Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.

Slides:



Advertisements
Similar presentations
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Advertisements

Sequencing Mining Operations with MineSight® ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
McGill Consulting Asif Kan Alexandre Marinho de Almeida Michael Spleit Ahmed Ragab Mine Production Scheduling of a Porphyry copper deposit February 15,
MineSight VALP Optimizing Cut-Off Grades © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides.
Some Tactical Mistakes to look out for:. In Review: In all cases, when a Company makes a tactical blunder, at least two functional managers are responsible.
Surface Mining (The Concept of Surface Mining) Mnge 315 ©Dr. B. C. Paul Spring 2003 revisions 2010, 2011 These slides contain concepts considered by the.
Surface Mining Ore Deposit Grades ©2011 Dr. B. C. Paul Note- The information contained in these slides is considered common knowledge to those schooled.
Cash Flow Problems are 5 Types Invest and Earn –solve with NPV, maybe IRR or tweeked IRR or ERR All Cost Investment Alternatives –develop cash flows for.
The Quasi - Open Pit Methods Mnge 315 ©Dr. B. C. Paul spring 2003.
Key Concepts Understand the key issues related to credit management
Introduction to Finance Spreadsheets David Scott.
CHAPTER 5 SUPPLY.
CHARGE OUT RATE CALCULATION. SO YOU OWN YOUR OWN BUSINESS? ARE YOU WORKING TO LIVE..,OR LIVING TO WORK? THE CORRECT CHARGE OUT RATE WILL DETERMINE WHICH.
The Firm and Profit Maximization Overheads. Neoclassical firm - A neoclassical firm is an organization that controls the transformation of inputs (resources.
MR2100 (c) Paul Tilley Pricing: Building a Price Foundation Chapter 13 Marketing 2 MR2100.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 How Businesses Work.
Pre-Feasibility Study Cost Estimation Resources ©2002 Dr. Bradley C. Paul.
2008 Sr. Design Project ©Jan 2008 Dr. B. C. Paul Plans were made by the Author. MineSight® is proprietary software of Mintec Inc., Maps are taken from.
1. 2 Recap from Marketing Planning What one thing must your business have in order to be a business?
Chapter 5 Supply.
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Lecture 11 Optimizing Cut-Off Grade Strategy
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
COST-VOLUME-PROFIT ANALYSIS
On Target Group Coaching
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Calculating Stripping Ratios for Area Strip Mines Mnge 315
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
Week 4. SME Weirdness There will be no class from the week of Feb. 16 to 20 th Your report on this work load will be presented on Tuesday Feb. 24 th This.
IE 475 Advanced Manufacturing Costing Techniques
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Credit and Inventory Management Chapter Twenty Prepared by Anne Inglis, Ryerson University.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Obtaining Information From the Geologic Block Model
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
The Loan Welcome! So you’re looking to finance a car? Before you look at taking out loans make sure that you are financially able to pay for a vehicle.
McGraw-Hill/Irwin ©2001 The McGraw-Hill Companies All Rights Reserved 5.0 Chapter 5 Discounte d Cash Flow Valuation.
Introduction to Agricultural and Natural Resources Production Costs and Supply FREC 150 Dr. Steven E. Hastings.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Interpreting VALP Results © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides suggest ways.
Title 5 Emissions Quantification © Dr. B. C. Paul.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Class Introduction Surface Mining ©2007 revised 2011 Dr. Bradley C Paul.
The Balance Sheet.
CENTURY 21 ACCOUNTING © Thomson/South-Western LESSON 15-3 Decisions That Affect Net Income.
Break-even Analysis. Break - Even Analysis (Cost/Volume/Profit Analysis) n This is a planning and control technique. n PLANNING: – make informed decisions.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Computer Aided Mine Design (Part I – Ultimate Pits) Mnge 315 ©Dr. B. C. Paul spring 2003.
How can I make a profit and still run out of cash? Review Financial Statements Cash Flow and Working Capital.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Planning Surface Mines Mnge 315 ©Dr. B. C. Paul 2003.
Cable Shovel Costs ©Dr. B. C. Paul 2000 Do the Cable Shovel l Have a 12 yard P+H Examine Cable Shovel Cycle Time Chart Predicted 26 seconds.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
Open Pit Planning and Design The Standard Approach for Open Pit ©2007 Dr. B. C. Paul.
1 Agribusiness Library Lesson : Options. 2 Objectives 1.Describe the process of using options on futures contracts, and define terms associated.
Molybdenum Ores and Minerals (Another Porphyry Deposit Metal)
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
How we get our minerals and rocks
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
21-1 The Costs of Production  Before anyone can consume to satisfy wants and needs, goods and services must be produced.  Producers are profit-seeking,
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
MANAGING COMMODITY RISK. FACTORS THAT AFFECT COMMODITY PRICES Expected levels of inflation, particularly for precious metal Interest rates Exchange rates,
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Management AccountIng
Supply Producing Goods & Services
Chapter 5: Supply.
Presentation transcript:

Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003

Where We Are At We Developed a Block Model of Our Deposit Geology We Developed a Block Model of Our Deposit Geology We Built Some Economics Assumptions Over the Model We Built Some Economics Assumptions Over the Model –Often Requires us to approximate a Break-Even COV We Determined Our Ultimate Pit at the Final Slope We Determined Our Ultimate Pit at the Final Slope –We used our knowledge of the minable reserve size to crudely calculate our mine size and rate We Determined Our Pit Sequences out to the Ultimate Pit at Working Slope We Determined Our Pit Sequences out to the Ultimate Pit at Working Slope We Made Practical Adjustments to the Computer Aided Pit Sequence We Made Practical Adjustments to the Computer Aided Pit Sequence

Size the Mine Equipment – Life – and COV It was necessary to make approximations on all of these things to get this far It was necessary to make approximations on all of these things to get this far –Example – When got Economic Block Model had to guess basic costs to find out which blocks had enough mineral to pay for processing Ie we applied a break-even COV Ie we applied a break-even COV The pit routines took only blocks that could also carry the stripping costs The pit routines took only blocks that could also carry the stripping costs –Example – Had to have some idea how things were going to be done to know costs for BECOV –Example – Had to have idea of mining rate to pick reasonable increments for staged pits in the sequence

Now Time to Refine and Finalize Break-Even COVs and SRs made sure that all material carried the direct costs of production Break-Even COVs and SRs made sure that all material carried the direct costs of production Costs are composed of Fixed and Direct Costs Costs are composed of Fixed and Direct Costs –Direct costs occur when mining is done and in proportion to amount done Our break-even parameters covered Our break-even parameters covered –Fixed costs occur for being there Foreman, taxes, purchase of equipment Foreman, taxes, purchase of equipment

What Break-Even Does Break-Even ensures that no action will be taken that costs more than it can earn Break-Even ensures that no action will be taken that costs more than it can earn Break-Even does not cover fixed costs Break-Even does not cover fixed costs –Subtle accounting mistake takes fixed costs and distribute them evenly to every ton mined Average Grade and Earnings above Strip must be great enough to cover the fixed costs Average Grade and Earnings above Strip must be great enough to cover the fixed costs

What a Cut-Off Grade Must Do Must make sure don’t loose money by mining (Break-Even) Must make sure don’t loose money by mining (Break-Even) Must make sure that the average grade of the ore mined is high enough to cover the fixed costs Must make sure that the average grade of the ore mined is high enough to cover the fixed costs Doing one does not ensure the other Doing one does not ensure the other –Ie must check both Cut-Offs and pick the higher of the two

BECOV Does Not Guarantee Maximized NPV Lane and Henning Showed COV should be adjusted through life of mine for maximum NPV Lane and Henning Showed COV should be adjusted through life of mine for maximum NPV Start with the Grade Tonnage Relationship for the next increment of “ore”? to be taken and then calculate the COV to use on that increment Start with the Grade Tonnage Relationship for the next increment of “ore”? to be taken and then calculate the COV to use on that increment – We know this because we have staged pits Best COV is one of six COVs to be calculated Best COV is one of six COVs to be calculated

