Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September 2014 4th.

Slides:



Advertisements
Similar presentations
ENEN RF-induced heating on TCTP ferrite: comparison between different support materials F. Carra, A. Bertarelli, A. Dallocchio, M. Garlasche’,
Advertisements

for a neutrinos factory
Actuation and Alignment Challenges of LHC Collimators M. Garlaschè on behalf of the EN\MME collimation team 1 st PACMAN Workshop CERN, Geneva, Switzerland.
ENEN Collimator Materials for LHC Luminosity Upgrade: Status of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 21/06/2013 N. Mariani.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
ENEN TCP.B6L7.B1: ANALYTICAL AND NUMERICAL EVALUATION OF UNEXPECTED HEATING LHC Collimation Working Group M. Garlasché A. Bertarelli, F. Carra,
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
RF-Accelerating Structure: Cooling Circuit Modeling Riku Raatikainen
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
Status of R&D and Beam Plans for Low-Impedance Collimators F. Carra 1,2 A. Bertarelli, R. Bruce, A. Dallocchio, M. Garlasché, L. Gentini, P. Gradassi,
Ottó Bede TBM Consortium Meeting, Brasimone WP5 - FEM analyses ITER PPE training session 7 December – 11 December 2009, Cadarache, France.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD 2 ColMat-HDED.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Lessons learnt at 5 th High-Power Targetry Workshop Fermilab, May 2015 Federico Carra EN-MME ColUSM
Engineering Department ENEN R&D on Advanced Materials: Status and Future Outlook N. Mariani, A. Bertarelli, F. Carra, A. Dallocchio, E. Krzyzak 1 st Meeting.
ESGARD – OMIA 10 & 11/09/2007 JRA on Collimators and Materials for High Power Accelerators Motivation Work Packages Partners & resources R. Assmann.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
ENEN Collimator Materials for LHC Luminosity Upgrade: Proposal of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 15/02/2013 N. Mariani.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
Engineering Department ENEN Collimator Robustness Studies with BCMS Beams Collimation Working Group F. Carra, A. Bertarelli, R. Bruce, P. Gradassi,
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
BNL Irradiation Facility Use Collimator Materials for LHC Luminosity Upgrade.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD2 ColMat HDED.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
Alessandro BertarelliTS department Seminar, 3 rd May 2006 EDMS Alessandro Dallocchio 1,2 Alessandro Bertarelli 1 1 TS department – Mechanical and Material.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
Engineering Department ENEN Consequences and Possible Cause of Elevated Collimator Temperatures Collimation Working Group L. Mettler, F. Carra,
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Phase II Collimators: design status, options and future outlook LHC.
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
ENEN Research and Development of Novel Advanced Materials for Next-generation Collimators A. Bertarelli, G. Arnau Izquierdo, F. Carra, A. Dallocchio,
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Cern.ch/knowledgetransfer. Knowledge Transfer | Accelerating Innovation Tiago Araújo, CERN KT Training Outline Description of the Technology Development.
SPS High Energy LSS5 Thermal contact & cooling aspects
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
Halo Collimation of Protons and Heavy Ions in SIS-100.
on behalf of the Phase II Collimation Design team
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
M. Tomut GSI Helmholtzzentrum für Schwerionenforschung
Proposal TDIS-TZM WP14 TDIS jaw validation testing
HL-LHC Collimators: Components for absorbers 3rd HiLumi Industry Day - May 2017 Warrington - United Kingdom Oliver Aberle – CERN (EN-STI) On behalf of.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Thermo-mechanical simulations jaws + tank
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
Federico Carra – EN-MME
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
2nd EuCARD2 ColMat HDED annual meeting wrap-up
Phase II Collimators : design status
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
RC1 Prototype Conceptual Design Review 15 December, 2005
US LHC Accelerator Research Program
Presentation transcript:

Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September th September 2014F. Carra– CERN / EN-MME1

Engineering Department ENEN  Engineering in the MME design office  Example of screwed assembly design: LHC tertiary collimator Outlook 4th September 2014F. Carra– CERN / EN-MME2

Engineering Department ENEN 10 Engineers in MME design office (mechanical, aeronautical, materials, …)  Project coordination  Calculations in pre-design and design phases  Analyses on components already installed in the accelerators  Diagnostics on device malfunctioning  R&D: materials, test organization and design, etc.  Engineering specifications, safety files, safety procedures Engineering at MME design office 4th September 2014F. Carra– CERN / EN-MME3

Engineering Department ENEN  Engineering in the MME design office  Example of screwed assembly design: LHC tertiary collimator Outlook 4th September 2014F. Carra– CERN / EN-MME4

Engineering Department ENEN  Beam-induced accidents represent one of the most dangerous and though less explored events for Accelerators.  Beam Intercepting Devices (BID) are inherently exposed to such events  LHC beam energy is 2 orders of magnitude above previous machines. Stored energy density is 3 orders of magnitude higher.  Novel, yet-to-characterize, composite materials are under development to meet these challenges.  New sophisticated and powerful Numerical Tools (Hydrocodes) are used to simulate accidental events. 4th September 2014F. Carra– CERN / EN-MME5 LHC Collimators: Context

Engineering Department ENEN 6 4th September 2014F. Carra– CERN / EN-MME Vacuum tank Jaws Actuation system Jaws  40µm surface flatness on 1m  10µm positioning accuracy  Heat load: up to 30 Kw

Engineering Department ENEN Tungsten (Inermet® IT180) TCTP collimator: brazed vs. screwed 4th September 2014F. Carra– CERN / EN-MME7  50 M4 stainless steel screws (A4-100 silver-coated) are used to fix tungsten blocks to the housing  2 options for the assembly housing/cooling circuit/stiffener:  Brazing with a silver alloy  Screwing with 54 M4 screws (A4-100 silver coated)  All the calculations of tightening torque and preload are done according the German Standard VDI2230 Brazing

