Hector Sun-On Chan. BMSB renovation: 1. Construction works started in mid June 2012. 2. Phase I - Works on LG/F, 1/F, 2/F and 6/F were completed in 3.

Slides:



Advertisements
Similar presentations
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Advertisements

SUNY Fredonia Summer 2014 Projects
FSU London Study Centre Heathrow Gatwick Central London.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
New Papworth Hospital Bidders’ Day 7 September 2010.
First Floor Plan Description – First Floor: Library - Two story plus mezzanine Main library on the second floor Office/support spaces on the first fl.
Fall 2010 Convocation. Budget Transparency Leeward Community College Operating Budget.
MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
Campus signage – Internal
Planned Moves, Changes, Issues Library Administrative Council All-Staff Meeting September 10, 2013.
STRENGTHENING TEACHING AND LEARNING THROUGH TECHNOLOGY GRANT AWARD # P031S
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
Strategic Space Study Rial D. Rolfe, Ph.D. Vice President for Academic Services Texas Tech University Health Sciences Center Lubbock, Texas 1.
Church Renovation/ Expansion Proposals Willowdale.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
Whistler Lodge Survey December 2012 Commissioned by the VP Administration.
$16.8 million student funded renovation and expansion of Morgan Library Nov Morgan Library The Place. The People. The Promise.
AGENDA Overview of Building Plans Status of Library Extension Learning Commons Introduction Detailed Plan (Goudie) A/V Production Spaces (PTC) Summary.
Accreditation Visit by Hong Kong Medical Council Date: 10 – 11 November 2008 Visiting Team –Professor Rosie Young (Chairperson) –Dr Ching Wai Kuen (HA)
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
The Catholic Community of St. Thomas More New Building Committee.
Library Building Plans Extension Learning Commons Interaction / Feedback.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Mission-Based Management March 2007 Electronic CV System Users Group.
University of Hawaii Clinical Research Center Louise Medina, R.N., M.H.A. Clinical Program Administrator.
HSMC Library Library Move & Relocation June – September, 2012.
June 2012 THE NEW EAST ASIA LIBRARY. VISION & ASPIRATIONS We strive to make the new East Asia Library the “centerpiece” of Stanford’s East Asian studies.
FSU London Study Centre. Established 1971 Established 1971 Moved to current location in 1993 after renovating facilities Moved to current location in.
Mission-Based Management May 2006 Electronic CV System Users Group.
Tracey Keighley-Clarke, Operations Director, Regional Cancer Program and Mental Health and Addictions Program Child and Youth Mental Health Program & Adult.
State of the College Presentation to ICOMAA, USA July 2012.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
UHWI BIENNIUM BUDGET / Dr. Trevor McCartney Deputy Dean F.M.S. – UWI-Mona Medical Chief of Staff - UHWI Acting C.E.O. – UHWI Acting.
FEC Full Economic Costing of Research (and Teaching and Administrative) Facilities.
UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Schematic design presentation School of Business South Hall Renovation.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
August 13, 2014 Information Technologies & Resources.
SANTARIŠKES MEDICAL VALLEY (CAMPUS) Arvydas Laurinavičius President Association of Santariškes Medical Institutions Vilnius,
PA - Main Administration Office - Centre for Foundation Studies (Foundation in Science) PB - Institute of Postgraduate Studies and Research (IPSR ) - Centre.
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
Developments in Medical Education Peter Benning Associate Director of Medical Education.
POV Renovations November 14,2014. Repairing the East Wall.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
HKU SPACE Po Leung Kuk Community College Building Causeway Bay, Hong Kong 9 September 2008.
1 Federal Funding overview Presentation to Council of Research Associate Deans September 15, 2011 Dan Gilchrist, Federal Relations.
FACILITY IMPROVEMENT PROGRAM SUMMER 2004 NEW CONSTRUCTION –Molecular and Computational Biology Building –Cognitive Imaging Center REMODELED LABORATORIES.
MGH 2.0 Marin General Hospital Finance Committee Meeting November 19, 2015.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
The Aston Campus 2010 – Topics highlighted in strategy discussions Student Experience What makes Aston special? Connections to the City.
OVER VIEW. FACILITIES Block 1 : Academic and Admin Block 2 : Academic Masjid Digitalized Multi lingual library Research Centre Audio Visual theatre Live.
Campus Planning Update Academic Planning & Budget Committee October 28, 2015 Lori Yamauchi, Associate Vice Chancellor Campus Planning.
Building for the Future of Education: Propositions S and N
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
Robinson Park Recreation Center Renovation
Facilities and Sustainability Committee
CAPITAL PROJECT UPDATE
Penn Medicine Chester County Hospital
Facilities Update November 17, 2017
JULY SEPT OCT NOV DEC PCE ONLINE EXAM DATES (PART A,B,C&CEILI)
2007 Bond Issue Capital Improvement Program
New Building for the Department of Chemistry
Westminster House, The Wells Road Centre, Nottingham
Program Review Timeline (as of 2019)
Continuing challenges regarding previous “findings” :
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
IS 551 – Preliminary Schedule
Moving from Consumers to Producers Kings Park Central School District
Presentation transcript:

