Improved Geo-location Accuracy For POES Imagery 11 December 2002 NOAA/NESDIS Office of Satellite Operations Office of Systems Development Peter Phillips.

Slides:



Advertisements
Similar presentations
Introduction to the Global Positioning System
Advertisements

NOAA National Geophysical Data Center
Characterization of ATMS Bias Using GPSRO Observations Lin Lin 1,2, Fuzhong Weng 2 and Xiaolei Zou 3 1 Earth Resources Technology, Inc.
Imbedded SSR Mode-S Logic Control Unit University of Stellenbosch Department of Electrical & Electronic Engineering K. Gastrow 4 December 2009.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
1 10/16/2014 HydroLynx ALERT2 Training How to upgrade your system to use the ALERT2 protocol.
Geography & Technology. 1.Geographic Information Systems 2.Global Positioning System 3.Aerial Photographs 4.Satellite Imagery.
A SINGLE FREQUENCY GPS SOFTWARE RECEIVER
Background Accessibility Popularity of GPS and INS –Cell phones Apple iPhone, Blackberry, Android platform –Nintendo Wii Wii Remote, MotionPlus.
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
Using GOES Imagery as Pointing Truth for TEMPO Image Navigation and Registration Kerrie Allen 1, James L. Carr 1, Brad Pierce 2, Joseph Fox-Rabinovitz.
Per R. Bodin Global Posision System GPS. Per R. Bodin Litt historie 1960: nasA & DoD are Interested in developing a satellite based position system with.
GPS Satellites Satellite-based navigation system originally developed for military purposes (NAVSTAR ). NAVSTAR Global Positioning System (GPS) Globally.
University of Pennsylvania Department of Electrical and Systems Engineering ABSTRACT: Quantifying and measuring certain aspects of a golf swing is a helpful.
Chapter 16 GPS/Satnav. GPS Global Positioning System Will eventually replace the older, radio/radar based systems of VOR, ILS and NDB. The US system is.
Patrick Caldwell Chris Kellar. Overview  Basic Concepts  History  Structure  Applications  Communication  Typical Sources of Error.
GPS Status and Modernization Capt Damon Smith PNT Requirements Division Air Force Space Command "This briefing is for information only. No US Government.
Geographic Information Systems
GPS MAPS BY ETHAN HARGARTHER. HISTORY OF GPS & SATELLITE NAVIGATION Sputnik 1 launched in 1957 by the USSR Learned by manipulating satellite orbit that.
How Global Positioning Devices (GPS) work
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
1 Physical Clocks need for time in distributed systems physical clocks and their problems synchronizing physical clocks u coordinated universal time (UTC)
1/28/2010PRRMEC What is GPS… The Global Positioning System (GPS) is a U.S. space- based global navigation satellite system. It provides reliable positioning,
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
What is GPS??? GPS is short for Global Positioning System
Modern Navigation Thomas Herring MW 11:00-12:30 Room A
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
Global Positioning System World’s most advanced communication system.
How Does GPS Work ?. Objectives To Describe: The 3 components of the Global Positioning System How position is obtaining from a radio timing signal Obtaining.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Global Positioning System
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Radiometric Correction and Image Enhancement Modifying digital numbers.
CRGIS Global Positioning Systems The Basics CRGIS National Park Service.
Time Management.  Time management is concerned with OS facilities and services which measure real time, and is essential to the operation of timesharing.
GLOBAL POSITINING SYSTEM WORKING,ERRORS AND CORRECTION USING DGPS Department Of Electronics and Communication Engineering.
Harry Williams, Cartography1 Surveying Techniques II. GPS Despite the fact that Global Positioning Systems use very modern technology, the basic concept.
Introduction To Localization Techniques (GPS)
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Lecture 4: Global Positioning System (GPS)
Global Positioning System (GPS) Satellite Location 20 Satellites in system Each carries very accurate clock Sends a coded signal every millisecond Ground.
Global Positioning System Overview
West Hills College Farm of the Future. West Hills College Farm of the Future Precision Agriculture – Lesson 2 What is GPS? Global Positioning System Operated.
Chapter 2 GPS Crop Science 6 Fall 2004 October 22, 2004.
CCSDS SOIS Working Group Meeting – Berlin, Germany 14th of October 2008 Prototyping of CCSDS SOIS services on 1553 Bus Sev Gunes-Lasnet, Olivier Notebaert.
Satellite Engineering Research Corporation Precise Time Synchronization Throughout the Solar System Robert A. Nelson Satellite Engineering Research Corporation.
1 SVY 207: Lecture 12 Modes of GPS Positioning Aim of this lecture: –To review and compare methods of static positioning, and introduce methods for kinematic.
Principles of the Global Positioning System Lecture 08 Prof. Thomas Herring Room ;
Overview of Current and Future NOAA Polar Satellite Systems Gene Legg Office of Satellite Data Processing and Distribution North America – Europe Data.
Image Enhancement Objective: better visualization of remotely sensed images visual interpretation remains to be the most powerful image interpretation.
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
Satellite Network. Satellite Network 24 satellites in orbit, plus 3 backups lbs, solar powered Orbit height is roughly 20,000 km (Earth radius.
Timing applications of GPS Time for GPS Vivekanandanmurugan Sivaraman Gaurav Sharma John Hannah.
Global Positioning System (GPS) Basics
New Australian High Resolution AVHRR SST Products from the Integrated Marine Observing System Presented at the GHRSST Users Symposium, Santa Rosa, USA,
WEC meeting TED status and WEC timing.
Prototyping of CCSDS SOIS services on 1553 Bus
ACS UC Berkeley Space Sciences Laboratory
CoSMIR Performance during OLYMPEX
SC/ UNIT- 5 CBS RADARSAT / KARTHIKA A, AP/ECE
Surveying Techniques II. GPS
Off-Road Equipment Management TSM 262: Spring 2016
Unit 2 Unmanned Aircraft
First Polar Winds from AVHRR HRPT Data
Presentation transcript:

Improved Geo-location Accuracy For POES Imagery 11 December 2002 NOAA/NESDIS Office of Satellite Operations Office of Systems Development Peter Phillips Cynthia Hampton James Valenti

2 Topics Basics of POES Geo-location and Clock Management The Problem Legacy Architecture and Findings Corrective Actions New System Details Calibration and Validation Operational Implementation User Impact

3 Geo-location and Clock Management Timing information (Day of Year and Millisecond of Day) is embedded in POES imagery data Imagery users geolocate pixels by projecting this time onto an ephemeris-based map of spacecraft location POES spacecraft have no internal means to “know” what time it is--time is set by the ground, and an on-board crystal oscillator provides pulses to advance the clock The on-board oscillator drifts relative to true time, requiring the NOAA/NESDIS Office of Satellite Operations (OSO) to measure the difference between the spacecraft time and a true timing reference--called a “clock delta” OSO clock delta measurements are used in two ways: Provided to users to correct timing information prior to geolocation Used to correct the spacecraft clock to true periodically

4 The Problem OSO-measured NOAA-15 and -16 clock deltas did not match imagery: In example, OSO measured a clock delta of -400 ms, but imagery showed it was ms This caused a geolocation error of over 10 km!

5 Legacy Findings Though synchronized to Global Positioning System (GPS) time, clock delta measurement system only processed spacecraft and ground reference times to nearest 100 milliseconds Expected clock delta measurement error of ±100 milliseconds could not explain magnitude of problem OSO and users had image navigation software which performed “best fit” of pixels using coastlines For 40-day period in 2001 where OSO clock delta measurement for NOAA-16 remained constant at -600 milliseconds, average clock delta from navigation software was +440 milliseconds Navigation results normally distributed, with standard deviation of 600 milliseconds Results consistent between OSO and users

6 Legacy Findings (continued) In 1999, NOAA-15 on-orbit tests to set spacecraft clocks resulted in time being 500 milliseconds off target value on 5 of 8 attempts Clock delta measurement system extracted time code information from different spacecraft data stream than users Used TIROS Information Processor (TIP) data--spacecraft time code only available once every 32 seconds Users extract time code from High Resolution Picture Transmission (HRPT) frames, which is available 6 times per second

