Conoco Pipe Line - Asset Integrity Database (CPL-AID) zWhat is it and why did we develop it? zWhy a database? zWhat does it do? zMethodology zAdded Benefits.

Slides:



Advertisements
Similar presentations
Gas Compliance System. Based on DOT 192 requirements Non-Compliance Warnings MS Windows look and feel for the user Oracle database on the server Uses.
Advertisements

Microsoft ® Access ® 2010 Training Create queries for a new database.
Microsoft® Office Access® 2007 Training
Software Quality Assurance Plan
MSD Pipe Rating Program AQUA SALUBRIS
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
REMOTE MEASUREMENT OF STRESS IN FERROMAGNETIC PIPELINES Motivation Ageing global pipeline infrastructure Non-invasive, remote, pipeline integrity assessment.
 Project Manager: Kevin Scardino Assistant Manager/Web Master: Nathan Andrews GIS Technician/Data Specialist: Barkley Jenkins GIS Analyst: Mukarram Kamran.
Information Systems Audit Program. Benefit Audit programs are necessary to perform an effective and efficient audit. Audit programs are essentially checklists.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
The Comprehensive Resource Protection Management System: Field Observation Recording Tool Developed by Neal D. Labrie Backcountry Supervior Acadia National.
The Islamic University of Gaza
Post fieldwork analysis – archaeology Module: 10004/SU10 Archaeological reports Dr James Morris Museum of London
Chapter 3 Database Management
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 10 Managing a Database.
Living in a Digital World Discovering Computers 2010.
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
Full Cycle: AMS’ Loss Control Environment is a full cycle loss control management solution that offers comprehensive management of the entire inspection.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
1 Philip Sher Connecticut Department of Public Utility Control Gas Pipeline Safety Unit RepresentingNAPSR National Association of Pipeline Safety Representatives.
Western Regional Gas Conference August 25, 2010 Simple, Handy, Risk-based Integrity Management Plan (SHRIMP)
Discrete Event Simulation in Automotive Final Process System Vishvas Patel John Ma Throughput Analysis & Simulations General Motors 1999 Centerpoint Parkway.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Module 7: Construction Phase
Your Interactive Guide to the Digital World Discovering Computers 2012.
Discovering Computers Fundamentals, 2012 Edition Your Interactive Guide to the Digital World.
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
Objectives Overview Define the term, database, and explain how a database interacts with data and information Define the term, data integrity, and describe.
CIS Case History NACE Eastern Area Conference
 ELECTRI Council Meeting  Information Technology Assessment for Line Electrical Contractors Vanessa Valentin, Ph.D. Assistant Professor Department of.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
Microsoft Office Solution Accelerator for Six Sigma – A Case Study in Project Server Customization Brian Smith Program Manager Information Worker New.
Microsoft ® Access ® 2010 Training Create Queries for a New Database If a yellow security bar appears at the top of the screen in PowerPoint, click Enable.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Safety Stand Down – Together We Will Make the Difference.
ICDA of Gas Transmission, Gathering & Storage Systems GOAL: Develop a protocol for Validation of dry gas ICDA method: –Identify data needs –Develop procedures.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
How to Survive an Inspection Questions What type of inspection is being conducted? Will there be field evaluations involved? What type of information.
METAL LOSS IN-LINE INSPECTION SURVEYS LIMITS AND INACCURACIES.
1 In-line Inspection Results Evaluation and Data Integration Olympic Pipe Line Company Ferndale to Renton 16” Project OPS IMP Workshop Houston, TX August.
Microsoft Access is a database program to manage sort retrieve group filter for certain records.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Information Systems Today: Managing in the Digital World TB3-1 3 Technology Briefing Database Management “Modern organizations are said to be drowning.
Doğalgaz Sektöründe Varlık Yönetimi ve Gaz Kalitesi Consistent Asset Management and Harmonised European Gas Quality INGAS 2009 Istanbul 9-10 June 2009.
1 Chapter 9 Database Management. Objectives Overview Define the term, database, and explain how a database interacts with data and information Describe.
Chapter 9 Vocabulary Databases. 1.Table – a collection of information, or data arranged in columns and rows. 2.Record – all of the information about one.
© 2003 Prentice Hall, Inc.3-1 Chapter 3 Database Management Information Systems Today Leonard Jessup and Joseph Valacich.
Development of IM Inspection Process Workshop on the Integrity Management Rule for Large Liquid Pipelines Bruce Hansen August 7, 2001.
National Institute of Standards and Technology U.S. Department of Commerce Technology Program Evaluation: Methodologies from the Advanced Technology Program.
Yorba Linda Survey : Results Presented by: Andrea Galvin Planning Commission/ City Council Joint Session October 13 th, 7:00 p.m.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
2016 Maintenance Innovation Challenge
Information Systems Today: Managing in the Digital World
Inputs Outputs Tools and Techniques.
Chapter Ten Managing a Database.
Database Management Systems
Integrating Word, Excel, and Access
Databases and Information Management
Databases and Information Management
Final Design Authorization
Presentation transcript:

Conoco Pipe Line - Asset Integrity Database (CPL-AID) zWhat is it and why did we develop it? zWhy a database? zWhat does it do? zMethodology zAdded Benefits of CPL-AID zFinal Pick List Process zClosing

What is it and why did we develop it? zThe Conoco Pipe Line Asset Integrity Database (CPL-AID) is a Microsoft Access database zThis database is not just a data handling tool for ILI Logs zCPL-AID is a historical database zPreviously, anomaly repairs were thought to be final, i.e., “We’ll never dig here again!” zThe above statement is no longer true today zDigging previously dug anomalies is to be expected

Why a database?  The database format is the most efficient method  Properly compiled, all significant pipeline maintenance, survey and repair data can be stored and correlated with this database  The initial database can be easiest constructed from a single digital ILI Log from the joint numbering summary  A database can provide quick and efficient pipeline integrity summaries

What does it do?  There is a multitude of different applications that can be applied to the database. ILI Logs - MFL Corrosion, Caliper, Ultrasonic, and Inertial Logs can be correlated to allow evaluation of all data simultaneously Combining data w/ C-Scans and C.P. data Past integrity repairs can be documented for correlation with present and future ILI Logs for future repair programs The database has tools to assist with an anomaly pick list This database provides reports for the field use

Methodology zCPL-AID utilizes an old method by British Gas (PII) called Joint Numbering and we combine that with the offset distances to create Site ID’s or SID #’s. lThis method improves location accuracy, helping to eliminate unnecessary digs lThis method keeps our DOT records current with our pipeline maps. lThe joint by joint correlation effort is done in the office prior to preparing a dig program, improving our log accuracy and historical correlation effort; thereby, improving our maintenance integrity program.

Added Benefits of CPL-AID zStandardization of Asset Integrity Data throughout the company. lUtilization of same data input forms and verification processes for consistency of data lThe Pipeline Leak and Inspection Report form is used for the main data-input screen zCentralization of integrity and repair data. lAll personnel access the same data, input data the same way and use the same reports

Final Pick List Process zThe pick list is pre-loaded prior to the Project Management Agreement (PMA) meetings. zFace to face PMA meeting is held zStacking of hands on selection criteria and repair criteria before selection zIn addition, system unique repair criteria is discussed and finalized. zHCA’s, environmental, geological, landowners, permitting and site sensitive areas are combined with the analytical data before finalizing the pick list

Closing: zDennis Schulze zConoco Pipeline Company z(406)