OHT 7.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software development methodologies: - The software development life cycle.

Slides:



Advertisements
Similar presentations
INTEGRATING QA IN PROJECT LIFE CYCLE. Software Development Methodologies  A Project Manager is the one who thinks 9 women can deliver a baby in 1 month.
Advertisements

More CMM Part Two : Details.
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited Review objectives Formal design reviews (FDRs) Participants Preparations.
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 What is software? Software errors, faults and failures Classification.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations.
OHT 4.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Pre-project components Software project life cycle components Infrastructure.
OHT 7.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software development methodologies: - The software development life cycle.
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited Objectives of cost of software quality metrics 2.The classic model.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Components of software quality assurance system overview
OHT 7.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software development methodologies: - The software development life cycle.
SQA Architecture Software Quality.
OHT 17.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Corrective and preventive actions — definitions The corrective and preventive.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Continuing… Peer reviews (Inspections and Walkthroughs) Participants.
Design Reviews Peer Reviews. Agenda Peer Reviews Participants of Peer Review Preparation for a Peer Review Session The Peer Review Session Post-peer Review.
OHT 4.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
Prof. Mohamed Batouche Costs of software quality Introduction  More and more, commercial companies or public organizations are requiring.
OHT 19.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Controlled documents and quality records Definitions and objectives.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
OHT 16.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The objectives of training and certification The training and certification.
Software Quality assurance SQA – SWE 333
SQA Architecture Software Quality By: MSMZ.
Chapter 4 Components of the Software Quality Assurance System
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations The.
S oftware Q uality A ssurance Part One Reviews and Inspections.
Software Quality Assurance Activities
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Formal and Informal Peer Reviews
Phil Cronin Anne Hill Allen Schones CIS841 Summer on Campus 1998 IN-PROCESS INSPECTIONS FOR OBJECT ORIENTED DESIGNS.
Overview of SQA Components
OHT 7.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Chapter 7.1.
S Q A.
OHT 12.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction Types of external participants Risks and benefits of introducing.
Galin, SQA from theory to implementation © Pearson Education Limited Chapter 8.2 Reviews.
OHT 1.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The uniqueness of software quality assurance The environments for which.
CHAPTER 4 Life-Cycle Components. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: Integrating quality activities in the.
Reviews and Inspections. Types of Evaluations Formal Design Reviews conducted by senior personnel or outside experts uncover potential problems Inspections.
OHT 12.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction Types of external participants Risks and benefits of introducing.
SEN 460 Software Quality Assurance. Bahria University Karachi Campus Waseem Akhtar Mufti B.E(UIT), M.S(S.E) AAU Denmark Assistant Professor Department.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Software Quality assurance SQA - SWE 333
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
SEN 460 Software Quality Assurance. Bahria University Karachi Campus Waseem Akhtar Mufti B.E(C.S.E) UIT, M.S(S.E) AAU Denmark Assistant Professor Department.
Prof. Mohamed Batouche An SQA Architecture Project Development plan and Quality Plan Ch.6 Pre-project SQA components Project Life.
Multitude of source of errors - various style of source of errors will affect the SQA components * The environment in which software development & maintenance.
More SQA Reviews and Inspections. Types of Evaluations  Verification Unit Test, Integration Test, Usability Test, etc  Formal Reviews  aka "formal.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Software Project Management Lecture # 12. Outline Quality Management ( chapter 26 - Pressman )  SQA  Who does it?  SQA Activities  Software reviews.
SQA COMPONENTS IN THE PROJECT LIFE CYCLE C HAPTER 8 Dr. Ahmad F. Shubita.
Chapter 7.2. Continuing:  Factors affecting intensity of SQA activities  Verification, validation and qualification  Development and quality plans.
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Components of software quality assurance system overview
Software Quality Control and Quality Assurance: Introduction
Components of software quality assurance system overview
Components of software quality assurance system overview
د. حنان الداقيز خريف /28/2016 Software Quality Assurance ضمان جودة البرمجيات ITSE421 5 – The components of the SQA.
Components of software quality assurance system overview
Engineering Processes
Chapter # 3 The Components of SQA
Integrating quality activities in
Software Reviews.
Model for Quantative Defect Removal
Presentation transcript:

