CSIRO Astronomy and Space Science Technologies for Radio Astronomy Tasso Tzioumis Assistant Director – Engineering June 2015 Mark Bowen Group Leader –

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
SADC HPC Workshop, 2 Dec 2013, Cape Town
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
Technologies for Radio Astronomy CSIRO Astronomy and Space Science Graeme Carrad Assistant Director - Engineering 11 June 2013.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
E-VLBI at ≥ 1 Gbps -- “unlimited” networks? Tasso Tzioumis Australia Telescope National Facility (ATNF) 4 November 2008.
Stability of Maximum S/N Beams CSIRO ASTRONOMY AND SPACE SCIENCE Aidan Hotan | ASKAP Deputy Project Scientist 4 th March 2014 SKA Workshop on Calibration.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
ATUC meeting Director’s Report Lewis Ball May 2009 GASS Image McClure-Griffiths & the GASS team.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Brian Boyle November 2007.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
Time domain science and LSST follow ‐ up in South Africa (+ SKA) Stephen Potter South African Astronomical Observatory.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
H Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Implementation Plan for next 18 months MTR: 12 April 2007 Grenoble.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Graeme Carrad Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 28 June 2011 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
The Square Kilometre Array Dr. Minh Huynh (International Centre for Radio Astronomy Research and SKA Program Development Office) Deputy International SKA.
Update On The Square Kilometer Array World Space Congress October 15, 2002 Jill Tarter.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
The Parkes Ultra-Wideband Receiver
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
First result with PAF on a big single-dish radio telescope X. Deng, A. Chippendale, S. Johnston, G. Hobbs, D. George, R. Karuppusamy ASTRONOMY AND SPACE.
Digital Receivers for Radio Astronomy
The CSIRO ASKAP Science Data Archive Progress and Plans
Mid Frequency Aperture Arrays
Technologies for Radio Astronomy
Phased Array Feeds Wim van Cappellen
Director’s Update AT Users’ Committee -- November 2016
MPIfR Results from the A. Chippendale ATUC, 14 Nov 2016
Pulsar Timing with ASKAP Simon Johnston ATNF, CSIRO
Jim Cordes Cornell University
Rick Perley National Radio Astronomy Observatory
VLA to EVLA Transition Plan
Portfolio Management Process & Customer Request Management
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
Australia Telescope Users Committee Technologies Report – October 2011
Correlator Growth Path
Presentation transcript:

CSIRO Astronomy and Space Science Technologies for Radio Astronomy Tasso Tzioumis Assistant Director – Engineering June 2015 Mark Bowen Group Leader – Front End Technologies

(From last ATUC meeting) ASKAP & SKA: Core business of the Engineering Program. Most of the program’s people and effort at present. Development projects for all ATNF facilities. Depends on budgets. Strategic developments – develop capabilities. External contracts help to maintain capabilities. Broad directions largely unchanged (June 2015) Directions for ATNF Engineering ATUC 2 June 2015

Available resources & allocations After CSIRO restructure (refer last AUC report, Nov 2014) Lost: ~9 positions via attrition and redundancies.  ~ 42 FTE total remained in Technologies Since Nov 2014: Lost: 1 senior digital engineer + 1 retirement Have permission to replace - underway Gained: ~2 FTE short-term contracts – ASKAP production Some recruitments in progress.  Overall largely unchanged! But will grow into next FY. ASKAP : ~ 22 FTE  Ongoing commitment SKA: ~ 11 FTE  Re-structuring after SKA re-baseline More digital group effort? CSP-LOW? Active politicking!! Still only ~5 FTE (fragmented) for ALL other projects!! ATUC 2 June 2015

