Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

Works done in 2003 ( Minutes and presentations of the RHIC Experiment Shielding Working Group are kept at :
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
SoLID EC Design for IHEP 2012/10. Basic Features of Preliminary Design Based on COMPASS Shashlyk module design. 0.5mm lead/0.12mm air gap/1.5mm scintillator/0.12mm.
Tests of scintillators CsI, CsI(Na), BGO, NaI(Tl) CsI(Tl)
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Excess Radiation Damage of CMS Endcap Hadron Calorimeter and “Finger” Structure of Tiles as a Possible Method of Radiation Hardness Increasing I.Emeliantchik,
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
Russian groups in LHCb: Status report V. Egorychev CERN-Russia JWG, October 2009.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
First CMS Results with LHC Beam
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
The LHCb Electromagnetic Calorimeter Ivan Belyaev, ITEP/Moscow.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
RICH Simulation in LHCb LHC Detector Simulation Workshop S.Easo, RAL, On behalf of LHCb–RICH group.
Experimental Study of the BEPC Ⅱ Backgrounds JIN Da-Peng IHEP, Beijing, China Representing the Backgrounds Study Group May 11, 2007, BEPC Ⅱ IMAC Meeting.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
APS April2000 Meeting Ahmet Sedat Ayan Dept. of Physics & Astronomy University of Iowa.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
PbWO 4 crystals Calorimeter Liping Gan University of North Carolina Wilmington.
CALO News Pascal Perret LPC Clermont 23 October 2011.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1/10 Irradiation test of CW bases Yu. Gilitsky / IHEP (Protvino)
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
27/02/2014 INSTR14 S.Filippov1 First Years of Running for the LHCb Calorimeter System Sergey Filippov (Institute for Nuclear Research of RAS, Moscow) on.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
Results of TCL scans D. Mirarchi, M. Deile, S. Redaelli, B. Salvachua, Collimation Working Group, 22 nd February 2016.
Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino.
Tracking detectors/2 F.Riggi.
SLAWG #15 ZS fiducialisation and alignment today
The LHCb Calorimeter system
Forward Tagger Simulations
The LHCb Installation Story
Properties of Recent SIC Crystals
PMT/CW Irradiation tests-2010
CMS plans for Endcap Calorimetry at HL-LHC
PRR of the TGC SLB and SSW (Reported by CF)
HF QUARTZ FIBER Y.Onel , J.P.Merlo, K.Cankocak, I.Dumanoglu, I.Schmidt and A.Penzo.
Preparation of LHCb for data taking
Accelerator and Experiment Interface Session: LS2, LS3
Sub-Detector Assembly Area Summary of discussion at ALCW2015
CMS ECAL Calibration and Test Beam Results
2017 AFP Beam Tests AFP has 1 week as main user and will also measure together with ATLAS ITk Pixel in H6B -> 2 periods of ~3 weeks
LHCb HCAL: performance and calibration
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
BLM internal review M.Hodgson
Calorimeter technology
Data NIMA 545 Table 3 and Fig.18 NIMA 564 Fig 3 (top)
Zhiwen Zhao,UVa for EC group
Presentation transcript:

Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161

2 The (macro) consequences of radiation damage for ECAL modules: 1)Overall light yield reduction – not harmful by itself, until < ~300 ph.el./GeV (non irradiated module ~ 3000 ph.el./GeV) 2)Longitudinal non-uniformity of response – leads to resolution deterioration, via longitudinal fluctuations of e.m. shower. The latter can be studied by scanning with radioactive source, e.g. 137 Cs (like in HCAL) *. The module irradiated at PS was studied at e - beam; significant degradation observed. For the modules irradiated in the tunnel a noticeable degradation can also take place (~100 krad) The proposal is to perform the scan of these three modules during the winter shutdown 2011/2012. * The general idea and scanner layout: © Rustem Irradiation of ECAL modules One Outer type module was irradiated at PS to ~2 Mrad Two Inner type modules are being irradiated in the LHC tunnel upstream of LHCb near the beam pipe. Expected dose by now: ~100 krad

Yu. Guz 2011/12/163 Study of radiation damage of ECAL modules – Cs scan The scanning tool exists. Same type 137 Cs source as in HCAL Carriage with collimator; remotely controlled motion PMT anode current (DC) readout, like in HCAL ECAL module carriage parking position top shield 5 cm lead

Yu. Guz 2011/12/164 Cs scan procedure – proposal Preliminary, the scan will be performed in February We have to scan total of 5 modules: the 3 irradiated and 2 reference, Inner and Outer types. One source passage back and forth takes ~ 8 minutes ▸ the whole procedure will take < half a day We can either loan from RP the spare HCAL source, 4186RP, or use any of the sources currently installed in HCAL (4145RP or 4146RP). In the latter case, the annual inspection of the HCAL sources can be done the same day ▸ to be decided by RP. The best place for the test is a room in UX85A. ▸ The system will be installed and checked with the reference (non irradiated) modules few days in advance. ▸ The irradiated modules will be delivered to UX85A in advance and kept in the radioactive material storage. After the test the two modules from the tunnel will be installed back at their place for further irradiation. The module irradiated in PS will be kept at UX85A storage till its planned (?) additional irradiation at PS in 2012.