OHT 7.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software development methodologies: - The software development life cycle (SDLC) model - The prototyping model - The spiral model - The object-oriented model Factors affecting intensity of SQA activities Verification, validation and qualification Development and quality plans for small and for internal projects A model for SQA defect removal effectiveness and cost

OHT 7.2 Galin, SQA from theory to implementation © Pearson Education Limited 2004

OHT 7.3 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Source: After Boehm 1988 (© 1988 IEEE)

OHT 7.4 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Source: After Boehm 1998 (© 1988 IEEE)

OHT 7.5 Galin, SQA from theory to implementation © Pearson Education Limited 2004

OHT 7.6 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Project factors: Project’s magnitude Project's technical complexity and difficulty Extent of reusable software components Severity of failure outcomes if the project fails Team factors: The professional qualification of the team members Team acquaintance with the project and its experience in the area Availability of staff members that can professionally support the team Familiarity with the team members, in other words, the percentage of new staff members in the team

OHT 7.7 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Verification – The process of evaluating a system or component to determine whether the products of a given development phase satisfy the conditions imposed at the start of that phase Validation - The process of evaluating a system or component during or at the end of the development process to determine whether it satisfies specified requirements Qualification - The process used to determine whether a system or component is suitable for operational use IEEE Std (IEEE 1990)

OHT 7.8 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The model’s quantitative results: a. The SQA plan’s total effectiveness in removing project defects b. The total costs of removal of project defects

OHT 7.9 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software development phase Average % of defects originating in phase Average relative defect removal cost Requirement specification15%1 Design35%2.5 Unit coding30%6.5 Integration coding10%16 Documentation10%40 System testing Operation

OHT 7.10 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Quality assurance activityDefects removal effectiveness for standard SQA plan Defects removal effectiveness for comprehensive SQA plan Specification requirement review 50%60% Design inspection % Design review50%60% Code inspection % Unit test50%40% Integration tests50%60% Documentation review50%60% System test50%60% Opertion phase detection100%

OHT 7.11 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Defect removal phaseDefect removal effectiveness Average relative defect removal cost {cost unit} Defect origination phase ReqDesUniIntDoc Requirement specification (Req)50%1--- Design (Des)50% Unit coding (Uni)50% Integration (Int) System documentation (Doc) 50% System testing / Acceptance testing (Sys) 50% Opertion by customer (after release) 100%

OHT 7.12 Galin, SQA from theory to implementation © Pearson Education Limited 2004 ·POD = Phase Originated Defects ·PD = Passed Defects (from former phase or former quality assurance activity) ·%FE = % of Filtering Effectiveness (also termed % screening effectiveness) ·RD = Removed Defects ·CDR = Cost of Defect Removal ·TRC = Total Removal Cost. TRC = RD x CDR.

OHT 7.13 Galin, SQA from theory to implementation © Pearson Education Limited 2004 D doc D int D uni D des D req Total ID 15 PD 7.5 %FE=50 RD 7.5 RDRC 1TRC >7.5 cu Req, specification(POD=15) D doc D int D uni D des D req Total ID PD %FE=50 RD RDRC 12.5TRC >26.8 cu D doc D int D uni D des D req Total ID PD %FE=50 RD RDRC TRC >50 cu D doc D int D uni D des D req Total ID PD %FE=50 RD RDRC TRC >66.3 cu D doc D int D uni D des D req Total ID PD %FE=50 RD RDRC TRC >38.9 cu D doc D int D uni D des D req Total ID PD %FE=50 RD RDRC TRC >50.9 cu D doc D int D uni D des D req Total ID PD %FE=50 RD RDRC TRC >139.2 cu Design(POD=35) Unit tests(POD=30) Integration tests(POD=10) Operation bycustomer (POD=0) System tests(POD=0) Documentationreviews (POD=10) Slide 7.12a – relates to updated section 7.4

OHT 7.14 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations The FDR session Post-review activities Peer reviews (inspections and walkthroughs) Participants Preparations The FDR session Post-review activities Peer review coverage Comparison of peer reviews methods Expert opinions

OHT 7.15 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Direct objectives a.To detect analysis and design errors as well as subjects where corrections, changes and completions are required b  To identify new risks likely to affect the project. c. To locate deviations from templates, style procedures and conventions. d. To approve the analysis or design product. Approval allows the team to continue on to the next development phase. Indirect objectives a. To provide an informal meeting place for exchange of professional knowledge about methods, tools and techniques. b. To record analysis and design errors that will serve as a basis for future corrective actions.