Engineering Department ENEN TCTP collimator: brazed vs. screwed 4th September 2014F. Carra– CERN / EN-MME8 BRAZED  Good thermal contact between the components  No risk of relaxation at the interfaces in operation  Expensive and complicated procedure SCREWED  Simple and quick assembling  Cheap  Thermal contact dependent on the screw preload  Risk of stress relaxations at the interfaces, especially during bake-out cycles at 250 ˚C

Engineering Department ENEN Thermal contact at the interfaces 4th September 2014F. Carra– CERN / EN-MME9  In a screwed contact, the thermal conductance is a function of the pressure at the interface:  The higher the conductance, the lower the jaw maximum temperature in operation and the thermally-induced deformations!  With the pressure given by the M4 screws, the calculated conductance is 7000 W/m 2 K  A thermo-mechanical finite element analysis was necessary to understand if the conductance granted by the screws was high enough to guarantee temperatures and deformations within the component specification. Thermal conductance Contact pressure

Engineering Department ENEN Temperatures Deformations Conductance 7000 W/m 2 K Initial temperature: 27 ºC Flow rate inside cooling pipes: 5 l/min Bulk temperature of cooling water: 27 ºC Thermally induced deflection ~ 50  m; Deflection provoked by gravity ~ 25  m; Total deflection ~ (worst case) = 75  m Specification: 100  m  OK! Thermo-mechanical behaviour The conductance theoretically achievable with the screws (7000 W/m 2 K) would be enough to guarantee temperatures and deformations during operation within the specification

Engineering Department ENEN Experimental conductance measurement  The conductance calculation was validated with experimental measurements performed by I. Leitao with an ad-hoc setup  The prototype produced contained 1 screwed jaw and 1 brazed  The screwed jaw has an acceptable conductance in every measured section  Surprisingly, the brazed jaw has a conductance not so much higher than the screwed one!

Engineering Department ENEN Could creep-induced deformations occur during bake-out (~ 250 ºC)?  Eq. stress on CuNi < 60 MPa  Eq. stress on Glidcop Al-15 < 100 MPa  No significant creep deformations expected on TCTP jaw components Copper OFE Copper OFS CuNi alloys Glidcop Creep Resistance Low High Zoom on Glidcop stiffener: stress under the head of a screw Orange area: equivalent stress comprised between 60 and 100 MPa Stress relaxation: FEM analysis 4th September 2014F. Carra– CERN / EN-MME12

Engineering Department ENEN  In case creep and stress relaxation occur, a decreasing in conductance is expected  To rule out creep, we performed complete 3 bake-out cycles (~6days at 250 ˚C), measuring the thermal conductance between pipes and jaw before and after the treatment Stress relaxation: experimental validation 4th September 2014F. Carra– CERN / EN-MME13  No negative effect has been observed!

Engineering Department ENEN 4th September 2014F. Carra– CERN / EN-MME14 Conclusions  Two different jaw designs were proposed for the new tertiary collimators: brazed and screwed  Numerical and analytical calculations, followed by experimental measurements, ruled out problems of unsufficient thermal conductance and creep resistance of the screwed assembly  The prototype produced features one brazed jaw and one screwed, and could potentially be installed in the LHC to prove the validity of the two solutions

Engineering Department ENEN Department of Mechanical and Aerospace Engineering (DIMEAS) F. Carra– CERN / EN-MME154th September 2014

Engineering Department ENEN 4th September 2014F. Carra– CERN / EN-MME16 Conclusions  MME design office engineers are involved in several phases of a component life (pre-design, design, installation, operation).  Analytical and/or empirical techniques are often adopted when studying problems that can be simplified to a certain extent.  For complex structures, implicit FEM codes like ANSYS are usually adopted to perform structural analyses (static, transient, modal, harmonic, …) as well as multiphysics calculations (e.g. thermo-structural, electro-thermal, etc.).  In some exceptional cases, involving material explosion, spallation, change of phase, high non-linearities, the study is performed with Hydrocodes like Autodyn or LSDyna.  An intense material R&D program is also pursued, in collaboration with other MME sections (MME/MM, mechanical laboratory, mechanical workshop), different CERN groups and departments, as well as external European partners, mainly in the frame of the Eucard collaboration (PoliTo, Kurchatov Institute, GSI, RHP, BrevettiBizz, EPFL, etc.).

Engineering Department ENEN Primary Collimator p e p Core Unavoidable losses Shower Beam propagation Impact parameter ≤ 1 mm Primary halo (p) p C-C Collimators are affected by intrinsic limitations which may ultimately limit LHC performances: Poor electrical conductivity (High RF impedance) Limited Radiation Hardness (Reduced Lifetime) Low-Z material (Limited Cleaning Efficiency) C-C Collimators are affected by intrinsic limitations which may ultimately limit LHC performances: Poor electrical conductivity (High RF impedance) Limited Radiation Hardness (Reduced Lifetime) Low-Z material (Limited Cleaning Efficiency) Absorber C-C WW Super- conducting magnets SC magnets and particle physics exp. Courtesy: R. Assmann Novel Materials for Collimators Absorber Phase II Collimator Secondary Collimator The collimation system must satisfy 2 main functions: Multi-stage Beam Cleaning, i.e. removing stray particles which would induce quenches in SC magnets. Machine Protection, i.e. shielding the other machine components from the catastrophic consequences of beam orbit errors. The collimation system must satisfy 2 main functions: Multi-stage Beam Cleaning, i.e. removing stray particles which would induce quenches in SC magnets. Machine Protection, i.e. shielding the other machine components from the catastrophic consequences of beam orbit errors. 4th September 2014F. Carra– CERN / EN-MME17