7 Corrective Actions NASA engineers discovered “bug” in NOAA-15 and NOAA-16 on- board clock-setting software Used 1 Hz instead of 2 Hz reference to determine hardware cycle Corrected via flight software patch in 2000 In mid-2001, NOAA/NESDIS Office of Systems Development (OSD) engineers discovered incorrect Polar Frame Synchronizer (PFS) TIP data blocking setting for KLM spacecraft Caused clock delta error of -900 milliseconds Reconciling brought clock deltas to within 1  of navigation results OSD procured new clock delta measurement system in 2002 Part of PFS upgrades to Wallops and Fairbanks Command and Data Acquisition Stations (CDAS) Goal was to keep spacecraft clocks within ± 75 milliseconds of GPS reference--equal to dimension of 1 high-resolution pixel

8 New System Details Uses HRPT data stream PFS receives ground timing reference from GPS receiver and performs internal “Time Stamping” as follows: Extracts spacecraft time from header of every third frame of HRPT Latches GPS-based Ground Receipt Time (GRT) to end of frame Passes spacecraft time/GRT data pair to main ground system computer Since Time Stamping is internal to the PFS, blocking and transmission delays no longer impact clock deltas Spacecraft time and GRT processed with 1-millisecond precision

9 New System Calibration New system includes settable GRT offset Accounts for delay from spacecraft time extraction to GRT latch Must be correct for system to produce accurate clock deltas Testing at WCDAS compared new to legacy system Legacy system had proper PFS blocking factor for TIP data New deltas highly consistent within and between contacts New deltas differed from legacy by milliseconds in all cases PFS vendor found 640 millisecond delay in GRT output 360 milliseconds of difference remained between new and legacy WCDAS tests in January 2002 of MIT/Lincoln Labs clock delta measurement system recorded similar differences with legacy Inspection of legacy code showed incorrect block transfer delay term--value of -400 milliseconds, but should be -750 milliseconds

10 New System Validation Timing system calibration validated by Aerospace Corporation and MIT/Lincoln Labs Post-installation testing at WCDAS and FCDAS with corrected GRT offset showed clock deltas consistent with initial test results and identical between stations Navigation of imagery with spacecraft time set to within ± 75 milliseconds of true validated by OSO HRPT ingest system Navigation also validated in Local Area Coverage (LAC) data by Air Force Weather Agency (AFWA)

11 Operational Implementation New system clock deltas first used operationally for NOAA-17 Spacecraft time set to within 2 milliseconds of true on day following launch Users report “excellent” geolocation of NOAA-17 imagery Clock deltas form basis for daily clock corrections to compensate for on-board oscillator drift Archived clock delta information used to determine rate, in milliseconds per day, of drift relative to GPS reference Daily 24-hour clock decrement term in spacecraft stored command table modified to include drift rate correction OSO maintains spacecraft clock deltas to ± 75 milliseconds By August 2002, OSO using new system for clock management of NOAA-14, 15, 16, and 17 spacecraft

12 Operational Implementation (continued)

13 User Impact Direct Data users can now use POES imagery directly, without any need for post-ingest navigation to correct for timing errors!

Backup Slides

15 Navigation Histogram

16 Legacy Architecture

17 New Architecture

18 PFS Blocking Cycle

19 Legacy Clock Delta Equation

20 New Clock Delta Equation

21 Calibration Details PFS software includes settable GRT offset Accounts for delay from spacecraft time extraction to GRT latch Must be correct for system to produce accurate clock deltas Initial testing at WCDAS compared new to legacy system Legacy system had proper PFS blocking factor for TIP data GRT offset was -173 milliseconds--length of 1 HRPT frame plus average link transit time from spacecraft to ground New deltas highly consistent within and between contacts New deltas differed from legacy by milliseconds in all cases PFS vendor notified of test results and reviewed design Found delay in output of ground time code following receipt of IRIG- B clocking signal Delay was 640 milliseconds, causing GRT to be less than expected at time of latch

22 Calibration Details (continued) 360 milliseconds of difference remained between new and legacy WCDAS tests in January 2002 of MIT/Lincoln Labs clock delta measurement system recorded similar differences with legacy Inspection of legacy clock delta calculation code showed incorrect offset term to account for block transfer delay--value of -400 milliseconds, but should be -750 milliseconds Findings explained differences, justified change of GDP 225WA GRT offset from -173 to +467 milliseconds Post-installation testing at WCDAS and FCDAS with new GRT offset showed clock deltas consistent with initial test results and identical between stations Calibration validated by Aerospace Corporation Geolocation Study and MIT/Lincoln Labs