URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

University Medical Center of Princeton Alexander J. Burg Structures Option Senior Thesis 2012 Faculty Advisor: Professor Parfitt Introduction Architecture.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Kirk Stauffer BAE / MAE - Structural Option Senior Thesis Project Life Sciences Building The Pennsylvania State University University Park Campus.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Structural Systems Design for a Laramie Office Building
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
North Shore Equitable Building
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Presentation transcript:

URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION

PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building

PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building

EXISTING CONDITIONS 1 Located in Columbus, Ohio 5 story – 100,000 SF building March 2000 – January 2001 construction duration Total project cost $7 million David Lee Structural Option URS – Arena District Office Building Building Statistics

EXISTING CONDITIONS 2 David Lee Structural Option URS – Arena District Office Building OHIO BASIC BUILDING CODE 1998 STRUCTURAL STEEL  AISC Manual of Steel Construction CAST IN PLACE CONCRETE  ACI 318 – “Building Code Requirement for Reinforced Concrete”  ACI – “Specification for Structural Concrete for Buildings” PRECAST CONCRETE  ACI 318 – “Building Code Requirement for Reinforced Concrete”  PCI MNL 120 – “PCI Design Handbook Pre-cast and Pre-stressed Concrete” METAL DECK  AISI – “Specification for the Design of Cold-formed Steel Structural Members”  SDI – “Design Manual for Composite Decks, Form Deck, and Roof Decks” MASONRY  ACI 530.1/ASCE 6/TMS 602 Table 1 Building Code

EXISTING CONDITIONS 3 David Lee Structural Option URS – Arena District Office Building Typical Floor Framing

EXISTING CONDITIONS 4 David Lee Structural Option URS – Arena District Office Building Lateral Load Direction Factored Base Shear Due to WIND Factored Base Shear Due to SEISMIC North-South Loading Considered Y kip kips East-West Loading Considered X kips kips Existing Lateral System Y X

EXISTING CONDITIONS 5 David Lee Structural Option URS – Arena District Office Building Center of Mass Center of Rigidity Floor Height (feet) Floor to Floor Height Max Displacement X (inch)Y (inch) R Story Drift Seismic Story Drift Limit X (inch)Y (inch) Drift and Torsion

PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building

DEPTH STUDY 1 OBJECTIVES Eliminate Moment Frames Reduce Floor Depth David Lee Structural Option URS – Arena District Office Building CONSTRAINTS North and West façade must be free of obstruction Large open floor space must be maintained Objectives and Constraints

Design: Removed both moment frames Added a braced frame Result: Reduced eccentricity David Lee Structural Option URS – Arena District Office Building Steel Alternative DEPTH STUDY 2

Steel Member Size New steel frame identical to braced frame 1 David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 3 Steel Alternative

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 4 Steel Alternative Constraint Met & Design Goal Achieved

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 5 Steel Alternative Drift and Story Drift Calculated Maximum Drift L/780 *due to wind

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 6 Concrete Alternative Concrete Design Flat plate 2 way PT slab CIP columns Shearwalls

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 7 Concrete Alternative Recalculate Loads Self weight of building increase from 52 PSF to 106 PSF Seismic lateral load controls in both X and Y direction 8.5” concrete slab with density of 150PCF = 106PSF

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 8 Concrete Alternative PT Slab Design Feasibility domain created to obtain possible force, eccentricity combination Steel envelop developed after tendon force is determined Y X

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 9 Concrete Alternative  Max initial deflection = 0.1” Max sustained  deflection = 0.46” Max long term deflection = 1.58”  Limit Floor Deflection L = l /360 D+L = l /240

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 10 Concrete Alternative CIP Column Perform gravity design Consider slenderness effects Check punching shear

David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 11 Concrete Alternative Shearwalls Coincide with elevator shaft and stairwell Max Drift = l /1000 Foundation Larger footings needed Existing foundations require 350CY of concrete Concrete design require 1000CY of concrete for foundation

PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building

BREADTH STUDY 1 Cost and Schedule Considerations Cost Construction Duration Constructability RS MEANS SteelConcrete Cost ($/SF) Duration (days)2753

PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building

CONCLUSION & RECOMMENDATION Recommendation Steel Construction cost savings of $122,000 Shorter construction duration Majority of office building in Columbus use steel frame Concrete Cost savings due to reduced floor depth Flexibility in on-site alterations No lead time

ACKNOWLEDGEMENTS URS Corporation Bill Huckleberry, Structural Engineer ONCORE Construction Raymond E. Sowers AE Faculty Professor Andres Lepage Professor M. Kevin Parfitt Professor Jelena Srebric Professor John Messner Rest of the AE Faculty AE Students Sean Flynn Brian Ault AND All my family and friends David Lee Structural Option URS – Arena District Office Building

QUESTIONS ?