of consumers ( 1kWh = 1.27 litres) –Ensure Energy Sustainability Clients –Savings on monthly electricity accounts ESCo –Responsible for implementing and maintaining the project – Job creation –Shared savings

Goals for the Future To concentrate on DSM programmes that provide win- win-win situations for the customer, ESCo and Eskom. To create the opportunity for Eskom to improve supply- side planning, which results in lowered risks in implementing supply-side solutions. To achieve market transformation and ensure DSM sustainability, which should ensure that the market does not regress to lower levels of efficiency after active participation of the utility has ceased. To reduce the maximum demand by changing the configuration or magnitude of the load shape. In this way, Eskom will be able to accommodate the system demand growth using existing capacity.

In Conclusion National Government owned Buildings Other provincial buildings to follow Commercial Buildings – banks, hospitals, schools, offices, hotels, etc. Municipalities - Ekurhuleni, Nelson Mandela, Mbombela, Worcester, Potchefstroom, etc. Industries - Gold mines, Platinum mines, Textiles, Water supply Industries, Farming, etc.

THANK YOU