OHT 7.16 Galin, SQA from theory to implementation © Pearson Education Limited 2004 DPR – Development Plan Review SRSR – Software Requirement Specification Review PDR – Preliminary Design Review DDR – Detailed Design Review DBDR – Data Base Design Review TPR – Test Plan Review STPR – Software Test Procedure Review VDR – Version Description Review OMR – Operator Manual Review SMR – Support Manual Review TRR – Test Readiness Review PRR – Product Release Review IPR – Installation Plan Review

OHT 7.17 Galin, SQA from theory to implementation © Pearson Education Limited 2004 * Knowledge and experience in development of projects of the type reviewed. Preliminary acquaintance with the current project is not necessary. * Seniority at a level similar if not higher than that of the project leader. * A good relationship with the project leader and his team. * A position external the project team

OHT 7.18 Galin, SQA from theory to implementation © Pearson Education Limited 2004 a. A short presentation of the design document. b. Comments made by members of the review team. c. Verification and validation of comments is discussed to determine the required action items (corrections, changes and additions). d. Decisions about the design product (document), which determines the project's progress: · Full approval. · Partial approval. · Denial of approval.

OHT 7.19 Galin, SQA from theory to implementation © Pearson Education Limited 2004 a. Preparation of the DR report. The report's major sections: · A summary of the review discussions. · The decision about continuation of the project. · A full list of the required action items — corrections, changes and additions. For each action item, completion date and project team member responsible are listed. · The name(s) of the review team member(s) assigned to follow up. b. Follow up performance of the corrections and to examine the corrected sections.

OHT 7.20 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Design Review Infrastructure · Develop checklists for common types of design documents. · Train senior professionals serve as a reservoir for DR teams. · Periodically analyze past DR effectiveness. · Schedule the DRs as part of the project plan. The Design Review Team. Review teams size should be limited, with 3–5 members being the optimum.

OHT 7.21 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The Design Review Session Discuss professional issues in a constructive way refraining from personalizing the issues. Keep to the review agenda. Focus on detection of defects by verifying and validating the participants' comments. Refrain from discussing possible solutions. In cases of disagreement about an error - end the debate by noting the issue and shifting its discussion to another forum. Properly document the discussed comments, and the results of their verification and validation. The duration of a review session should not exceed two hours. Post-Review Activities Prepare the review report, including the action items Establish follow-up to ensure the satisfactory performance of all the list of action items

OHT 7.22 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review leader The author Specialized professionals: –Designer –Coder or implementer –Tester Review leader The author Specialized professionals: –Standards enforcer –Maintenance expert –User representative

OHT 7.23 Galin, SQA from theory to implementation © Pearson Education Limited 2004

OHT 7.24 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Year Defect detection method Defects per 1000 lines of maintained code Test % Design review % Code inspection %

OHT 7.25 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Sections recommended for inclusion Sections of complicated logic Critical sections, where defects severely damage essential system capability Sections dealing with new environments Sections designed by new or inexperienced team members Sections recommended for omission “Straightforward” sections (no complications) Sections of a type already reviewed by the team in similar past projects Sections that, if faulty, are not expected to effect functionality Reused design and code Repeated parts of the design and code

OHT 7.26 Galin, SQA from theory to implementation © Pearson Education Limited 2004 PropertiesDesign reviewInspectionWalkthrough Overview meetingNoYesNo Participant’s preparations Yes - thorough Yes - brief Review sessionYes Follow-up of corrections Yes No Formal training of participants NoYesNo Participant’s use of checklists NoYesNo Error-related data collection Not formally required Formally required Not formally required Review documentation Formal design review report 1) Inspection session findings report 2) Inspection session summary report

OHT 7.27 Galin, SQA from theory to implementation © Pearson Education Limited 2004 · Insufficient in-house professional capabilities in a specialized area. · Temporary lack of in-house professionals for review team. · Indecisiveness caused by major disagreements among the organization’s senior professionals. · In small organizations, where the number of suitable candidates for a review team is insufficient.