Staffing – Conferences SKA CSP meeting – Cape Town March 2015 SKA Preliminary Design Reviews - Manchester Document submission Nov – Dec 2014 (~30+ documents/consortium) Australian Site Infrastructure – Feb 2015 Central Signal Processing (CSP) – Dec 2014 Signal and Data Transport (SaDT) – Jan 2015 Dish – Feb 2015 Assembly Integration and Verification (AIV) – Feb 2015 Special session on SKA in ICASSP conference (Brisbane April 2015) ”Signal Processing Challenges for the Square Kilometer Array” John Bunton presented invited paper on “SKA CORRELATORS AND BEAMFORMERS” 4 Participants from Digital group  Very valuable networking SKA-Dish related visits to Manchester AT-RASC (URSI regional meeting), May ASKAP SKA Survey SKA CSP workshop – Penticton Canada (June 2015) ATUC 2 June 2015

CABB (unchanged since last ATUC) Last ATUC: Formal CSIRO commitment ceased Sept 2014 Now ALL tasks covered by post-retirement fellows!! BUT Personal commitment by staff member to continue work on the 16 MHz mode. Possible delivery for 16 MHz end 2015?!  still the target No horizon for 4 MHz mode. NO CSIRO commitment possible. Facilitate as far as possible. Some hope that 16 MHz may be completed. ATUC 2 June 2015

ASKAP Update ATUC 2 June 2015 Aaron Chippendale to update in detail Still to do: Phase closure under TOS control Test zoom modes under TOS control Tied-array processor for VLBI Transient buffer for CRAFT

Ultra-wideband Receiver for Parkes Observed band MHz; Tsys < 20K over most of band Science: pulsar timing, polarisation, interstellar scattering, dispersion, spectral lines, Galactic continuum, VLBI ARC Linkage Infrastructure, Equipment and Facilities grant $370k awarded for 2015 Investigators: Bailes, Gaensler, Wyithe, Bhat, Levin, van Straten, Wen, Melatos, Manchester, Hobbs, Kramer, Han Institutions: CSIRO, Curtin, MPIfR, Melbourne, Monash, NAO/CAS, Swinburne, Sydney, Western Australia Collaboration agreement in development – sign by July 2015 ATUC 2 June 2015

Parkes RFI Spectrum (Sept. 2014) UWB Receiver Band Phone (CDMA/3G) Phone (GSM/3G) Aircraft Satellite Phone (3G) Credit: Dick Manchester, Paul Roberts, Aidan Hotan, Ron Beresford, Brett Preisig

ATUC 2 June 2015 Parkes UWB Feed Design Credit: Alex Dunning Quad-ridge horn with dielectric insert and outer rings Feed/OMT and dielectric cryogenically cooled - outer rings at ambient temperature Low cross-polarization (< -15 db) Beamwidth and focal position almost frequency-independent

ATUC 2 June 2015 Credit: Alex Dunning

Prototype UWB Feed Progress Prototype feed development at CSIRO New technology  MUST test and “retire risk” Proof of concept feed testing in June 2015 – Room temperature ATUC 2 June 2015 Teflon dielectric Feed Horn Outer rings

ATUC 2 June 2015 UWB Feed Installed in Antenna Test Range Credit: Alex Dunning M. Bourne and A. Dunning Installing UWB Feed Credit: Alex Dunning Technological Challenges Cryogenic cooling - Materials Vacuum window Wideband LNA development System integration

Cost of UWB system (ARC proposal) Total direct costs: ~$1M Proposal for 50% from Partners & 50% ARC funds Shortfall: ~$100k from ARC But new partners committed funds at this level. Labour effort (from CASS) at ~$1.5M ~ 6 FTE years effort. Timescale? (~2-3 years?) Need to manage limited CASS resources Existing commitments – ASKAP, SKA, FAST FAST ramp-up will slow progress in the short-medium term SKA re-baseline  limited scope for reallocation of effort? Scope to leverage digital developments from ASKAP/SKA work? Implications for single digital back-end for ALL Parkes systems! Broadly on target to develop – subject to resources! ATUC 2 June 2015

Feasibility study accepted by NAOC. Negotiationg with Chinese for full receiver system design & construction Challenging delivery deadline: September 2016 Fully externally funded. Detailed costing completed. Contract negotiations under way. Strategic relationship with China! MUST nurture & develop!? Resource requirements & conflicts Recruit/Collaborate/secondment? FAST – 19 beam 1.3 GHz receiver ATUC 2 June 2015

