Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Most slides from September 2006 MAC meeting ILC Cost Versus Performance (Parameter Choices) Tor Raubenheimer SLAC.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Considerations on ILC Crossing Angle K. Yokoya LCWS13, BDS, Tokyo Univ. 2013/11/12 LCWS Yokoya1 Motivation Gamma-gamma collider CLIC.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Minimum Machine Definition: Next Steps Nick Walker AS TAG leaders meeting
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Physics Questions Committee Status Report Brian Foster (Oxford & GDE) SB2009 Meeting DESY 2/12/09.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
7 November 2006 Valencia Global Design Effort 1 Damping Ring Susanna Guiducci INFN-LNF for Jie Gao (IHEP), Andrzej Wolski (Cockcroft Institute) and Mike.
Date Event Global Design Effort 1 ALCPG Briefing on ILC Cost Reduction Studies Ewan Paterson Personal Views GDE May 15, 08.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Conventional Facilities and Siting Global Group (ARCFS)
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Staging in the TDR.
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
CLIC Civil Engineering Update
Central Region Working Group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006

Date Event Global Design Effort 2 What is in this talk An overview of many of the system changes since Vancouver. What changes are still undecided but being discussed? Schedule for the above between now, Valencia and Beijing. This is NOT a talk about single beam delivery systems and push-pull detectors. I will leave that in the capable hands of Phil Burrows in his talk tomorrow.

Date Event Global Design Effort 3 Where are we today

Date Event Global Design Effort 4 Status of the General Layout of Vancouver

Date Event Global Design Effort 5 Ongoing work for discussion – Post Vancouver Approved September m

Date Event Global Design Effort 6 Proposed ILC Layout Approved ??? Maybe today??

Date Event Global Design Effort 7 A sampling of changes in the various systems Most changes are a result of iterations between systems, area and technical systems, to optimize designs and reduce costs. For completeness many basic issues were (and continue to be) revisited. E.g. One versus two tunnels. Many changes being considered depend on the results of R&D efforts that will not be known on the time scale of slide 4. There best judgment of the outcome of the R&D programs is the only guideline. E.g. The achievable accelerating gradient. One cannot be too conservative or the cost goes up up up!

Date Event Global Design Effort 8 The Electron and Positron Sources E-Source…….Changes in layout to minimize civil construction and lower costs E+ Sources Undulator based vs Conventional revisited Do we really need polarized E+……Maybe! What is the impact on ILC design….not small. Could we start with a conventional source and later upgrade to a polarized source….difficult without large upfront investment. Are the radiation problems with a conventional approach soluble……a definite maybe. Should the source be at 150 GeV or at 250 GeV i.e. end of the linac…….low energy running? Present plan is to stay with undulator e+ source (unpolarized at the start) with 10% “keep alive source” at the DR.

Date Event Global Design Effort 9 The LINACS They are still the most challenging and they dominate Technical issues requiring R&D …Gradient and yield Technical system costs….Cryomodules, design and cost Conventional Construction costs….60km of tunnels Many options under consideration from choice of Klystron Modulators etc to Tunnel Diameter and single or twin

Date Event Global Design Effort 10 Tunnel Issues If one tunnel……what size? If one tunnel…… safe exit? If one tunnel……machine availability? If two tunnels….. What size? If two tunnels….. Safe exit? If two tunnels……Machine availability? COST DIFFERENCE We still have two tunnels…the service and the accelerator tunnels!

Date Event Global Design Effort 11 Linac (cont)

Date Event Global Design Effort 12 The LINACS (cont) Unpopular questions that must be asked…..and very personal answers as of 3pm A) What if we install half the RF and have half the luminosity? Yes it is a major cost savings or delay in expenditures but the upgrade is NOT as adiabatic as one might think. Much of the hardware can be installed adiabatically but cannot increase the current and luminosity until most of the linac is done. B) Similar question with energy overhead. You run at 500 GeV on good days! Yes it can save cost but in practice with time taken to tune the accelerator and BDS for luminosity and backgrounds, you will run at lower energy to regain redundancy and average luminosity, all the time.

Date Event Global Design Effort 13 The Beam Delivery System Since Vancouver the BDS has gone on a continuous change or improvement program. 20 and 2mrad >>> 14 and 14 mrad >>>? IR’s at different Z positions (100+m) to the same Z position. “Improved” muon spoilers Total length 5.5km >> 5.1 >> 4.1km? Service tunnel >> alcoves >> service tunnel? Not to mention smaller halls, and maybe one beamline? And now it has to be integrated with DR’s, Injectors and the Linac….. and Detectors

Date Event Global Design Effort 14 Ongoing work for discussion - Vancouver

Date Event Global Design Effort 15 Ongoing work for discussion-Post Vancouver

Date Event Global Design Effort 16 Snapshots at Interaction Regions Vancouver Post Vancouver

Date Event Global Design Effort 17 What is this Central Complex? Put e- and e+ DR’s in a single tunnel Place this tunnel between the linacs. Move the e- injector and the e+ KAS to central complex. RTML takes beams from central complex to beginning of the linacs. ETC. and re-optimize systems to share facilities where possible.

Date Event Global Design Effort 18 Proposed ILC Layout Approved ??? Maybe today??

Date Event Global Design Effort 19 3D Full Scale Layout

Date Event Global Design Effort 20 E+ Injection and E- Extraction Side

Date Event Global Design Effort 21 E- Injection and E+ Extraction

Date Event Global Design Effort 22 Composite layout of CF&S

Date Event Global Design Effort 23 Summary Can we make our schedule? MAC in Jan and RDR in Feb? It is going to be tight but we have to make it! No choice? Can we make more cost significant cost reductions? With help from SiD collaboration pushing and pulling, yes we can! Questions?.....that I can answer!