MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/2015 21/01/15 2.

Slides:



Advertisements
Similar presentations
Wahid Bhimji SRM; FTS3; xrootd; DPM collaborations; cluster filesystems.
Advertisements

The Middleware Readiness Working Group LHCb Computing Workshop LHCb Computing Workshop Maria Dimou IT/SDC 2014/05/22.
New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
DPM Italian sites and EPEL testbed in Italy Alessandro De Salvo (INFN, Roma1), Alessandra Doria (INFN, Napoli), Elisabetta Vilucchi (INFN, Laboratori Nazionali.
IPv6 testing plans 25 Jan Short term – next 6 weeks Add sites to testbed – Glasgow (DPM storage end point) – Fix DESY – Others? Is GridFTP mesh.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Oxford 24 Mar 2015.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
WLCG Operations Coordination report Maria Dimou / CERN With input and on behalf of the WLCG Operations Coordination team May 2015 GDB CERN indico event.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
EVOLUTION OF THE EXPERIMENT PROBE SUBMISSION FRAMEWORK (SAM/NAGIOS) Marian Babik.
StoRM Some basics and a comparison with DPM Wahid Bhimji University of Edinburgh GridPP Storage Workshop 31-Mar-101Wahid Bhimji – StoRM.
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
Storage Wahid Bhimji DPM Collaboration : Tasks. Xrootd: Status; Using for Tier2 reading from “Tier3”; Server data mining.
CERN IT Department CH-1211 Geneva 23 Switzerland t Storageware Flavia Donno CERN WLCG Collaboration Workshop CERN, November 2008.
OSG Area Coordinator’s Report: Workload Management April 20 th, 2011 Maxim Potekhin BNL
Status of the production and news about Nagios ALICE TF Meeting 22/07/2010.
Wahid, Sam, Alastair. Now installed on production storage Edinburgh: srm.glite.ecdf.ed.ac.uk  Local and global redir work (port open) e.g. root://srm.glite.ecdf.ed.ac.uk//atlas/dq2/mc12_8TeV/NTUP_SMWZ/e1242_a159_a165_r3549_p1067/mc1.
Efi.uchicago.edu ci.uchicago.edu FAX status developments performance future Rob Gardner Yang Wei Andrew Hanushevsky Ilija Vukotic.
Stefano Belforte INFN Trieste 1 Middleware February 14, 2007 Resource Broker, gLite etc. CMS vs. middleware.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons 10/12/2014.
1 User Analysis Workgroup Discussion  Understand and document analysis models  Best in a way that allows to compare them easily.
WebFTS File Transfer Web Interface for FTS3 Andrea Manzi On behalf of the FTS team Workshop on Cloud Services for File Synchronisation and Sharing.
Storage Federations and FAX (the ATLAS Federation) Wahid Bhimji University of Edinburgh.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT DPM / LFC and FTS news Ricardo Rocha ( on behalf of the IT/GT/DMS.
Jan 2010 OSG Update Grid Deployment Board, Feb 10 th 2010 Now having daily attendance at the WLCG daily operations meeting. Helping in ensuring tickets.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
Testing and integrating the WLCG/EGEE middleware in the LHC computing Simone Campana, Alessandro Di Girolamo, Elisa Lanciotti, Nicolò Magini, Patricia.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Upcoming Features and Roadmap Ricardo Rocha ( on behalf of the.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
Andrea Manzi CERN On behalf of the DPM team HEPiX Fall 2014 Workshop DPM performance tuning hints for HTTP/WebDAV and Xrootd 1 16/10/2014.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Hammercloud and Nagios Dan Van Der Ster Nicolò Magini.
FAX UPDATE 12 TH AUGUST Discussion points: Developments FAX failover monitoring and issues SSB Mailing issues Panda re-brokering to FAX Monitoring.
WLCG Service Report ~~~ WLCG Management Board, 18 th September
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
SRM v2.2 Production Deployment SRM v2.2 production deployment at CERN now underway. – One ‘endpoint’ per LHC experiment, plus a public one (as for CASTOR2).
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
CMS Experience with the Common Analysis Framework I. Fisk & M. Girone Experience in CMS with the Common Analysis Framework Ian Fisk & Maria Girone 1.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
Acronyms GAS - Grid Acronym Soup, LCG - LHC Computing Project EGEE - Enabling Grids for E-sciencE.
Outcome should be a documented strategy Not everything needs to go back to square one! – Some things work! – Some work has already been (is being) done.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
CERN IT Department CH-1211 Genève 23 Switzerland t DPM status and plans David Smith CERN, IT-DM-SGT Pre-GDB, Grid Storage Services 11 November.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX CERN October 5, 2012 CERN 1
WLCG IPv6 deployment strategy
gLite->EMI2/UMD2 transition
Andrea Manzi, Oliver Keeble
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
Grid status ALICE Offline week Nov 3, Maarten Litmaath CERN-IT v1.0
Taming the protocol zoo
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Marian Babik Andrea Sciabà
1 VO User Team Alarm Total ALICE ATLAS CMS
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
Grid status ALICE Offline week March 30, Maarten Litmaath CERN-IT v1.1
DPM releases and platforms status
WLCG and support for IPv6-only CPU
Andrea Manzi, Oliver Keeble
MB Maarten Litmaath CERN v1.0
Presentation transcript:

MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2

ATLAS eReadinessWorkingGroup DPM Cream-CE dCache StoRM 3 MW Readiness Verification Status 21/01/15

DPM DPM ( with dmlite 0.7.2) Volunteer site : Edinburgh Package reporter installed needs now update![link]link Verification Status Logging issue found with dmlite 0.7.1, new version installed and verified DPM verified No new DPM releases to verify for the moment New DPM-Xrootd needed for Xrootd4 integration under preparation ( see later) 4 MW Readiness Verification Status 21/01/15

CREAM-CE CREAM-CE Volunteer site: INFN-NAPOLI Package reporter installed needs now update![link]link Verification Status The Panda queue has been setup but still no tasks are sent to pilot Under investigation by D. Cameron and other experts 5 MW Readiness Verification Status 21/01/15

dCache dCache and Volunteer sites : Triumf (2.6.38) and NDGF (2.11.4) Package reporter not installed Verification Status Jobs and transfers are ok -> dCache and verified dCache installed at NDGF under verification To contact Triumf for a new version of dCache to be verified ( ?) 6 MW Readiness Verification Status 21/01/15

StoRM StoRM Volunteer sites : QMUL and INFN-T1 Package reporter not installed Verification Status QMUL: Running a pre-release , to update to EMI3 version when available Rucio Transfers are ok, Panda Jobs queue has been setup but no jobs are running yet INFN-T1 has prepared the node for the installation and it should be ready by the end of the week StoRM released today.. 7 MW Readiness Verification Status 21/01/15

CMS reValidation DPM Cream-CE dCache EOS 8 MW Readiness Verification Status 21/01/15

DPM DPM Volunteer site: GRIF Package reporter installed needs now update![link]link Verification Status After the fix for installed both Phedex tests and HC jobs are running fine -> DPM verified for CMS No new DPM releases to be verified (new Dpm-Xrootd under preparation) GRIF site manager is also interested in testing GridFTP redirection (not srm access) 9 MW Readiness Verification Status 21/01/15

CREAM-CE CREAM CE Volunteer site: INFN-LNL-2 (Legnaro) Package reporter installed needs now update![link]link Verification Status Node ready since August Still waiting for HC jobs configuration A. Sciaba’ to report about this Will ask site manager to upgrade to v when we will have test set up 10 MW Readiness Verification Status 21/01/15

dCache dCache 2.6.x /2.10.x? Volunteer site: PIC Package reporter not installed Verification Status The Node has not been configured yet To understand the status and which version to install for testing P. Flix suggested to use the MW readiness instances to test also the xrootd federation + monitoring plugins +1 on this 11 MW Readiness Verification Status 21/01/15

EOS EOS v Volunteer site: CERN Package reporter not installed Verification Status Node ready, CMS Phedex tests under setup 12 MW Readiness Verification Status 21/01/15

LHCb area/DOC/lhcbdirac/rst/html/Certification/tree.html voms-client 13 MW Readiness Verification Status 21/01/15

VOMS-Client 14 MW Readiness Verification Status 21/01/15  Voms-client tested by LHCb  For their particular use case they cannot use it in production ( as reported by Joel the voms-proxy-init command options are different w.r.t version 2)  Not clear if this problem has been reported to devs  New versions has been released in EMI ( 3.0.6)

New Verifications – HT-Condor New versions of HT-Condor have been released: and We agreed to test the condor-g component on some pre-prod/testing ATLAS Pilot Factories To contact then the testing Cream-CE at INFN-NAPOLI Can we plan this activity? 15 MW Readiness Verification Status 21/01/15

New Verifications – Argus During the Argus collaboration meeting in December it has been agreed to perform Argus scalability tests in the context of Middleware Readiness WG Mainly to understand what is causing strange service outages under high load Maarten already agreed with CERN T0 to have a testbed installed here What are the next steps? 16 MW Readiness Verification Status 21/01/15

New verifications – Xrootd 4 deps Xrootd is on EPEL-testing and its move to stable will affect mainly DPM DPM-Xrootd is under preparation and we will ask our volunteer sites to upgrade when ready New Xrootd monitoring and federation plugins have to be also tested 17 MW Readiness Verification Status 21/01/15

New verifications – WN WN is on the list for CMS. Still to contact GRIF as volunteer site 18 MW Readiness Verification Status 21/01/15

Other activities Tested new pakiti client on some internal testbeds Started implementation of the MW Readiness DB REST API and admin interface Needed for Dashboard integration 19 MW Readiness Verification Status 21/01/15

20 MW Readiness Verification Status 21/01/15 Questions?