Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

ILC Damping Ring R&D Using CESR Mark Palmer Cornell Laboratory for Accelerator-Based Science and Education.
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ILC Damping Ring R&D Using CESR Mark Palmer Cornell Laboratory for Accelerator-Based Science and Education.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 20, 2011.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
CESR-c Plans for CESR (or Life Without CLEO) Mark A. Palmer David L. Rubin Second ILC Accelerator Workshop August 18, 2005.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Mark Palmer for the CESRTA Collaboration
J. Alexander + Cornell accelerator group Cornell University
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
CesrTA Status and Planning
Electron Cloud Studies at CESR-c and CesrTA
Utilization of KEKB for ILC R&D
Recent Electron Cloud Studies at CESR and Future Plans
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Low Emittance Tuning David Rubin Cornell Laboratory for
CesrTA Experimental Schedule and Priorities
CLIC damping rings working plan towards the CDR
CTA 09 - Introduction David Rubin Cornell Laboratory for
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 2 Outline Project Management Structure –Schedule Milestones –Tools –People and Projects –Interface with ILC Damping Rings R&D Structure Coordination Collaboration Technical Metrics Addressing Program Risks –Work Package Example: LiCAS-II –Flexibility –Budget Overview and Costs Conclusion

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 3 Project Plan CesrTA Runs

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 4 CesrTA Schedule Program Focus :Electron cloud growth and suppression (particularly in wiggler chambers) 2009: Improvements to achieve low emittance operations :Evaluations of ultra low emittance tuning and beam dynamics studies (EC and FII) at ultra low emittance 2011:ILC prototype testing (eg, vacuum chambers)

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 5 Milestones I 2008: –Electron Cloud Growth Studies Wiggler chambers –Installation during downs 1 and 2 –Initial tests during CesrTA runs 1 and 2 Dipole Chambers –Installation during down 2 –Initial tests during CesrTA run 2 –Reconfigure the CESR ring for the ultra low emittance lattice (  x- =2.3 nm) during down 2 Wiggler relocation Vacuum diagnostics and instrumentation upgrades –Begin the beam-based and instrumental alignment program to reduce transverse coupling and vertical dispersion –Prepare the optics line for the x-ray beam size monitor for the positron beam. –Begin experiments at low emittance to explore emittance dilution and instability thresholds due to EC and FII effects. 2009: –Complete the upgrade of the BPMs at vertically focusing quadrupoles –Complete the longitudinal feedback upgrade for 4ns capability. –Complete the alignment and survey upgrade (no LiCAS-II) –Commission the x-ray beam size monitor for the positron beam –Install the optics line for the electron beam size monitor –Measure emittance dependent and emittance diluting effects associated with the ECE, FII, and IBS. –Install new vacuum chambers for monitoring the electron cloud and ions in wigglers, dipoles, quadrupoles and drift regions. –Further measurements of electron cloud growth and tests of electron cloud suppression techniques (energy range: 2-5 GeV) –Initial evaluations for the ILC EDR EC Growth and Suppression Emittance impact of ECE and FII

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 6 Milestones II 2010: –Complete the upgrade of BPM system for ultra low emittance tuning –Commission x-ray beam size monitor for electron beam. –Establish optimal emittance tuning algorithms and limits and evaluate the beam species dependence of the emittance performance –Circulate beams of both electrons and positrons with emittance, bunch and charge configuration comparable to the ILC damping ring specifications and measure thresholds for instability and emittance growth –Test prototype ILC wiggler vacuum chamber in CESR wiggler at 5 GeV –Provide ILC EDR contributions 2011: –Conduct beam tests of ILC damping ring prototype components –Continue ultra low emittance beam dynamics and tuning studies

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 7 Tools Resource Management and Scheduling –Microsoft Project based system –Multi-project laboratory Overall manpower matrixing coordinated by Technical Director Cost Management –Project WBS will be integrated with personnel time system for multi-project accounting –Project WBS will be integrated with laboratory budget system for multi-project accounting

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 8 People and Projects I

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 9 People and Projects II Key Project Areas Management Assignments –Alignment, Survey, Stability – D. Hartill, M. Tigner –BPM Upgrade – M. Palmer –Feedback System Upgrade – R. Meller –Machine Conversion – M. Palmer –Magnets and Power Supplies – D. Hartill –Research Program – D. Rubin, M. Palmer –Streak Camera – D. Hartill, R. Holtzapple –Vacuum System Modifications – M. Palmer –X-ray Beam Profile Monitor – J. Alexander

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 10 Interface with the ILC DR Group Cornell R&D activities are coordinated with DR R&D Plan –Collaborator effort to be coordinated via the overall R&D plan Via master work packages for the relevant R&D areas –ILC resource management –ILC progress evaluation –Technical Evaluation Expect that progress will be regularly evaluated via the mechanisms presently being specified for the ILC EDR phase –Yearly reviews of CesrTA progress desirable in this context Expect that key metrics as specified by the damping rings R&D task force and the EDR management will be employed

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 11 Addressing Program Risks (1) 3 Key Areas I. Collaborator contributions Example: Linear Collider Alignment and Survey Group –A. Reichold and D. Urner (Oxford) –STFC funding not available for planned program Approach –Work through the ILC GDE mechanisms to ensure funds and manpower are available for necessary work –Adjust scope in consultation with the damping rings R&D management as needed II. Flexibility R&D program designed for flexibility –Technical solution development will evolve based on initial findings –Beam dynamics studies will evolve based on initial measurements Program relies on –A flexible machine as demonstrated over the last 3 decades –A highly skilled accelerator physics staff –Expert collaborators in the areas under study III. Budget Overview and Costs (see following slides)

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 12 Budget Overview (1) * * Includes X-ray line costs

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 13 Budget Overview (2)

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 14 Cost Drivers Principal Cost Driver: Operations Cost –Capital requirements relatively modest

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 15 Conclusion CesrTA program will be operate within existing project management structures at CLASSE Managers for key areas have been identified R&D program will be fully integrated with the ILC R&D effort –Coordination –Technical evaluation Program has the flexibility to handle likely risks