Hector Sun-On Chan

BMSB renovation: 1. Construction works started in mid June Phase I - Works on LG/F, 1/F, 2/F and 6/F were completed in 3 Sept 2012 and the TEACHING AREAS on these floors were reopened. 3. Phase II - Construction work is still on-going at the other floors and non-teaching areas (G/F, 3/F, 4/F and 5/F). Expected completion date is 9 Dec 2012.

New Dissecting Laboratory with ventilated dissecting tables and surgical light

Embalming Tables Temporary storage refrigerator

Mortuary cold room for 90 cadavers

Tutorial and Specimen Room of Dissecting Laboratory

Demonstration on Upper Limb on 18 Sept 2012

Demonstration on Upper Limb

3 Teaching Laboratories and 2 Tutorial Rooms on 1/F, 2/F and 6/F on 1/F, 2/F and 6/F

2 Computer Laboratories with 120 workstations

Entrance of BMSB on G/F

New Lobby with two elevators

Conference Room on G/F

Student Learning Commons of 480 m 2

Student Learning Commons with Catering Services

7 Tutorial Rooms on 3/F

11 Teaching Laboratories, 2 Tutorial Rooms and 2 Computer Laboratories on 4/F and 5/F

BMSB renovation: 1. Users should enter the building through the lift lobby and Staircase 2 on LG/F, and Staircase 1 on G/F (adjacent to the Medic Canteen). 2. Only users of the 6/F can use the lift on LG/F within blocked time slots (Mon and Tue: 2:00pm-6:00pm; Thur: 9:00am-6:00pm). Users of other floors, please should use the staircases. 3. Construction work is still on-going at the other floors and non-teaching areas. Entrance to these floors and areas is strictly PROHIBITED.

Entrance to BMSB Renovation of BMSB:

Entrance to BMSB Renovation of BMSB:

Clinical Skill Learning Centre Extension: 1)Renovate the Medical Record/OT Changing Room into a teaching area (264.8 m 2 ). 2)Funding was secured from Minor Works Fund and Kai Chong Tong. 3)Work started on 19 September )Expected Completion Date: End of November 2012.

23 Budget: about 2 mil Source: Minor Works Committee

ProjectStart DateCompletion Date Funding Source Spatial Reorganization of 2/F Clinical Sciences Bldg, PWH (Lecture Theatre, Medical Library, Seminar Room, MIT, CSLC) May 2011Aug 2011UGC ($20.6M), Minor Works (0.28M) Spatial Reorganization of Basic Medical Sciences Building Mid June Dec 2012UGC ($21M), CUHK ($9M and Loan $16M) Clinical Skills Learning Centre Expansion, Clinical Service Block, PWH 19 Sept 2012End of Nov 2012Kai Chong Tong (2.5M), Minor Works (1M) Renovation of LG/F of BMSB (1 Teaching Laboratory and 3 Tutorial Rooms) --Possible source: Minor Works (2M) Spatial reorganization of BMSB Extension and Science Centre East Block 2013/14-UGC (21M), pending approval of Legislative Council Development Plan for Upgrading Teaching Facilities in Faculty of Medicine

Hey guy, that’s a really nice working environment.

Acknowledgements UGC CUHK Kai Chong Tong Prince of Wales Hospital Campus Development Office; Estate Management Office Faculty Office, Clinical Science Administration, Planning Office, MDL, MIT, CSLC, Medical Library Teaching Facilities Committee Dean