ADE PAF and system for MPIfR Contract for standard ASKAP PAF for Effelsberg telescope. Poor RFI environment at Effelsberg – need mods to PAF filtering Also for Parkes: Usable spectrum ~ MHz (GSM bands below 1 GHz) SPECIAL SYSTEM Single dish PAF system PAF filter modifications Modified beamformer outputs Ethernet output  Advanced Modifications externally Funded Strategic use of PAF…. Commissioning/Early science: Request from MPIfR for Bonn PAF at Parkes

Advantages: Attraction of early PAF science at Parkes (~ 1 year) Showcasing single-dish PAF – more customers (e.g. Jodrell Bank) Easier to commission/debug PAF Resources at Parkes from Bonn & others Demonstrate need for Parkes – future funding? More collaborations & outside resources Costs: Effort to install at Parkes – 2-3 months FTE? Disruption of Operations at Parkes Need to maintain Parkes Pulsar effort  Rx changes? (costs?) Commissioning effort (BUT experience very valuable) Recommendation: Benefits outweigh costs?? Bonn PAF at Parkes - Proposal ATUC 2 June 2015

Tentative timelines: Install/Commission: OCT2015 semester? Bonn PAF modifications – by Nov 2015? Parkes preparations: Early in semester – Complete by end 2015? Fibre wiring ~ 2 week shutdown? Other wiring; Racks install; …. Install: Dec 2015 – Jan weeks. Replace MB system for 1 year. Engineering Commissioning: Jan-Mar 2016 Science Commission & Scientific Observations: APR2016 semester? 2-3 engineers/scientists external support Germany and Jodrell Bank Joint CSIRO/MPIfR post-doc OCT2016 semester:  PAF to Bonn Re-install MB system at Parkes?? Develop new PAF system for Parkes?? Bonn PAF at Parkes – Proposed Timelines ATUC 2 June 2015

Commissioning expected to continue throughout 2015OCT Semester - It will not be possible for proposers to request observations using the PAF. Astronomical observing may be possible 2016APR and/or 2016OCT. PAF will not be a National Facility instrument: the control software, documentation and available support will not be to National Facility standard. Collaborative projects with MPIfR or CASS are encouraged – Only a limited number of observing modes will have been tested and a significant contribution of resources towards firmware or software development is likely to be required. Teams wishing to use the PAF for astronomical observing will be required to submit a proposal to the TAC at the regular proposal deadline for the use of National Facility time, explicitly addressing resourcing issues. MPIfR are planning to lead a proposal to use the PAF for FRB detection, and will welcome collaborators who can contribute resources to this project. To be discussed at this ATUC meeting Bonn PAF at Parkes – science collaborations (from discussions with MPIfR) ATUC 2 June 2015

SKA re-baseline No SKA1-survey  re-focus CSIRO effort SKA1-dish involvement reduction PAF AIP to be setup – continue PAF development some effort available in group?  UWB, FAST,… SKAO decision in April 2015: CSIRO to lead SKA1 CSP-LOW (signal processing)  More digital effort? Correlator and Beamformer – Hardware and Firmware Contentious decision within CSP consortium Technical and political discussions on-going Closer collaboration with European partners?? CSP Board meeting – 9 June 2015  Final decision? SKA re-baseline Implications for Technologies program ATUC 2 June 2015

ASKAP & SKA: Core business of the Engineering group. Most of the group’s people and effort at present. CSP-LOW lead? Development projects for all ATNF facilities. Depends on budgets. UWB Receiver at Parkes Single-dish PAF at Bonn/Parkes FAST 19-beam system Strategic developments – develop capabilities. External contracts help to maintain capabilities. Summary ATUC 2 June 2015

Thank you Astronomy & Space Science Tasso Tzioumis t wwww.csiro.au/cass Astronomy & Space Science Mark Bowen t wwww.csiro.au/cass