IRB Space Choice. Considerations Patient access – Most walking, some wheelchair – Access for ambulance stretcher – No line of sight to bench work (?)

Slides:



Advertisements
Similar presentations
Architectural Drawing
Advertisements

A rare opportunity to book an exclusive use apartment block in a much sought after location that can be rebooked on a rolling basis for MIPTV and MIPCOM.
Objective: Develop plans for kitchen cabinets.
31 st August 2007 PROPOSED ADDITIONAL & ALTERATION WORK FOR NEW TRACTOR ROAD,SINGAPORE FOR M/S QIOPTIQ SINGAPORE PTE LTD 31 st AUGUST 2007 PROPOSED.
Architectural Desktop Getting Started By: Tami Mattheis.
Space Planning Research & Precedents Vermont State Offices at National Life.
Warehouse Layout Design Project
Competency: Design and draw interior elevations for kitchens and baths Objective: Explain the elements of kitchen and bath design.
Office Expectations Good morning, Mrs. Venolia!. What does the Office Staff do? n Help students and staff n Answer phones n Assist parents n Paperwork:
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
-FOCAL POINT -TRAFFIC PATTERN -ARRANGING FURNITURE Floor Plan & Furniture Arrangement.
Appreciation Visit to an Art Gallery. Previous questions on L.Cert 2004 – Choose and name a gallery or museum you have visited. Discuss the techniques.
Double storeyed house Galore By Sophie lunn Ensuite:1 Toilets:3 Intercom Study Built-in Wardrobes Dishwasher Ducted Heating Ducted Cooling Remote Garage.
Interpret drawings of domestic structures. Drawing Layout The drawings on the next two pages show how a construction drawing can be laid out to show the.
Strength Training and Conditioning Facilities Day 27 Reference: Earle and Baechle - Chapter 24.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Copyright Michael White and Sandra Thompson, This work is the intellectual property of the author. Permission is granted for this material to be.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Chapter 24 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
My Home By Nick Merlo Go To First Floor See Other VictoriansVictorians See Characteristics Of My HomeHome.
Chapter 12.1 Visual Merchandising & Display
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
MU Condominium 5,000 Baht per month Maximum number of people per room: 3 (4 in case of a family) 2-bedroom (both large and small rooms) 3,000 Baht per.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Visual Merchandising and Display Part 3. Display Areas Storefront Store layout Store interior Interior Displays.
ID 440: Project 1: Hospitality Design
Business and Marketing Unit 6: Promotion
10/7/2008 Halcik, Nair, & Thompson--Triage Space 1 Emory Johns Creek – Triage “Triage is a process, not a place.” Mick White,RN Director of Emergency Room.
Applying Factoring Chapter 10. Solve.  (x – 3)(x – 4) = 0.
PRIVACY AND DIGNITY OF THE PATIENT MAINTAINING STERILITY DURING THE PROCEDURE HAVING ALL THE NECESSARY EQUIPMENTS NEEDED SET UP.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Team 3. …Because the next generation of building is restorative. East Halls.
Navigation NAU 102 Lesson 23. Special Case Bearings We can determine a running fix mathematically as well as graphically. Using: Rules of Thumb Bowditch.
Bedrooms Carsen, Alex, Samantha, Tyler. Location Bedrooms may be located anywhere in the home as long as each bedroom has privacy of sight and sound.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
Electronic counter surveillance.
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Update on ‘Real estate’ for Level-0
Sleeping Area and Bath Facilities
Warehouse Layout Design Project
Furniture Arrangement
Hotels Near Wembley | London Hotels | Wembley Park Hotel UK
Maintain a single control room for all accelerator programs
Architectural Drawings
Open Doors – Storage Committee
Prepared by: Joshima V.M., University of Nizwa.
Prepared by: Joshima V.M., University of Nizwa.
Furniture Arrangement
How to Measure & Draw a Floor Plan to Scale
Architectural Drawing
Vanderbilt Emergency Department Renovation Project
Job Performance Requirement 16-9
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Windows басқару элементтері
Natural Opportunities For Mobility
Around the room Orders of operations.
Toilets In ČRG.
Қош келдіңіздер!.
Objective: Develop plans for kitchen cabinets.
Objective: Explain the elements of kitchen and bath design.
Информатика пән мұғалімі : Аитова Карима.
LIFT,ESCALATOR AND MOVING WALKS
CSC Electronics Installation and Commissioning Oct ‘06
GEn-RP engineering & design Status
Presentation transcript:

IRB Space Choice

Considerations Patient access – Most walking, some wheelchair – Access for ambulance stretcher – No line of sight to bench work (?) Equipment space – 11’ min room width – Room for tube to be completely out of reach of patient during set-up

Patient access- 2 nd floor

Patient access- 1 st floor

Room Layout- 2 nd floor

Patient/Tech Space Scanner Patient/Tech Space Scanner Electronics Rack 120V Double Duplex Data Ports (4) D4 D2 Data Ports (2) D2 D4 Grounding Lug (to existing Cu strap) 208V, 1 , 30A; L6-30R 208V, 3 , 50A; Disconnect 6” Leaded Cable Pass- Through 7’H Partition wall, ¼” Pb-lined ~3’x3’ window, ¼” Pb-equivalent Built-in sitting-height counter Room Layout- 1st floor