Understanding What Comes Next Most delivery of market ready product requires purchase of equipment for several steps Most delivery of market ready product requires purchase of equipment for several steps –Mining Equipment to remove ore from the ground –Concentrator Equipment to pick out the pay mineral from other stuff Usually involves crushing the ore and putting it through a separator that learn about in 420 Mineral Processing Usually involves crushing the ore and putting it through a separator that learn about in 420 Mineral Processing –Refining Equipment Often the mineral is not what market wants Often the mineral is not what market wants –Can sell copper, not chalcopyrite Refining breaks down mineral to get specific target elements for market Refining breaks down mineral to get specific target elements for market –Market that Buys the Finished Product

Looking at Next Task We are going to size our mining / concentrating and refining equipment We are going to size our mining / concentrating and refining equipment These things will determine how long it takes us to mine through stage pits These things will determine how long it takes us to mine through stage pits –Also interacts with our fixed costs and our cut-off grade Cut-Off grade determines how much of what we mine really goes to processing Cut-Off grade determines how much of what we mine really goes to processing –This too determines mine life

Possible Cut-Off Grades Lane assumes the objective is to make as much money as possible off the next increment but that the system has a bottleneck that limits how much it can handle Lane assumes the objective is to make as much money as possible off the next increment but that the system has a bottleneck that limits how much it can handle Could be mine is the limit - this gives BECOV Could be mine is the limit - this gives BECOV Could be concentrator is the limit - adds a penalty for feeding marginally profitable material into a finite capacity Could be concentrator is the limit - adds a penalty for feeding marginally profitable material into a finite capacity Could be refinery or market Could be refinery or market

Balancing Cut-Off Grades With aide of grade-tonnage chart can pick off grades where capacity from more than one system is fully used With aide of grade-tonnage chart can pick off grades where capacity from more than one system is fully used Could be mine and concentrator Could be mine and concentrator Could be mine and refinery or market Could be mine and refinery or market Could be concentrator and refinery or market Could be concentrator and refinery or market Could be all three Could be all three

The Pick Rules Lane uses rules about size of COVs to pick the optimum from the list Lane uses rules about size of COVs to pick the optimum from the list Process is based on an opportunity cost for mining low grade ore and putting off earnings of high grade into the future where discounting will minimize value Process is based on an opportunity cost for mining low grade ore and putting off earnings of high grade into the future where discounting will minimize value – If you were trying to get rich would you take a job at McDonalds for $5.50 an hour when you could have a job that paid $125,000/year salary?

The Process The pit is divided into push backs of ore that will be mined in each planning period (often one year) The pit is divided into push backs of ore that will be mined in each planning period (often one year) Optimum COV is selected for each planning period Optimum COV is selected for each planning period The NPV is calculated The NPV is calculated Because NPV is a factor in the COVs the process must be repeated Because NPV is a factor in the COVs the process must be repeated The process converges The process converges

What Lane-Henning Did Picked the COV for each pit stage Picked the COV for each pit stage This determined how long it took the equipment to mine through that pit This determined how long it took the equipment to mine through that pit –Collectively this set the mine life How Did we get the size of the mine fleet concentrator and refinery? How Did we get the size of the mine fleet concentrator and refinery? –We just made a guess We use repeated calculations to find the best actual size for the equipment We use repeated calculations to find the best actual size for the equipment –Each try the Lane Henning routine optimizes the COVs

Optimum Size Bang for the Buck (PVR) Size of Mine Economic Feasibility Line This Size Range is Economic This size is optimum

Added Work May also run scenarios with changes in markets or metal price to try to deal with risk May also run scenarios with changes in markets or metal price to try to deal with risk

What We Have This is Long Term Mine Plan This is Long Term Mine Plan –Know ultimate size of pit –Know the steps that will be followed to get there –Know what equipment will be used to get there and which rock will be handled as ore or waste Intermediate and Short Range mine plans start providing detail of which equipment is doing what where on what day Intermediate and Short Range mine plans start providing detail of which equipment is doing what where on what day –Won’t have lot of coverage on these topics in this class

Where Do We Go From Here Next parts of course look at specific operations in more detail Next parts of course look at specific operations in more detail Will examine how to design production blasting rounds (tends to emphasize quarry work) Will examine how to design production blasting rounds (tends to emphasize quarry work) Will look at Sizing and Selection of Common Load and Haul Equipment Will look at Sizing and Selection of Common Load and Haul Equipment –Trucks and Shovels